Summary
Overview
Work History
Education
Skills
Timeline
Generic

Yvette Tawengwa

Katy,TX

Summary

PROJECT CONTROLS Professional in Construction, Electrical ,Instrumentation, Fiber Optics Projects. A problem solver who strives at getting exposure on multiple projects, and excel in the collaborative environment. Skilled with over 6+ years experience in multiple scheduling & project controls platforms such as Primavera P.6 and Microsoft Office .

Overview

9
9
years of professional experience

Work History

Felid Engineer

MMR Constructor: Project LNG venture Liquefied gas
Plaquemine, LA
01.2024 - Current
  • Generated reports summarizing project's status.
  • Participated in team meetings to discuss project progress updates.
  • Reviewed blueprints or technical documents pertaining to product design, updated current Revisions process prior to implementation.
  • Monitored project progress against established timelines in order to ensure timely completion. Using the company JA (Job Analysis Tracker),
  • Coordinated with suppliers, contractors, and clients to ensure project success.
  • Developed and maintained project documentation, including design notes, calculations, reports, and RFIs.
  • Assisted in the preparation of payroll reports on a weekly basis.
  • Verified accuracy of timesheets before submitting them for processing.

Felid Engineer

MMR Constructors( Tesla Gigafactory Austin Tx)
Austin, TX
07.2023 - Current
  • Developed project plans, budgets and timelines to ensure successful completion of projects.
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Reviewed blueprints, drawings and specifications for accuracy and completeness prior to construction commencement.
  • Conducted regular inspections at job sites for multiple shops such as Tesla Casting airflow,Cathode, Ga1 &2,Cyber data drops, in order to monitor safety protocols being followed by contractors.
  • Developed project objectives by reviewing project proposals and plans and conferring with management.
  • Identified cost saving measures that could be implemented without compromising safety or quality standards during the project life cycle.
  • Attended meetings with stakeholders including clients, engineers, subcontractors and other parties involved in the project.

Project Controls/Project Air Liquid Arizona)

MMR Constructors
Long Beach, CA
11.2022 - Current
  • Tracking the daily progress of the project using P6 and JA Job analysis.
  • Developed EPC schedules using P6 software, Controlled and Managed the schedule. Experience with CMS and Other Billing and time keeping software's.
  • Baselined existing projects to schedule and cost parameters and metrics
  • Integrated Cost & Schedule controls with EVM reporting and KPIs
  • Document and drawing controls
  • Defined equipment and parts from external suppliers.
  • Analyzed project requirements and performed technical calculations supporting design solutions.
  • Conducted analyses addressing failure, reliability or yield improvement.
  • Created accurate project specifications, documenting in technical manuals
  • Created customer documentation such as diagrams, electrical drawings and manuals.
  • Oversaw project workflow and supported internal and external resources.
  • Analyzed design or requirement information for equipment or systems.

Project Planner/Utility Coordinator

Koneve E
Katy, TX
03.2021 - 09.2022
  • As a contractor with Koneve, providing direct support utilizing Mapping and Primavera scheduling tools for a major gas utility in Florida& Georgia, The Initiative for this project was Strengthen Florida's Energy Grid "Smart grid optimization.
  • Maintained schedule Scops projects via TMT & Maximo software with multiple business units'
  • Responsible for Identifying Undergrounding Line (Overhead/Underground)Targets that will be scoped using Myworld Mapping system For future Hardening Purposes,
  • Created Scopes and Detailed maps for Laterals and Feeders also Created work orders for Maintain work Such as Pole Replacement, Transformer Replacement, Riser retrofits,Switchgears,Transformer Replacement and Fuse Replacement.
  • Responsible for overall project communication provided to that Energy plant .

Project Coordinator Intern

Canon, Inc
Atlanta, GA
08.2015 - 10.2020
  • For Canon USA, provided Creation and maintenance of the various project control systems utilized by Microsoft Office
  • Monitored cost, forecast, and schedules of various projects for Project Managers
  • Managed the development and submission of the WBS, yearly budget builds, performance indicators, and monthly accruals.
  • Wrote procedures, reports and technical documents in easy-to-understand terminology.
  • Assisted with event planning, support and execution of virtual and in-person engagements.
  • Handled incoming and outgoing supplies and packages and routed to appropriate personnel.

Education

Project Management Professional Certification - Project Management

PMI
Houston, TX
05.2021

Bachelor of Science - Business Administration

Thompson River University
12.2004

Associate’s Degree - Pharmacology

Medix School
Ontario, CA

Skills

  • Project Controls
  • Project Management
  • Primavera P6
  • Earned Value Management
  • Forecasting
  • Microsoft Project
  • Microsoft Office Suite
  • Budget Management
  • Attention to Detail
  • Quality Assurance
  • Team Building
  • Narrative Reporting
  • Resource/Cost Loading
  • SharePoint

Timeline

Felid Engineer

MMR Constructor: Project LNG venture Liquefied gas
01.2024 - Current

Felid Engineer

MMR Constructors( Tesla Gigafactory Austin Tx)
07.2023 - Current

Project Controls/Project Air Liquid Arizona)

MMR Constructors
11.2022 - Current

Project Planner/Utility Coordinator

Koneve E
03.2021 - 09.2022

Project Coordinator Intern

Canon, Inc
08.2015 - 10.2020

Project Management Professional Certification - Project Management

PMI

Bachelor of Science - Business Administration

Thompson River University

Associate’s Degree - Pharmacology

Medix School
Yvette Tawengwa