Highly skilled and detail-oriented State Licensed / NCCER+ Electrician with 23 years of experience in the field. Committed to precise and creative installations, specializing in Instrumentation and Electrical work. Demonstrated expertise in adhering to client specifications and installation details, while referencing industry standards such as NEMA VE2 and NEC. Seeking a position as an I/E Inspector in a reputable company to utilize extensive training and technical knowledge for exceptional results.
Work History
I&E Inspector
4 Years 4 Months
Energy Inspection Services | 06.2022 - Current
Review Drawings One Lines, Wiring Schematics, Electrical Lay Outs, H- Frame Incoming Pole Services
Oversee and Assist Contractor with questions and RFI's to be sent to Engineering
Oversee Contractor installations per Client Details and Specifications (Reference NEC)
Review ITR's with Contractor and sign offs
Work with Engineer on Location Installs and recommendations
Attend FAT's for meter skids and Electrical Buildings
Review Job Plans with Contractor for steps and procedures
Oversee Hi Voltage group with testing of switchgear, breakers, transformer, hi and low voltage, Bus Duct Installations, UPS Systems
Verify Stress cones installed properly and tested
Witness Megg of Power Cables
Verify Point to Point with Contractor
Verify Equipment Switchgear Installation Assembly
Oversee Substation Equipment Installation and Manual Operation Bypass alignment
Attend Meetings Update PM on Contractor Installations/Concerns
Oversee Fiber Optic Installation Connector, IT Racks
Walk P&ID with Mechanical QC to Release Lines for Heat Trace Installation
Coordinate with Cathodic Group for Anode Installations
Coordinate with Clients Testing Contractors: Such as UPS start up, Hy Pot testing, MV, HV, Testing Interconnects verification
Coordinate and assist request for measurement group
I&E Inspector
1 Year 6 Months
J Tam Engineering | 09.2020 - 03.2022
Drawing review One Lines, Power Panel Schedules, P&ID's
Oversee Contractor Installations, Grounding, Cable Tray's, Building Installations, Duct Banks
UPS Installations & Commission
Generator/ATS Installations and Commission
Area lighting and VSU/DSU Installation and Commissioning
Verify Point to Point with Contractor
Dock loading arm Commissioning
Review all ITP's and sign offs
Attend meetings for vendors and scheduling
Witness Motor Run ins
I&E Inspector
2 Years 3 Months
Kestrel Engineering, Inc. | 06.2018 - 09.2020
Execute the specific inspections on materials, equipment, and construction/installation activities on site
Commission and sell of Motors, transformer, transmitters, flow meters, lighting, grounding, Analyzers, PEC buildings, MCC 's, Switchgears, and UPS system
Inspect all above and underground installations for sell of witness Arc Flash Plenum F.A.T' s and motor run- ins, High Pot
Document and report contractor's installations, drawings, sign off folders
Test results, loop checks, motors, high and low switch gear check out, VFD 's, Area Lighting, review Data Sheets for projects
Review Drawings, Research, Report for client's assurance installations
Walk Thru with Project Management, clients, contractors, vendors
Electrical Foreman
1 Year 2 Months
PLC Construction | 03.2017 - 05.2018
Company Overview: (West Texas)
Attend Morning and ongoing weekly meetings
Execute work deadlines
Oversee foreman and employee's installations, wiring and cable pulls
Prepare material take off requests
Install Heat Trace Panels, set points in heat trace Controllers and Transformers
Pretest heat trace panels
Instrument documentation and Spec sheets as well as PSS start up
Review Drawings and send RFI to Engineer, build sign off folders and permit request
Project walk thru with QC, plan and schedule sell offs
Electrical Foreman
4 Months
Strike, LLC | 10.2017 - 02.2018
Company Overview: Baytown, TX
Oversee installations on conduit, grounding, cable pulls, duct banks, setting of transformers15kv ,4160kv & 480v
Fence grounding, cable testing, troubleshooting meg wires, install light poles and ESD stands and mounting J boxes and lighting arrester system
Assist vendors with wiring configuration
Goal is to turn over a functional facility
Electrical Foreman
1 Year 4 Months
Triad Electric & Controls | 07.2016 - 11.2017
Company Overview: Baytown, TX
In charge of Substation and Transformer yard, oversee Motor, Transformer, instrument termination as well as RIE & RIOM
Install aviation lights with controllers and assist with programming, install lighting, convenience outlets, welding outlets
Assist with trouble shooting termination, Project walk downs with client and third party
Plan for Motor Solo runs and PSSR inspection and checkout
Instrument & Electrical GF
4 Years 8 Months
Bilfinger/ Westcon | 11.2011 - 07.2016
Company Overview: Deer Park, TX
Attend Morning and ongoing weekly meetings
Execute work deadlines
Prepare material take off requests
Install Heat Trace Panels/Controllers
Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
Review Drawings, Send RFI to Engineer, build sign off folders and permit request