Benito Juarez

Baytown,TX

Summary

Highly skilled and detail-oriented State Licensed / NCCER+ Electrician with 23 years of experience in the field. Committed to precise and creative installations, specializing in Instrumentation and Electrical work. Demonstrated expertise in adhering to client specifications and installation details, while referencing industry standards such as NEMA VE2 and NEC. Seeking a position as an I/E Inspector in a reputable company to utilize extensive training and technical knowledge for exceptional results.

Overview

15
15
years of professional experience
1
1
Certification

Work History

I&E Inspector

Energy Inspection Services
06.2022 - Current
  • Review Drawings One Lines, Wiring Schematics, Electrical Lay Outs, H- Frame Incoming Pole Services
  • Oversee and Assist Contractor with questions and RFI's to be sent to Engineering
  • Oversee Contractor installations per Client Details and Specifications (Reference NEC)
  • Review ITR's with Contractor and sign offs
  • Work with Engineer on Location Installs and recommendations
  • Attend FAT's for meter skids and Electrical Buildings
  • Review Job Plans with Contractor for steps and procedures
  • Oversee Hi Voltage group with testing of switchgear, breakers, transformer, hi and low voltage, Bus Duct Installations, UPS Systems
  • Verify Stress cones installed properly and tested
  • Witness Megg of Power Cables
  • Verify Point to Point with Contractor
  • Verify Equipment Switchgear Installation Assembly
  • Oversee Substation Equipment Installation and Manual Operation Bypass alignment
  • Attend Meetings Update PM on Contractor Installations/Concerns
  • Oversee Fiber Optic Installation Connector, IT Racks
  • Walk P&ID with Mechanical QC to Release Lines for Heat Trace Installation
  • Coordinate with Cathodic Group for Anode Installations
  • Coordinate with Clients Testing Contractors: Such as UPS start up, Hy Pot testing, MV, HV, Testing Interconnects verification
  • Coordinate and assist request for measurement group

I&E Inspector

J Tam Engineering
09.2020 - 03.2022
  • Drawing review One Lines, Power Panel Schedules, P&ID's
  • Oversee Contractor Installations, Grounding, Cable Tray's, Building Installations, Duct Banks
  • UPS Installations & Commission
  • Generator/ATS Installations and Commission
  • Area lighting and VSU/DSU Installation and Commissioning
  • Verify Point to Point with Contractor
  • Dock loading arm Commissioning
  • Review all ITP's and sign offs
  • Attend meetings for vendors and scheduling
  • Witness Motor Run ins

I&E Inspector

Kestrel Engineering, Inc.
06.2018 - 09.2020
  • Execute the specific inspections on materials, equipment, and construction/installation activities on site
  • Commission and sell of Motors, transformer, transmitters, flow meters, lighting, grounding, Analyzers, PEC buildings, MCC 's, Switchgears, and UPS system
  • Inspect all above and underground installations for sell of witness Arc Flash Plenum F.A.T' s and motor run- ins, High Pot
  • Document and report contractor's installations, drawings, sign off folders
  • Test results, loop checks, motors, high and low switch gear check out, VFD 's, Area Lighting, review Data Sheets for projects
  • Review Drawings, Research, Report for client's assurance installations
  • Walk Thru with Project Management, clients, contractors, vendors

Electrical Foreman

PLC Construction
03.2017 - 05.2018
  • Company Overview: (West Texas)
  • Attend Morning and ongoing weekly meetings
  • Execute work deadlines
  • Oversee foreman and employee's installations, wiring and cable pulls
  • Prepare material take off requests
  • Install Heat Trace Panels, set points in heat trace Controllers and Transformers
  • Pretest heat trace panels
  • Instrument documentation and Spec sheets as well as PSS start up
  • Review Drawings and send RFI to Engineer, build sign off folders and permit request
  • Project walk thru with QC, plan and schedule sell offs

Electrical Foreman

Strike, LLC
10.2017 - 02.2018
  • Company Overview: Baytown, TX
  • Oversee installations on conduit, grounding, cable pulls, duct banks, setting of transformers15kv ,4160kv & 480v
  • Fence grounding, cable testing, troubleshooting meg wires, install light poles and ESD stands and mounting J boxes and lighting arrester system
  • Assist vendors with wiring configuration
  • Goal is to turn over a functional facility

