Overview
Work History
Education
Skills
Timeline
Generic

William Wierman

Olalla,WA

Overview

38
38
years of professional experience

Work History

Service Tech 1

Liberty Military Housing
Lakewood, WA
02.2021 - Current

proficient at the in house turn

ordering parts

Q.C. units both in house and vendor

run turn crew

assist vendors

identify and request vendor work

escort D P W each morning

training team members

create touch and feel lists for them

walk future units for potential issues, hard to get parts, or vendor work that was missed

followed established safety rules, OSHA guidelines and company safety policies and procedures

applied knowledge of carpentry and general construction to finish work

Project Engineer

Topline Counters
Sumner, WA
11.2019 - 11.2020

traveled to job sites and made templates for countertops

input them into a CAD drawing program to produce a template that can be programmed into the C/C machines

Installer/ Field Coordinator

Interior Form Tops
Milton, WA
10.1999 - 11.2019

1st 15 years

installed countertops to include laminate, solid surface

installed laminate tub surrounds and showers

installed laminate wainscott and window sills

last 5 years- Field coordinator

scheduling to include- material ordering, field measures, manufacture, installation, Q.C. and follow up

ran the installation dept typically 5 to 9 people

ran the delivery dept typically 2 people

was main contact for superintendents and project engineers

coordinated with them on scheduling, design and any on site issues that would arise

performed all field measures

produced monthly sales projections

did all hiring for the departments I ran

assisted with estimating


Carpenter

Wierman Construction
Olalla, WA
06.1984 - 10.1999

concrete to include-footings, foundation, slabs, driveways, and sidewalks

framing to include-floors, walls, roof, decks, and stairs

siding to include-lap, t1-11, and shingles

windows to include-windows, sliding glass doors and garden windows

roofing to include-comp, shakes, shingles, metal and torch down

drywall to include-hanging, taping and texture

painting to include- interior, exterior and trim

door hanging to include-interior, exterior, by-fold, by-pass and pocket

flooring to include-sheet vinyl, tile, hardwood, plank and carpet

millwork to include-hanging cabinets, base, casing, window sills, aprons, and crown molding

countertops to include-laminate, corian and tile

Education

High School Diploma -

South Kitsap High School
Port Orchard, WA
06.1984

Skills

carpentry

management

scheduling

troubleshooting

turning

Timeline

Service Tech 1

Liberty Military Housing
02.2021 - Current

Project Engineer

Topline Counters
11.2019 - 11.2020

Installer/ Field Coordinator

Interior Form Tops
10.1999 - 11.2019

Carpenter

Wierman Construction
06.1984 - 10.1999

High School Diploma -

South Kitsap High School
William Wierman