Summary
Overview
Work History
Education
Skills
Timeline
Generic

Yosvany Sanchez

Tooele

Summary

Dynamic Assistant Superintendent with proven expertise in time management and team oversight, adept at engaging diverse personalities to foster collaboration. Demonstrates a strong work ethic and safety-conscious approach, excelling in manual labor and equipment operation across various environments. Committed to contributing positively to a dynamic organization while leveraging exceptional interpersonal skills. Eager to embrace new challenges that drive personal and professional growth.

Overview

8
8
years of professional experience

Work History

Assistant Superintendent

Morin Construction
Ogden
01.2021 - Current
  • Assisted in overseeing a large-scale project for Morin titled Jackson Station, successfully completed the Jackson Station project ahead of schedule
  • Enhanced efficiency in resource distribution for prompt and cost-effective completion.
  • Inspected sites before and after construction projects.
  • Verified work compliance with applicable regulations, codes and specifications.
  • Monitored project progress to enforce adherence to deadlines and quality standards.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Prepared and planned worksites to help jobs run smoothly.
  • Created work crew schedules and delegated assignments.
  • Assisted in the development of construction schedules and budgets.

Lead Carpenter

CASTLE ROCK CONSTRUCTION
Coalville
03.2017 - 01.2022
  • Worked independently on projects and tasks within carpentry team.
  • Removed damaged or defective parts or sections of structures and repaired or replaced using hand tools.
  • Measured, cut, and installed staircase spindles.
  • Implemented new processes or methods for more efficient execution of carpentry operations.
  • Prioritized work, keeping carpentry jobs on task and within budget.
  • Mapped out floor plan through snapping main grid lines.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Ensured that all framing was done accurately and securely attached to the foundation structure.
  • Constructed walls, floors, roofs, door frames and other wooden structures according to blueprints or drawings.
  • Measured and marked cutting lines on wood and raw materials.
  • Utilized ladders or scaffolding when working at heights.

Warehouse Forklift Operator

Mrs. Fields
Salt Lake City
11.2016 - 03.2017
  • Completed daily logs for recordkeeping.
  • Reported any issues or discrepancies regarding product quantity or quality to supervisors immediately.
  • Moved levers or controls of lifting devices to load, unload or stack material.
  • Inspected product load for accuracy to foster timely and complete delivery.
  • Picked up warehouse debris and deposited waste into appropriate piles and stacked baled trash.
  • Performed daily pre-shift inspections on forklifts and other equipment.
  • Prepared finished stock for shipment by identifying, pulling and packing product.
  • Operated forklifts to transport materials between loading, processing, and storage areas.
  • Organized warehouse and arranged items following procedures and safety rules.
  • Performed daily equipment checks to verify proper operation and minimize downtime.
  • Unloaded incoming supplies and placed them into designated storage areas.
  • Assisted with shipping and receiving activities as needed.
  • Managed stock rotation ensuring that older stock is used first.
  • Loaded and unloaded pallets of product onto trucks using a forklift.
  • Unloaded incoming items from trucks and rail cars and transported materials to staging area.

Education

High School Diploma -

Valley High School
South Jordan, UT
05-2016

Skills

  • Construction scheduling
  • Site inspection
  • Team leadership
  • Quality control
  • Safety protocols
  • Blueprint interpretation
  • Resource allocation
  • Workforce planning
  • Performance evaluations
  • Construction supervision
  • Multitasking
  • Problem-solving abilities
  • Field coordination
  • Job planning
  • Excellent communication
  • Carpentry skills
  • Project scheduling
  • Blueprint updating and distribution
  • Teamwork
  • Site delay investigation
  • Management
  • Change order management

Timeline

Assistant Superintendent

Morin Construction
01.2021 - Current

Lead Carpenter

CASTLE ROCK CONSTRUCTION
03.2017 - 01.2022

Warehouse Forklift Operator

Mrs. Fields
11.2016 - 03.2017

High School Diploma -

Valley High School
Yosvany Sanchez