Electrical Foreman

Triad Electric & Controls
07.2016 - 11.2017
  • Company Overview: Baytown, TX
  • In charge of Substation and Transformer yard, oversee Motor, Transformer, instrument termination as well as RIE & RIOM
  • Install aviation lights with controllers and assist with programming, install lighting, convenience outlets, welding outlets
  • Assist with trouble shooting termination, Project walk downs with client and third party
  • Plan for Motor Solo runs and PSSR inspection and checkout


Instrument & Electrical GF

Bilfinger/ Westcon
11.2011 - 07.2016
  • Company Overview: Deer Park, TX
  • Attend Morning and ongoing weekly meetings
  • Execute work deadlines
  • Prepare material take off requests
  • Install Heat Trace Panels/Controllers
  • Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
  • Review Drawings, Send RFI to Engineer, build sign off folders and permit request
  • Install Conduit, cable trays, supports, stress cones, buss duct
  • Also, Transmitters, build communication racks, and pull wire
  • Terminate Field / MCC
  • Troubleshoot and verify loops and assist in startup

Instrument & Electrical GF

Williams Industrial
07.2011 - 11.2011
  • Company Overview: Tucker, GA
  • Attend Morning and ongoing weekly meetings
  • Execute work deadlines
  • Prepare material take off requests
  • Install Heat Trace Panels/Controllers
  • Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
  • Review Drawings, Send RFI to Engineer, build sign off folders and permit request
  • Project walk thru with QC, plan and schedule sell offs

Electrical Foreman

Tracer Construction
12.2010 - 07.2011
  • Company Overview: Deer Park, TX
  • Attend Morning and ongoing weekly meetings
  • Execute work deadlines
  • Prepare material take off requests
  • Install Heat Trace Panels, set points in heat trace Controllers and Transformers
  • Pretest heat trace panels
  • Coordinate with plant representatives, plan and schedule vendors, perform project walk thru
  • Review Drawings, Send RFI to Engineer, build sign off folders and permit request
  • Project walk thru with QC, plan and schedule sell offs


Electrical Journeymen

Austin Industrial
07.2010 - 09.2010
  • Company Overview: Deer Park, TX
  • Install Conduit, cable trays, supports, stress cones, buss duct as well as transmitters, build communication racks, and pull wire
  • Terminate Field / MCC
  • Troubleshoot and verify loops and assist in startup


Education

High School Graduate -

Skills

  • NFPA 70E Trained /CPR Trained- AED Trained
  • Forklift Operator Trained
  • Mini X Operator Trained
  • MS word/ Excel/Email Outlook
  • Wiring Diagrams/ Function Tests
  • Electrical Systems & Controls
  • Generators & Transformers
  • Troubleshoot and verify loops
  • Field Installations
  • Third Party Inspections
  • Troubleshoot Switches & Circuit breakers
  • Low & High voltage switch gears
  • Heat Trace Installations & Controllers
  • Arc Flash Plenum Installations
  • Substation Equipment Set Up
  • Inspection reporting/ Report writing
  • Blueprint reading

Certification

  • TEXAS JOURNEYMAN ELECTRICIAN, #99294
  • NCCER PLUS, #2153238

Timeline

I&E Inspector

Energy Inspection Services
06.2022 - Current

I&E Inspector

J Tam Engineering
09.2020 - 03.2022

I&E Inspector

Kestrel Engineering, Inc.
06.2018 - 09.2020

Electrical Foreman

Strike, LLC
10.2017 - 02.2018

Electrical Foreman

PLC Construction
03.2017 - 05.2018

Electrical Foreman

Triad Electric & Controls
07.2016 - 11.2017

Instrument & Electrical GF

Bilfinger/ Westcon
11.2011 - 07.2016

Instrument & Electrical GF

Williams Industrial
07.2011 - 11.2011

Electrical Foreman

Tracer Construction
12.2010 - 07.2011

Electrical Journeymen

Austin Industrial
07.2010 - 09.2010

High School Graduate -