Talented professional considered knowledgeable leader and dedicated problem solver. Bring 10 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs, and improvements. A hardworking and passionate job seeker with strong organizational skills eager to secure an entry-level project manager position. Ready to help the team achieve company goals. To seek and maintain a full-time position that offers professional challenges utilizing critical thinking, excellent time management, and problem-solving skills, interpersonal skills.
The Governor (Multifamily), Phoenix, AZ 85006 12/2022-1/2024
• Did take-offs for HVAC equipment and materials, negotiated with vendors and purchased the orders, drew coordination drawings, communicated with the GC and team to solve problems, and worked on and sent out RFIs and COs.
Tucson Landing (Multifamily), Tucson, AZ 85714 11/2022-1/2024
• Did take-offs for plumbing fixtures, negotiated the prices with the vendor for optimal cost savings, released the purchase orders, and drew coordination drawings to help the foreman locate pipes and plumbing fixtures in the correct locations. Coordinated with the team, visited the job site to solve problems, worked on COs, and sent out RFIs.
Milhaus @ Apache & River (Multifamily), AZ Tempe, AZ 85281 05/2022-1/2024
• Did take-offs for HVAC equipment and materials, purchased the orders, communicated with the GC and team to solve problems, and collaborated with architects and engineers to solve complex space installations. Sent out COs and RFIs. Did coordination drawings for the mechanical closet.
Nature-Med (Industry remodeling), Tucson, AZ 85756 01/2022-4/2023
• Visited job site and coordinated with structure sub to set equipment locations in the remodeled building, drew coordination drawings for field installation, released the purchase orders, and tracked the delivery. Enhanced client satisfaction by providing regular progress updates and addressing concerns promptly.
Album Marana (Multifamily), Tucson, AZ 85743 08/2021-11/30/2023
• Did take-offs of the plumbing fixtures, optimized the buyout price, drew coordination drawings, coordinated with the team, visited the job site to solve problems, communicated with the GC, worked on COs, and sent out RFIs.
JOMAX (Multifamily), Phoenix, AZ 85085 05//2021-12/20/2023
• Coordinated with the team, solved technical issues, and sent out RFIs. Communicated with the GC and worked on COs. Worked with vendors for buyouts and scheduled the equipment and materials delivery.
The Baffert at Five Points (Multifamily), Tucson, AZ 85701 04//2021-12/2023
• Coordinated cross-functional teams and resolved conflicts, drew coordination drawings for field installation, attended on-site weekly meetings, and maintained efficient communications with the GC. Visited the job site regularly, worked on and sent out COs and RFIs.
Novel Val Vista (Multifamily), Gilbert, AZ 85295 03//2021-1/2024
• Did take-offs for the HVAC equipment and materials. Negotiated contracts with vendors and subcontractors for optimal cost savings on materials and services. Communicated with the GC and enhanced client satisfaction by addressing concerns promptly. Solved the coordination issues with the engineer and sent out RFIs and COs.
Manor Scottsdale (Multifamily), Scottsdale, AZ 85253 11//2020-1/2024• Did take-offs for the mechanical installation preparation, traded with the suppliers, found potential space conflict issues in the project, drafted the drawings to solve the problems, drew coordination drawings, and worked on and sent out RFIs and COs.
LCG Kierland (Multifamily), Scottsdale, AZ 85254 10//2020-1/2024• Did take-offs for the mechanical installation preparation, negotiated the equipment prices with the vendors and the general contractor to control the budget, maintained timely communication with the GC and foreman to solve problems, and caught up with the schedule. Drew coordination drawings and worked on COs and RFIs.
Pinal County Attorney’s Office (Office), Florence, AZ 85132 08//2020-12/2021• Used Revit to check the 3D models and found conflict issues in the space. Rerouted the pipes and relocated the equipment to make the system work. Drew coordination drawings for both HAVC and plumbing installation. Conducted risk assessments to identify potential issues before they developed into major problems, keeping projects on track for success.
FLASH TV (Multifamily), Tucson, AZ 85719 08//2020-04/2021
• Caught up with the outstanding work from the previous PM. Traded with the suppliers, visited the job site regularly to solve problems, and tracked the process.
Project Manager at East China Architecture Design & Research Institute Co. Ltd. (ECADI)Zhong Nan Center (High-rise building, mixed-use) cooperated with Gensler (US). Suzhou, China 08/2016 - 08/2017
• Streamlined the design process, collaborated with consultants and the design team: architects, structural engineers, and mechanical engineers, enhanced the communications with the clients and officials from local governments. Increased customer satisfaction ratings by resolving all issues professionally.
• The project is a mixed-use tower, including a basement, retail, office, apartment, hotel, and sightseeing. The size is 499 thousand square meters, 598 meters high, and is a core-tube structure with giant columns.
Assistant of PM at East China Architecture Design & Research Institute Co. Ltd. (ECADI)Tianjin Chow Tai Fook Financial Center (High-rise building, mixed-use) cooperated with SOM (US). Tianjin, China
06/2011 - 10/2017
• Participated in regular meetings, helped PM contact consultants, and solved design problems. Collaborated with clients, consultants, engineers, and designers to develop innovative solutions for complex design problems.
• The project is a mixed-use tower, including a basement, commercial podium, office, service apartment, and hotel. The size is 390 thousand square meters, 530 meters high, and is a structural steel (steel pipe) concrete frame with reinforced concrete shear-wall structure.
Architect at East China Architecture Design & Research Institute Co. Ltd. (ECADI) Project Architect Hongdou East Fortune Plaza (High-rise buildings) cooperated with C.Y.LEE & Partners (Taiwan). Wuxi, China 06/2013 - 07/2017• Streamlined and planned the whole design process, communicated with clients, and got feedback on the customers’ needs. Held design progress and regular status meetings with the project team. Supervised the design work and ensured it met the codes and local principles of design requests.
• The project includes an office tower and an apartment with a commercial podium. The size is 160 thousand square meters, 169 meters high, and is a frame core-tube structure.
Main Designer Hefei Evergrande Center C Block (High-rise building, mixed-use) cooperated with Gensler (US). Hefei, China 02/2016 - 08/2017• Designed the hotel section, including ballrooms, restaurants, and guest rooms.
• The project is a mixed-use tower, including a basement, commercial, office, apartment, and hotel. The size is 439 thousand square meters, 518 meters high, and is a mega-frame core-tube structure with outriggers.
Beijing CBD Core Zone Z12 Block (High-rise building mixed-use) cooperated with PCPA (US). Beijing, China 02/2015 - 06/2017• Designed the office space and the hotel section.
• The project is an office tower with restaurants. The size is 140 thousand square meters, 216 meters high, and is a steel support structure with RCC and steel beam.
Fanhai International Apartment (High-rise residential community), Shanghai, China 03/2009 - 08/2017• Designed the basement, community club, and residential layouts.
• The project is a fancy residential community. The size is 202 thousand square meters, 76.8 meters high with shear wall s structure.