Summary
Overview
Work History
Education
Skills
Certification
Timeline
Projects
Projects
Contacts
Generic

Xavier Ryan Ybarra

LA VERNE,CA

Summary

Responsible Construction Superintendent with 16 years of comprehensive experience leading contractors and subcontractors. Outstanding blueprint and design interpretation and comprehension abilities with excellent communication, budgeting and project management talents. Extensive knowledge of all construction sub-trades, construction materials and supplies. Knowledgeable in Microsoft, Excel and ProCore. Eager and enthusiastic to expand my knowledge in ground up and tilt up projects. Evaluate situations and random decisions on certain issues without immediate supervision

Overview

27
27
years of professional experience
1
1
Certificate

Work History

Carpenter / Retail Construction Superintendent

(Eleven Western Builders Inc.)
12.2002 - Current
  • Scheduled subcontractors, consultants and vendors to coordinate completion of jobs and tasks.
  • Supervised field crews to maximize quality and work efficiency.
  • Coordinated required inspections with local jurisdictions to identify and quickly resolve any code concerns.
  • Identified and reviewed proposed change order requests.
  • Drive project objectives on day-to-day operational level by working closely with clients, decision-makers and vendors.
  • Complied with safety protocols in plan coordination, eliminating potential risks.
  • Aided with obtaining permits or approval of revisions.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Delivered reports to construction manager to detail project updates and likely completion dates, noting delays and causes.
  • Delegated assignments based on plans, project needs, and knowledge of individual team members.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Stayed up to date on OSHA and local safety guidelines for construction work, and correctly reported incidents to supervisors.
  • Enhanced company development initiatives by solving complex issues and suggesting corrective action.
  • Maintained tight construction standards while instructing subcontractors on quality control.
  • Maintained safety standards by completing OSAH 10 & 30 hour programs and adhering to established guidelines.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Checked equipment to determine if maintenance was required.
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Work closely with Management for utilities, permits, plan checks and Certificates of Occupancy to obtain all necessary approvals


Carpenter / Case Setter / Cooler, Freezer Installs

(John M Frank Construction)
11.2001 - 12.2002
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Read and interpreted blueprints to follow specifications of projects.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Assembled and installed furniture and cabinetry.

Carpenter

(Noble Development)
07.2000 - 10.2001
  • Measured materials to determine sizes and quantity required for construction project.
  • Collaborated with other construction workers to coordinate projects and streamline process.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Assembled and installed furniture and cabinetry.

Cabinet Builder

(Savant Construction)
02.1997 - 06.2000
  • Assembled cabinet components using glue and mechanical fasteners to create strong, durable products.
  • Measured and cut materials to specified dimensions to achieve precise fit.
  • Installed hardware such as drawer pulls, hinges, and handles.
  • Inspected completed cabinets for quality assurance.
  • Maintained safe and organized workspace to minimize risk of injury.
  • Constructed custom cabinets for residential and commercial spaces using varied hand and power tools.
  • Repaired cabinets and cabinet parts.
  • Cut plywood, MDF and solid wood to size.
  • Created detailed moldings and trim for cabinetry and furniture.
  • Developed and retained excellent tool and machinery skill to produce consistent, top-quality work.
  • Maintained compliance with all safety and code regulations to protect crew members, clients and structures from harm.

Education

GED -

Bonita Adult School
San Dimas, CA
06.1988

Skills

  • Subcontractor Coordination
  • Subcontractor Supervision
  • Project Deadlines
  • Self-Motivated
  • Safety Oversight
  • Quality Assurance and Control
  • Project Management
  • Commercial Projects
  • Quality Control
  • Willingness to Learn
  • Shift Coverage
  • ADA Compliance upgrades, including exterior site work
  • Predictive and Preventive Maintenance
  • Vendor Coordination
  • Blueprint Reading
  • Construction Protocols and Standards
  • Teamwork committed
  • Effective Communication
  • Punch Lists
  • Construction and Remodeling
  • Site Inspection
  • Loyalty
  • Integrity

Certification

  • OSAH 30 Training
  • CPR & First Aid Training

Timeline

Carpenter / Retail Construction Superintendent

(Eleven Western Builders Inc.)
12.2002 - Current

Carpenter / Case Setter / Cooler, Freezer Installs

(John M Frank Construction)
11.2001 - 12.2002

Carpenter

(Noble Development)
07.2000 - 10.2001

Cabinet Builder

(Savant Construction)
02.1997 - 06.2000

GED -

Bonita Adult School

Projects

CVS, Albertsons, Vons, Pavilions, Safeway, Osh Hardware, ALDI, Rite Aid, Gelsons Market, Longs Drugstore, Cold Stone Creamery, McDonald's and Jack in the Box.

Projects

CVS, Albertsons, Vons, Pavilions, Safeway, Osh Hardware, Sprouts, ALDI, Rite Aid, Gelson's, Longs Drugstore, Cold Stone Creamery, McDonald's, Jack in the Box. 

Contacts

Chad Douglas

Project Manager (EWBI)

(760) 580-0988


Karlo Munoz

Project Manager (EWBI)

(760) 533-1696


Hugo Mejia

Project Manager (EWBI)

(760) 519-0757


Alex Gonzalez 

General Superintendent (EWBI)

(760) 497-1544



Xavier Ryan Ybarra