Summary
Overview
Work History
Education
Skills
Timeline
Generic

Winston Burton

Highlands

Summary

Accomplished Structural Welder with extensive experience at Pat Tank Inc, recognized for enhancing project quality through precise SMAW and FCAW techniques. Proven ability to interpret blueprints and collaborate effectively, ensuring safety compliance and reducing rework costs. Skilled in gouging,fabrication,fitting and welding techniques and committed to maintaining a clean, organized work environment.

Biggest projects include the Cameron and Gulf LNGs.

My years of experience and knowledge in the field will make me a valuable asset to any company or crew that I am a part of and as a team player I share my opinion and value that of my coworkers with the aim of reaching a mutual agreement on how to perform a task in order to get it done as efficiently and safely as possible.

Overview

2
2
years of professional experience

Work History

Structural Welder

Pat Tank Inc
04.2025 - Current
  • Prepared welding equipment to perform advanced welding work.
  • Demonstrated adaptability by successfully completing challenging projects that required diverse welding methods and materials expertise.
  • Extensive use of SMAW and FCAW welding processes to successfully and satisfactorily complete tasks.
  • Use of arc gouging for demolition and or effect repairs,or as part of a weld procedure.

eg. gouge weld seams on tank bottoms to remove old plates a

and replace with new ones.

back gouge vertical and horizantal welds to complete a

welded joint.

  • Kept work area clean and organized.

Structural Welder

CC Tank Solutions
11.2024 - 04.2025
  • Reduced project completion times through efficient planning and prioritization of welding tasks.
  • Enhanced structural integrity by executing precise welding techniques.
  • Consistently met production targets without sacrificing craftsmanship or safety standards by balancing speed with precision in every task.
  • Increased overall project quality with meticulous attention to detail in weld alignment and configuration.
  • Contributed to a reduction in rework costs by consistently delivering accurate welds that met or exceeded industry standards.
  • Use of ceramic backing strip to weld vertical joints with FCAW process.


  • Minimized warping using good fitting, burning, and welding techniques.


Structural Welder

Pat Tank Inc
08.2024 - 08.2024

Extensive use of the SMAW process to complete tasks.

Removal and replacement of old tank bottom and tub ring.

Fabrication and installation of new stainless steel steam coils. Contributed to successful project outcomes by collaborating effectively with team members and supervisors.

Use of mechanical equipment such as forklift,manlift and skid steer to complete tasks.

Structural Welder

Matrix Service Company
03.2024 - 08.2024
  • Performed task on LNG tank which includes the welding of vertical seams using the FCAW process
  • Overhead welds on the wind girder
  • Weld verts on shell extension with the aid of ceramic backing strip.
  • Assisted in the assembly of aluminium floating roof and roof hangers.
  • Backgouge and weld shell verts

Structural Welder

Pat Tank Inc
11.2023 - 03.2024
  • Construction of new tanks.
  • Tasks include interpret blueprint to lay out,fit and weld bottom
  • Erect,fit and weld shell plates.
  • Fit and weld internal piping, shell nozzles and ground lugs.
  • Fabricate and install shell and roof pipe supports.
  • Assisted in the fabrication,welding and installation of dome roof.
  • Extensive use of SMAW and FCAW welding procedures

Structural Welder/Pipe Welder

Consolidated Fabrications & Constructions Inc
07.2023 - 11.2023
  • Use of arc gouging process to remove bottom plates.
  • Remove and replace old sand
  • Remove and replace bottom plates,fit and weld.
  • Assisted in the installation of center pole,rafters and rafter clips.
  • Fit and weld roof plates.
  • Ensured safety compliance by strictly adhering to OSHA regulations during all welding activities.
  • Utilized advanced blueprint reading skills for accurately interpreting project requirements prior to commencing work.
  • Enhanced safety on job site, rigorously adhering to all OSHA standards and company safety protocols during welding operations.

Structural Welder

TARSCO
03.2023 - 07.2023
  • Use of SMAW and FCAW processes to complete corner welds,weld on bottom as well as wind girder and wind girder supports.
  • Use FCAW weld process to weld vertical seams

Education

High School Diploma -

Manchester High School
Manchester, Jamaica

Associate of Science - Process Technology

Lee College
Baytown, TX
05-2027

Skills

  • Personal protective equipment
  • Vertical welding
  • Horizontal welding
  • Grinding techniques
  • AGW Certified
  • Forklift,Skid Steer,Manlift Certified
  • Gouging techniques
  • Blueprint Reading
  • Competent fitter

Timeline

Structural Welder

Pat Tank Inc
04.2025 - Current

Structural Welder

CC Tank Solutions
11.2024 - 04.2025

Structural Welder

Pat Tank Inc
08.2024 - 08.2024

Structural Welder

Matrix Service Company
03.2024 - 08.2024

Structural Welder

Pat Tank Inc
11.2023 - 03.2024

Structural Welder/Pipe Welder

Consolidated Fabrications & Constructions Inc
07.2023 - 11.2023

Structural Welder

TARSCO
03.2023 - 07.2023

High School Diploma -

Manchester High School

Associate of Science - Process Technology

Lee College
Winston Burton