Summary
Overview
Work History
Skills
Timeline
Generic

Zachary Lewis

Olive Branch,MS

Summary

Dedicated ironworker/millwright with 5+ years of experience in the fabrication and installation of structural steel. Skilled in blueprint reading and safety compliance, consistently delivering high quality results in a fast paced environment. Committed to problem

Overview

2
2
years of professional experience

Work History

Millwright

G.A WEST
06.2023 - 09.2023
  • Connecting/bolting up supports for heavy industrial equipment as well as setting/installing the equipment for (Trade Mark Metals) a metal recycling plant in Bushnell Florida
  • Pre-fabricated overpass to cover the equipment including rigging and plumbing columns
  • Connecting/bolting bar joist, I beams, angle bracing, and C purlins

Millwright

G.A WEST
03.2023 - 06.2023
  • Installation of a ROSLER shot blasting machine for a nucor steel mill in Brandon Berg Kentucky
  • Connecting/bolting up specific parts of the machine, rigging and setting roller conveyors in the correct position
  • Installing aluminum spiral duct work as well as fabricating/welding supports for the duct work

Journeyman Ironworker

LPR Construction
12.2022 - 01.2023
  • Bolting up setting bar joist, rigging, grinding, installing safety lines and safety post
  • Laid Q decking in Bentonville Arkansas for a Walmart home office

Journeyman Ironworker

Ranger Steel
09.2022 - 12.2022
  • Connector/bolt up on two pre-fabricated buildings, did the sheet metal work around them including gutters, window trim, down spouts, rake trim, peak boxes and more in Cincinnati Ohio and parkersburg West Virgina

Ironworker Millwright

Rad Fabrication
08.2022 - 10.2022
  • Connecting/bolting up set bar joist
  • Laid Q and B decking, rigging and cutting with grinder and acetylene torch in Indianapolis Indiana for a loft/hotel

Journeyman Ironworker

Raw Resources
06.2022 - 08.2022
  • Connecting/bolting up setting columns, beams, X bracing, and Q decking
  • Rigging for a rock refinery plant in Morgantown West Virginia

Ironworker Millwright

ITS Industrial
03.2022 - 06.2022
  • Removal of heavy industrial equipment/disassembly of pips/antifreeze, water and more in Massachusetts

Ironworker Millwright

RUBB Building Systems
10.2021 - 02.2022
  • Sheeted Southwest airline hanger doing PVC mechanical sheet tensioning
  • Put together ten Rubb BVR structure type buildings as a bolt up connector
  • Sheeted them in other places such as Atlanta Georgia and Pascagoula Mississippi

Skills

  • Equipment rigging
  • Hanger setting
  • Heavy equipment assembly
  • Structural integrity
  • Pipe installation
  • Steel framing

Timeline

Millwright

G.A WEST
06.2023 - 09.2023

Millwright

G.A WEST
03.2023 - 06.2023

Journeyman Ironworker

LPR Construction
12.2022 - 01.2023

Journeyman Ironworker

Ranger Steel
09.2022 - 12.2022

Ironworker Millwright

Rad Fabrication
08.2022 - 10.2022

Journeyman Ironworker

Raw Resources
06.2022 - 08.2022

Ironworker Millwright

ITS Industrial
03.2022 - 06.2022

Ironworker Millwright

RUBB Building Systems
10.2021 - 02.2022