Proficient Project Engineer with 5 years of experience driving over 300 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget and according to specifications. Reliable Project Engineer successful at liaising between divisions to ensure that staffing needs are met.
Experienced project engineer on Utility system projects including Grinding water system, 15kv High Voltages power system, 4160v medium voltage power system, Mechanical compress air system, clean room with ISO 7&8 level, RO water system and Grinding water system.
· Fuyao Glass expansion coating factory High Voltages power system, design and summarized 15kv High voltage substation. Auditing PE drawings and project managing the construction team to finish the 15kv High voltages substation. Fuyao Glass expansion coating factory 480V low Voltages power system: Collecting production line and Utility equipment power supply information. Designing, allocating, and summarizing all the equipment cabinet load information. Auditing PE drawings and feedback to responsible engineers to modify before issue for bid and construction. Planning and managing the construction team to finish the power distribution to the new production line individual cabinets.
· Fuyao Glass expansion coating factory compress air system: Design the capacity of the air system and make a preliminary sketch of the system. Auditing PE drawings and feedback to responsible engineers to modify before issue for bid and construction. Planning and managing the construction team to finish the air compressor system build up, compress air pipe system build up, and keep track of the construction schedule.
· Fuyao Glass expansion coating factory ISO7&8 clean room construction: Collect all the PVB rooms and print rooms cleanliness and air change rate information. Assisting professional team on cooling system design, chiller sizing picks up, Air handing unit choosing, structure design and electrical supply design. Auditing PE drawings and feedback to responsible engineers to modify before issue for bid and construction. Planning and managing the construction team to accomplish all the clean rooms, cooling water system, air duct work system. Support the professional team on testing system to meet the ISO standard.
· Fuyao Glass expansion coating factory RO/EDI and Grinding water system: Design and calculate RO/EDI and Grind water usage capacity for all the Grinders, pretreatment washing machines, coating washing machines and bending washing machines. Make preliminary sketch of the RO piping system and audit all the scope of work from RO water system supplier. Auditing PE drawings and feedback to responsible engineers to modify before issue for bid and construction. Planning and managing the construction team to accomplish all piping systems and RO/EDI water stations. Support the professional team on testing and debugging the system to meet the Fuyao standard.
· Fuyao Glass expansion coating factory cooling system: Design and calculate cooling capacity for autoclaves and furnace cooling. Assisting professional team to size the cooling tower size and chiller system. Make preliminary sketch of the cooling system and transfer it to the designing contractor. Auditing PE drawings and feedback to responsible engineers to modify before issue for bid and construction. Planning and managing the construction team to accomplish all piping system and cooling system build up.
· Tesla new production, RO system, compressed air system and 480v Power supply system build up.
· Grinding water system updating project: The performance of the Grinding water station has been greatly improved, and the quality of Grinding water has been significantly improved, with 30NTU reduced to 3-6NTU. The Grinding water system can generate explicit and implicit benefits of up to $360K per year.
· Mechanical room atlas air compressor project: The newly added Atlas air compressor system greatly reduces the number of airs outages.
· Tempering Lamination assembly air filter installation project: Add filtration system for production line which greatly Construction of new 480V substation Y for Fuyao new G45 production line power supply system.
· Update the Utility Chiller water system for Fuyao print room and Lamination room.
· Semi-tempering#0 power supply system: project manage and design for power system of new Semi-tempering production line.