Summary
Overview
Work History
Education
Skills
Timeline
Generic

Willie Roy Hall

Louisville,MS

Summary

Power Plant maintenance and Construction Journeyman. Bringing valuable experience from large corporate construction sites. Offering over 20 years of experience. Highly motivated, dependable and efficient in high stress work environments. Experience in supervision and lead positions of my field expertise. Ability to complete tasks accurately despite interruptions and competing demands.

Results-driven Supervisor with experience steering and directing all aspects of operations, administration, budgeting and equipment maintenance. Practiced in orchestrating multiple projects with competing priorities involving process improvements, safety initiatives and quality control. Effective in collaborating with upper management to achieve organizational objectives.

Overview

17
17
years of professional experience

Work History

Welding Supervisor

Eastern Shipbuilding Group, Inc.
Panama City Beach, FL
10.2018 - Current
  • Monitored fitting, burning and welding processes to avoid overheating parts, warping, shrinking, distortion and expansion of materials.
  • Scraped off excess spatter and other materials using portable grinders and arc-cutting equipment.
  • Dismantled and assembled wellhead equipment.
  • Heated, formed and dressed metal parts with hand tools, torch and arc welding equipment.
  • Obtained desired configurations by clamping and tack-welding components.
  • Combined welding techniques, knowledge of metallurgy and engineering requirements to produce quality work.
  • Adjusted weld machines to correct settings prior to weld applications for precision and waste reduction.
  • Complied with company policies, objectives and communication goals.
  • Established and enforced clear goals to keep employees working collaboratively.
  • Promoted employee safety awareness based on understanding of regulatory mandates and organizational best practices.
  • Coordinated with internal departments to maximize operational efficiency across production and administrative areas.
  • Realigned workflows with changing business demands by evaluating processes and employee strengths.
  • Established and maintained operating schedules to provide effective coverage for key areas and achieve objectives.
  • Inspected incoming supplies to conform with materials specifications and quality standards.
  • Identified and corrected performance and personnel issues to reduce impact to business operations.

Welder/ Journeyman General Mechanic

RSI, Industrial, LLC
Panama City, FL
10.2018 - Current
  • Build and/or repair mechanical parts in all areas of mill
  • Install pipe and valves
  • Demo, hurricane repair work
  • Replace handrail, exhaust fans, structural supports and iron
  • Operate equipment extended boom forklift, man lift basket, scissor lift, welding machine etc
  • Prevented distortion of parts by monitoring fitting, burning and welding processes

Business Owner

Sand Dusters Cleaning Service, LLC
Panama City Beach, Florida
09.2019 - 01.2024

Boilermaker General Foreman

Gemma Power Systems Kings
Kings Mountain, NC
05.2013 - 05.2018

New construction build Power Plant 475 Megawatt natural gas combined cycle -HRSG

NTE Energy

  • Install pressure parts
  • Code welding
  • Erect boiler, steam drum, stack, and systems piping
  • Comply with code inspections, weld tracking, and verify drawing guidelines and procedures with client field engineers
  • Progress and production reports
  • Daily safety meetings, direct and oversee crew operations
  • Examined boilers, pressure vessels, tanks and vats to locate defects, including leaks, weak spots and defective sections
  • Inspected and assembled vessels and individual components, including tubes, fittings, valves, controls and auxiliary mechanisms to locate any defects
  • Located and marked reference points for columns or plates on boiler foundations by using blueprints and measuring instruments
  • Installed boilers used to heat water for generating electric power

Boilermaker General Foreman

Gemma
Montgomery, PA
07.2014 - 01.2016

New Build Two Natural Gas-Fueled Power Plants 829 Megawatt Combined Cycle Generating plant, Panda Energy, Panda Patriot Project

  • Installed systems piping: BOP, Turbine
  • Hydro and Pneumatic Testing
  • Air Testing
  • Instrumentation Piping
  • Code welding and record keeping
  • Read Piping ISOS and P&ID's
  • Work diligently with Engineers on systems layout
  • Daily crew job safety assignments
  • Warehouse and Laydown yard MTR's
  • Radio communications correspondence with all project departments
  • Systems Vendor coordination and identification of material and piping
  • Progress reports

Boilermaker Foreman

Gemma Power Systems
Woodville, TX
05.2013 - 07.2014

New Build Wood Burning Power Plant

Woodville Renewable Power Project, East Texas Electric Cooperative

  • Boiler Install
  • Erected water walls
  • Set steam drums
  • Piping
  • Code welding procedures
  • System Drawing and Prints ISOS, P&ID's
  • Crew assignment
  • Perform daily STA meetings

