Demonstrated success in leading crews, planning jobs and keeping projects on schedule. Steps in and work alongside team members to get job done quickly. Well-versed in operating, servicing and maintaining heavy equipment.
• CSU 1 LM6000 BH Turbine
• CSU 1 Nuovo Pigeon 49k CFM Centrifugal 2 stage MR Compressors
• CSU 6 Lube Oil auxiliary systems
• CSU 9 1st stage & 2nd stage fin fan Cooler packages
• CSU 2 Low pressure amine Ruhrpumpen pumps
• CSU 2 High pressure amine Ruhrpumpen pumps
• CSU 1 Regeneration Sundyne compressors
• CSU 3 12 MW Siemens GTG400 Turbine & Generator
• CSU 1 Atlas Copco 4 stage Feed Gas Booster compressor
• CSU 1 Atlas Copco 6 stage Boil off gas compressor
• Maintained adequate inventory of spare parts to prevent critical downtime.
• Monitored safety compliance to maintain strict standards and protect team members from harm.
• Evaluated results to determine quality levels and isolate root causes of any identified faults.
• Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
• Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
• Protected workers and general public by enforcing strict safety practices.
• Reported on work progress to manager and incorporated feedback to maintain tight schedules.
• Delegated team assignments reviewed work and set schedules to maintain optimal coverage of all commissioning mechanical needs.
• Implemented quality programs, evaluated results and improved service policies to meet changing needs.( B & C sheets-ITR's )
• Monitored priorities and liaised between commissioning team and management, delegating tasks to complete on time.
• Contributed to development, implementation and execution of maintenance programs.
• Monitored systems to assure increase in power flow and integrated new system components, fixtures and motors.
• Worked with client to ensure safe and proper testing and running of equipment.
• Wrote and distributed all Permits, concerning the work we were involved in.
• Removed and replaced equipment as needed. With use of a construction crew.
• Supported IOT with all mechanical needs.
• Worked with BH rep during solo and dynamic runs.
• Scheduled tasks accordingly with different crews such as but not limited to pipe, insulation, scaffolding, mechanical, and instrumentation.
Involved in
• CSU 18 ABB 32 MW main motors
• CSU 18 Nuovo Pigeon 49k CFM Centrifugal 2 stage MR Compressors
• CSU 9 Lube Oil auxiliary systems
• CSU 9 1st stage & 2nd stage fin fan Cooler packages
• CSU 6 Low pressure amine Ruhrpumpen pumps
• CSU 6 High pressure amine Ruhrpumpen pumps
• CSU 6 Refrigeration Compressors
• CSU 3 Regeneration Sundyne compressors
• CSU 5 90 MW Frame 7E GE GT
• CSU 2 180 MW Siemens ST
• CSU 1 LM2500 GE GT
• Provide daily, on-site/in-site-field leadership, coordination and management of a multi-discipline team of mechanical commissioning leads and technicians.
• Maintained adequate inventory of spare parts to prevent critical downtime.
• Monitored safety compliance to maintain strict standards and protect team members from harm.
• Evaluated final results to determine quality levels and isolate root causes of any identified faults.
• Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.
• Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
• Protected workers and general public by enforcing strict safety practices.
• Reported on work progress to manager and incorporated feedback to maintain tight schedules.
• Delegated team assignments reviewed work and set schedules to maintain optimal coverage of all commissioning mechanical needs.
• Implemented quality programs, evaluated results and improved service policies to meet changing needs. (B & C sheets-ITR's )
• Monitored priorities and liaised between commissioning team and management, delegating tasks to complete on time.
• Contributed to development, implementation and execution of maintenance programs.
• Monitored systems to assure increase in power flow and integrated new system components, fixtures, and motors.
• Perform preventative maintenance and preservation on equipment as needed.
• Assembly of equipment and ensuring proper functionality.
• Replace and set proper clearances in bearings.
• Ensuring all valve lineups were proper for startup of equipment in a safe manner. With the use of P&ID’s and • Perform Alignments on all types of rotating equipment, set seals and set to spec as per equipment manufacturer. • Worked closely with LOTO and other crafts to ensure safe work during daily tasks.
• Diagnose problems and offer recommendations and solutions to the client.
• CSU / Cat 3512 backup generators
• CSU / 2 essential generators
• CSU / 3 GE LMS 2500 Turbines
• CSU / 2 Booster membrane pumps and motors
• CSU / 2 VRU
• CSU / 3 Pax Diesel pumps.
• CSU / 12 Lube oil pumps.