Versatile Operations Supervisor adept at taking on routine and complex business challenges with a resourceful and creative approach. Recognized as a driven, dedicated and hardworking leader with a history of streamlining operations and increasing efficiency. I believe that a combination talent and training guided with continuos improvement drives Technicians to enjoy there work and therefore is more productive which benefits both the Client and JLL.
Overview
1
1
Certification
3
3
years of post-secondary education
10
10
years of professional experience
Work History
Operations Supervisor
Jones Lang LaSalle, JLL
Greer, SC
12.2018 - Current
Monitored daily and weekly key performance indicators to maintain on-track status.
Enhanced operational efficiency and reduced labor expenses by developing and optimizing standard practices.
Reviewed and assessed ongoing operations, developing initiatives for continuous process improvement.
Performed root cause analysis in deficient areas to identify and resolve central issues.
Developed and deepened relationships with customers, vendors and internal stakeholders.
Created and implemented strategies for improving operational efficiency and accuracy.
Enforced regulatory and company policy compliance to improve workplace and employee safety and readiness.
Motivated and trained employees to maximize team productivity.
Applied performance data to evaluate and improve operations, target current business conditions and forecast needs.
Maintained cleanliness and organization of workspace, working closely with employees to systemize tasks.
Assisted in recruiting, hiring and training of team members.
Observed each employee's individual strengths and initiated mentoring program to improve areas of weakness.
Supervised 15 employees on 1 shift, overseeing efficiency of Work Orders and Preventive Maintenance of a 16 Million Sq ft. Plant..
Supported regulatory compliance by conducting audits to verify protocol adherence.
Generated and developed Lead Technicians.
Promoted positive customer experience through day-to-day supervision and management of facility.
Trained new employees on proper protocols and customer service standards.
Worked directly with management, to brainstorm, discuss strategy and mitigate issues.
Preventative Maintenance Supervisor
ABM Industries
Greer, SC
07.2015 - 12.2018
Kept track of equipment, inventories and system upgrades in order to prepare and present detailed reports to upper management.
Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
Assessed operating conditions and adjusted settings to maximize performance and equipment longevity.
Established and documented protocols for preventive maintenance procedures, decreasing equipment issues and reducing downtime
Monitored priorities and liaised between maintenance team and management, delegating tasks to complete on time.
Kept watchful eye on equipment inventories, optimizing work readiness and aligning supplies with specifications for each job.
Procured pricing information from various vendors to support cost-effective purchasing.
Reviewed and studied schematic diagrams to properly plan and process assignments.
Observed guidelines, specifications and detailed instructions to meet strict operational and maintenance regulations.
Analyzed and identified equipment failure root causes and initiated correction actions.
Monitored equipment, tools and system upgrades to compile data into detailed reports for upper management.
Paid close attention to guidelines, specifications and detailed instructions to continuously adhere to strict operational and maintenance regulations.
Created and followed detailed maintenance schedules for equipment, resulting in increase in equipment lifetime.
Supervised employees, including scheduling, training and performance monitoring.
Residential Construction Worker
General Contractor Eugene Hernandez
Spartanburg, SC
01.2011 - 07.2015
Operated [Type] and [Type] tools to cut, shape and smooth lumber and other construction materials.
Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
Installed valves, hangers, supports and flanges inside piping systems.
Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
Crafted piping, including measuring, threading and cutting materials to correct angles.
Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates.
Cut openings in structures to accommodate pipes and pipe fittings with [Tool] and [Tool].
Interpreted blueprints to determine locations, quantities and sizes of materials required.
Accurately measured piping, cutting to fit where needed.
Safely operated electric cordless and hammer drills and cutting torches.
Diagnosed issues and developed effective solutions.
Facilitated harmonious working relationships with crew members to prevent problems and conflicts.
Utilized customer feedback to develop plans and solve problems.
Inspected structures to avoid any obstruction and delays throughout project.
Complied with all state plumbing codes throughout duration of each project.
Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
Read blueprints to determine appropriate materials and procedures for each project.
Eliminated risks by correctly identifying potential safety hazards.
Independently worked on projects, while offering process coordination and cooperation with other teams.
Planned and executed work with proper tools and materials to maximize efficiency.
Adhered to safety protocols, OSHA standards and building codes in installation of systems, operation of equipment and handling of materials.
Led variety of projects from start to finish, including garages, residential homes and additions.
Enforced production safety and quality by supporting leadership in determining solutions for process issues and inefficiencies.
Aligned and squared frames and forms for installation.
Kept team members safe and job sites free of hazards by maintaining good organizational skills at all stages.
Monitored tool and equipment condition and arranged repairs as needed.
Reviewed blueprints and project specifications to determine correct plumbing solutions.
Installed interior finish items, including wall protection, doors and hardware, toilet accessories, cubicle curtain tracks and TV brackets.
Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
Requisitioned tools and equipment to select type and size of pipes needed for projects.
Offered valuable suggestions to clients' remodel needs.
Effectively used all fasteners such as nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Education
High School Diploma -
Windsor Forest High School
Savannah, GA
08.1978 - 05.1981
Skills
Logistics expertise
undefined
Accomplishments
Decorated US Army Veteran, served from Aug. 1981-May 1989