Detail-oriented technician with expertise in installation, troubleshooting, and safety compliance. Proven ability to deliver quality service and collaborate effectively within teams to ensure project success.
Overview
10
10
years of professional experience
3
3
Certifications
Work History
technician specializing in the installation of dec
Morris Stone Works
Utah Labor Center Condominium
12.2024 - 06.2025
Installed new components or replaced defective parts to restore functionality.
Utilized a variety of hand tools including soldering irons, screwdrivers, pliers, cutters, wire strippers and crimpers.
Took measurements and evaluated dimensions of surrounding area to correctly install new machinery.
Utilized various measuring tools to ensure accurate cuts and installations of components.
Operated and maintained stone cutting machinery for precise material processing.
Coordinated repair and maintenance plans with co-workers and supervisors ahead of scheduled projects.
Completed scheduled appointments on time to drive quality service.
Collaborated with team members to enhance efficiency and ensure timely completion of installation projects.
Followed safety practices to safeguard against injury and damage to property.
Relayed important safety guidelines to clients to achieve thorough understanding of new equipment.
Participated in training to maintain awareness of safety protocols and ensure compliance with industry standards.
Operated various stone cutting and polishing machines for quality finishes.
Maintained tools and equipment to ensure optimal performance and safety standards.
Collaborated with team members to complete projects according to specifications.
Conducted routine inspections to identify and resolve maintenance issues promptly.
Prepared materials for production, ensuring timely availability for workflow continuity.
Followed safety regulations consistently to promote a safe working environment.
Replaced defective components or parts as needed.
Tested and calibrated instruments to ensure accuracy and reliability of data.
Assisted in the development of disaster recovery plans for critical IT infrastructure components.
Installed new appliances, wiring and machinery in homes with defective equipment.
technician specializing in wooden house constructi
Alpine Building Maintenance
American Fork
02.2022 - 12.2024
Estimated cost of labor and materials for projects and communicated value to clients.
Relayed important safety guidelines to clients to achieve thorough understanding of new equipment.
Utilized a variety of hand tools including soldering irons, screwdrivers, pliers, cutters, wire strippers and crimpers.
Followed safety practices to safeguard against injury and damage to property.
Conducted preventive maintenance procedures according to established schedules.
Coordinated repair and maintenance plans with co-workers and supervisors ahead of scheduled projects.
Developed detailed construction task plans to ensure timely project completion and resource allocation.
Performed troubleshooting and repair of equipment in accordance with manufacturer specifications.
LED screen installation technician
pow sang
lima
05.2018 - 10.2022
Installed new equipment according to manufacturer specifications and customer requirements.
Tested completed installations to verify functionality and compatibility with other devices.
Ensured that all cables were securely connected and labeled correctly during installation process.
Adjusted, connected, or disconnected wiring, piping and tubing to complete repairs and installations.
Maintained accurate documentation of installation activities to ensure compliance and facilitate future maintenance.
Ensured that all cables were securely connected and labeled correctly during the installation process.
Provided feedback to supervisors regarding any potential problems encountered during installations or repairs.
Diagnosed electrical faults in order to perform necessary repairs or replacements.
Resolved customer complaints related to installation issues in a timely manner.
Assisted in training other technicians on best practices for installation procedures.
Coordinated repair and maintenance plans with co-workers and supervisors ahead of scheduled projects.
Worked with team members to install and maintain equipment.
Installed equipment according to specifications and safety standards.
Collaborated with team members to ensure timely project completion.
Maintained tools and equipment for optimal performance and safety.
Conducted quality checks on installations to ensure compliance.
Assisted in training new technicians on installation procedures.
Maintained clean tools, test equipment and work motor vehicles.
lighting technician for shows
pow sang
Peru
09.2017 - 10.2021
Operated lighting systems for live events and installations.
Set up and operated lighting equipment for live events such as concerts, theater performances, plays, and other special events.
Tested and inspected lighting equipment before use and made necessary adjustments and repairs.
Conducted routine maintenance on all types of stage lighting instruments including lamps, lenses, reflectors.
Worked with production team to ensure all technical aspects were running smoothly.
Facilitated effective communication among team members to coordinate lighting changes during performances.
Collaborated with team members to optimize lighting setups and enhance show quality.
Followed lighting design plans to properly execute brightness, color and mood.
Adjusted focus points on lights using manual methods or remote controls.
Maintained and troubleshot lighting systems during performances or rehearsals.
Coordinated schedules and timelines to ensure timely setup and operation of lighting for events.
Utilized DMX protocol to connect multiple devices together into one system.
Programmed lighting consoles to create desired looks and effects.
Maintained and troubleshooted lighting systems during performances or rehearsals.
Assisted in the setup and breakdown of lighting for various productions.
Created a variety of color palettes and manipulated light levels through programming consoles.
Collaborated with production teams to design effective lighting setups.
Worked with the production team to ensure all technical aspects were running smoothly.
Collaborated with production team to ensure seamless execution of lighting cues during live events.
Tested all equipment prior to show start times to make sure everything was working properly.
Conducted thorough evaluations of lighting systems to ensure optimal performance and reliability.
Optimized audio console settings for live shows to enhance sound quality and audience experience.
Collaborated with sound engineers to troubleshoot and resolve audio console issues during performances.
Maintained and repaired lighting equipment for optimal performance.
electrical technician specializing in audio
ilumina
lima
08.2015 - 11.2019
Connected and repaired equipment based on mechanical drawings and electrical prints.
Installed new electrical wiring and equipment in accordance with local codes and regulations.
Established outstanding relationships with electricians and consumers.
Provided technical support by troubleshooting issues related to electrical systems.
Conducted performance tests on newly installed equipment to ensure optimal operation.
Tested existing electrical components to ensure proper functioning.
Monitored the performance of existing equipment in order to identify potential areas of improvement.
Installed and maintained electrical systems in laboratory equipment.
Assisted in the development of electrical system specifications and tests.
audio engineer
pow sang
Peru
01.2016 - 2018
Edited and mixed recordings to create desired sound effects using digital audio workstations.
Mastered audio tracks to ensure clarity and consistency across all components of the mix.
Utilized post-production techniques such as compression, equalization, and noise reduction to enhance quality of recorded material.
Utilized post-production techniques such as compression, equalization, noise reduction, and reverberation to enhance the quality of recorded material.
Engineered recording sessions and produced musical soundtracks for artists within various genres.
Managed setup and tear-down of sound and music equipment before and after performances to promote efficient workflow.
Tested sound equipment prior to live performances.
Prepared for recording sessions by selecting and setting up microphones and sound equipment.
Recorded, edited and mixed instrumental and vocal tracks and minimized unwanted sounds.
Education
High School Diploma -
Sound Tech
Peru
03-2014
Skills
Equipment installation
Electrical troubleshooting
Safety compliance
Technical documentation
Machinery operation
Preventive maintenance
Time management
Adaptability
System installation
Plant operations support
Problem-solving
Dial/Digital/Vernier calipers
System troubleshooting
Quality control
Inventory oversight
Design Techniques
Software installation
Hardware installation
Network administration
Construction management
Residential construction
Instrument Calibration
Languages
Spanish
Native/ Bilingual
Quechua
Full Professional
English
Elementary
Certification
jbl audio
Accomplishments
responsible for receiving internationally renowned artists in Peru
Timeline
technician specializing in the installation of dec
Morris Stone Works
12.2024 - 06.2025
technician specializing in wooden house constructi