Summary
Overview
Work History
Education
Skills
Timeline
Generic

Williams Ramones

Oxford,GA

Summary

Dynamic Project Manager with a robust construction background at Vera's Company, skilled in blueprint interpretation and carpentry. Proven track record of building strong partnerships and delivering high-quality projects on time. Spanish speaker with expertise in enhancing collaboration and ensuring rigorous compliance with safety protocols. Committed to exceeding client expectations through innovative solutions.

Overview

9
9
years of professional experience

Work History

Project Manager

Vera's Company
Loganville, GA
08.2024 - 02.2025
  • Built and established strong partnerships with teams, vendors and contractors.
  • Focused on project monitoring and management by developing forecasts and tracking expenses.
  • Developed and maintained project plans, timelines, and budgets.

Cabinet Installer

Vera's company
Loganville, GA
01.2023 - 07.2024
  • Worked efficiently under tight deadlines without compromising quality of workmanship.
  • Measured, cut, and installed baseboards, crown molding, and other trim pieces to complete cabinet installations.
  • Reviewed work to check compliance with design specifications and quality requirements.

Home Remodeler

M&R supply
Stone Mountain, GA
01.2022 - 12.2022
  • Performed demolition of existing walls, floors, and ceilings to prepare for new construction.
  • Installed drywall, framing, insulation, cabinetry, countertops and trim.
  • Adhered strictly to safety protocols while working onsite at customers' homes.
  • Removed old fixtures such as sinks, toilets and bathtubs to replace with new ones.

Remodeling Contractor

ProServe Solutions
Alpharetta, GA
06.2019 - 02.2020
  • Coordinated communication between equipment operators via two-way radios and hand signals.
  • Read and understood specifications, drawings and blueprints to complete accurate, high-quality work.
  • Trained in plumbing, carpentry, painting, plastering, machine servicing and installation.
  • Followed plans, orders and technical specifications to complete accurate work that met project specifications, codes, and quality standards.
  • Assisted distribution of tools, materials and equipment to skilled workers.
  • Provided industry insight to coworkers to assist work completion.

Remodeler

Finite Reimaging
Chicago, IL
02.2019 - 06.2019
  • Measured rooms accurately before starting any construction project.
  • Managed projects in progress simultaneously by frequently checking supply inventories and work orders.

Finish Carpenter

Taylor Morrison
Cumming, GA
05.2018 - 12.2018
  • Studied blueprints or building plans to prepare layout and materials required.
  • Repair furniture cabinets counters floors walls by replacing damaged parts such as hinges knobs drawers panels.
  • Work safely following all safety guidelines rules regulations policies procedures standards of conduct dress code workplace etiquette.

Remodeler

Sirisa Lawnscape
Atlanta, GA
11.2017 - 05.2018
  • Coordinated with subcontractors to ensure timely completion of projects.
  • Operated equipment with strong focus on safety and ground communication.

Remodeler

Self Employed Web
Atlanta, GA
04.2017 - 10.2017
  • Worked with clients to find appropriate material sources according to client budgets and specific project needs.
  • Performed demolition work to remove existing structures in preparation for new construction.

Remodeling Crew Member

M&R supply
Stone Mountain, GA
02.2016 - 03.2017
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Construct stairs by measuring tread depth, riser height, width of stairway opening. Then cut stringers accordingly with power saws or handsaws.
  • Install drywall panels or tiling over walls and ceilings using adhesive material or nails.

Education

High School Diploma -

La Rosa Mistica
Venezuela
05-2015

Skills

  • Blueprint interpretation
  • Construction background
  • Repair skills
  • Carpentry background
  • Fluent in Spanish
  • Remodeling background
  • Forklift operation

Timeline

Project Manager

Vera's Company
08.2024 - 02.2025

Cabinet Installer

Vera's company
01.2023 - 07.2024

Home Remodeler

M&R supply
01.2022 - 12.2022

Remodeling Contractor

ProServe Solutions
06.2019 - 02.2020

Remodeler

Finite Reimaging
02.2019 - 06.2019

Finish Carpenter

Taylor Morrison
05.2018 - 12.2018

Remodeler

Sirisa Lawnscape
11.2017 - 05.2018

Remodeler

Self Employed Web
04.2017 - 10.2017

Remodeling Crew Member

M&R supply
02.2016 - 03.2017

High School Diploma -

La Rosa Mistica
Williams Ramones