Boilermaker Foreman

PIC
GAINESVILLE, FL
05.2012 - 03.2013
  • Overseeing tube and water walls , Air heater and Duct work projects
  • Installed pressure parts
  • Daily safety meeting
  • Delegated task and work assignments to crews
  • Conducted Job Safety Assignment or Safety Work Assignments
  • Oversaw various Power plant projects from conceptualization to completion
  • Weld log
  • Read print and drawings to perform task
  • Worked exclusively with engineers on new build systems

General Foreman

FLUOR DANIELS
TATUM, TX
01.2010 - 05.2012
  • Overseeing boiler tube removal and reinstallation of water wall, reheat and superheat
  • Conducted daily crew Safe Task Assignments
  • Complied with all LOTO regulations and guidelines
  • Coordinate with plant control room operators
  • Set and Aligned pressure parts
  • Communications with crane operators for set downs of material and parts
  • Documented updates to management on project progress and forecast

Boilermaker General Foreman

Shaw
ST. Paul , VA
01.2010 - 04.2011
  • Overseeing new construction of HRA Units 1 & 2 3
  • Document control of prints and assigned drawings to code
  • Crew assignments and daily safety meeting
  • Coordinate with all departments on scheduled lifts and installs
  • Radio communications with equipment operators
  • Followed all safety procedures and protocols to remain compliant with both employer and client
  • Proactively identified and solved complex problems impacting operations management and direction
  • Inspected and assembled vessels and individual components, including tubes, fittings, valves, controls and auxiliary mechanisms to locate any defects

Boilermaker Foreman

Bechtel
Rockdale, TX
08.2008 - 07.2010
  • Overseeing build and install of Coal Burner
  • Code weld procedures and log entry
  • Daily STA meetings
  • Progress and projection reports
  • Laydown yard expedite and delivery request forms procedure
  • Commissioning assignment: hydro testing and procedures, Pneumatic testing
  • Radio communication: Crane setup and lifts

Education

High School Diploma -

Central Academy High School
Macon, MS
05.1983

Skills

  • Boilermaker
  • Pipping/Pipe fitter
  • Ironworker
  • Power and Hand Tools : Metabo, Grinder, Milling Motor, Hilti Drill, Hammer Drill, Threading Machine
  • Certified Rigger: ability to calculate weight and insure proper rigging
  • QC Inspector
  • Inspect Piping, Pipe supports, Valves, Iron, Tanks and all structural erected metal
  • Certified Welder: Stick, Tig and Mig welding specialize in all types of metal including 9cr, Carbon, Inconel, and Stainless
  • Automatic/Orbital welding
  • Equipment Operator: forktrucks and extended boom forktrucks, aerial lifts, scissor lift, sky climber, hydraulic cranes and carry deck cranes, tuggers and hoist, and welding machines
  • Cutting Torch/Gages: oxygen and acetylene, mapp gas, propylene
  • Plasma Cutting Machine
  • Arch Gouge
  • Ability to flag Cranes: radio voice commands and hand signals
  • Ability to read Blueprints and Drawing (Pipe ISOS and P&ID's)
  • LOTO: lock out tag out knowledge
  • OSHA safety training
  • Knowledge of Operations Safety procedures
  • Ability to fill out JSA and STA
  • Equipment inspection and daily completed equipment forms
  • Efficient and dependable: ability to work well with others, good communications skills, coordinate with all disciplines on job to work plan
  • Expedite Parts and material : ability to request and expedite from warehouse and laydown yards
  • Set and align equipment and conduct PM's (preventive maintenance)
  • English and Metric measuring knowledge
  • Face mask and breathing apparatus use and safety knowledge
  • Computer skills
  • Customer Service

Timeline

Business Owner

Sand Dusters Cleaning Service, LLC
09.2019 - 01.2024

Welding Supervisor

Eastern Shipbuilding Group, Inc.
10.2018 - Current

Welder/ Journeyman General Mechanic

RSI, Industrial, LLC
10.2018 - Current

Boilermaker General Foreman

Gemma
07.2014 - 01.2016

Boilermaker General Foreman

Gemma Power Systems Kings
05.2013 - 05.2018

Boilermaker Foreman

Gemma Power Systems
05.2013 - 07.2014

Boilermaker Foreman

PIC
05.2012 - 03.2013

General Foreman

FLUOR DANIELS
01.2010 - 05.2012

Boilermaker General Foreman

Shaw
01.2010 - 04.2011

Boilermaker Foreman

Bechtel
08.2008 - 07.2010

High School Diploma -

Central Academy High School
Willie Roy Hall