Goal-driven Field Supervisor dedicated to providing high-quality construction services to discerning clients. Offering first-rate construction management and field supervision expertise. Skillful in working with architects, inspectors, designers and subcontractors to accomplish high-quality project work.
Overview
9
9
years of professional experience
Work History
Contractor
Powerclean Solutions
02.2021 - 02.2024
Consult with customers to assess needs and propose optimal solutions to any problems that occur
Improved project efficiency by streamlining communication channels and optimizing resource allocation.
Calculated required number of materials needed for project completion
Supported creation of detailed, technical financial models to value potential acquisition targets.
Provided job quotes/estimates
Communicate updates, timelines and any issue that comes up during the project
Installed cabinets, base cabinets, and other trim
Installed custom wood and acoustical ceilings
Hang drywall or any drywall repairs
Installed electrical equipment such as new electrical boxes for lighting or ceiling fans
Project punch walks with customers to ensure project completeness and overall customer satisfaction
Maintain safety of self when operating all hand tools, including nail guns, miter saws, table saws, drills, circular saws/jigsaws.
Completed each job with a 95% customer satisfaction and customer return
Managed multiple projects simultaneously while maintaining strict adherence to deadlines and budgets.
Install Foreman
Northern Colorado Builders
10.2017 - 12.2020
Assigned workers tasks and schedules for specific jobs based on individual strengths
Created and maintained daily and weekly reports for upper management.
Fulfilled production schedules by adjusting workforce size, team operations and project deliverables
Scheduled and oversaw maintenance, repair and installation activities.
Read specifications and blueprints for construction activity planning
Reviewed work progress against project goals and milestones
Analyzed problems and recommended solutions, boosting productivity and output
Determined solutions to problems after evaluating client requirements
Helped workers complete tasks with hands-on assistance at job locations
Completed jobs as lead with 90% on time rate
Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
Expedited project completion timeframes through close collaboration with team members and clear communication.
Reviewed and studied blueprints to double-check installation and implementation project requirements.
Enhanced customer satisfaction by quickly addressing and resolving any installation issues or concerns.
Lead Finish Carpenter
Division 6 Millwork
12.2016 - 10.2017
Constructed and installed stair railings of wood or metal
Installed baseboards, chair rail, and crown-molding into interior spaces to complete walls
Installed laminate or stain finished cabinets as well as laminate and stone countertops
Gained knowledge working in a shop as well as helping maintain a clean and safe work environment.
Followed strict adherence to safety protocols from job start to final clean up to prevent accidents and mishaps.
Increased project efficiency by effectively managing materials, tools, and resources needed for each job.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Facilitated smooth communication between all parties involved in a project, minimizing misunderstandings and ensuring timely completion of tasks.
Finish Trim Carpenter
PCH Builders
10.2014 - 05.2016
Minimized material waste or construction errors through accurate measurement and cutting
Installed baseboards into interior spaces to complete walls
Installed interior doors and checked alignment for correct opening and closing
Installed interior cabinets and countertops per architectural drawings
Installed finish wood products like wood paneling, barn doors, beetle kill wood ceilings.
Reduced material waste by utilizing advanced cutting techniques and optimizing material usage during trim installations.
Promoted positive company images by consistently delivering high-quality results that exceeded client expectations for both aesthetic appeal and structural integrity.
Education
Some College (No Degree) - Accounting And Business Management
College America
Denver, CO
Skills
Coordination
Supply management
Blueprint interpretation
Site supervision
Materials estimation
Customer relations
Scheduling
Task prioritization
Construction management
Safety Compliance
Quantitative skills
Data Analysis
Timeline
Contractor
Powerclean Solutions
02.2021 - 02.2024
Install Foreman
Northern Colorado Builders
10.2017 - 12.2020
Lead Finish Carpenter
Division 6 Millwork
12.2016 - 10.2017
Finish Trim Carpenter
PCH Builders
10.2014 - 05.2016
Some College (No Degree) - Accounting And Business Management
College America
Similar Profiles
Joseph (Joe) KennedyJoseph (Joe) Kennedy
Business Owner at JP Powerclean LLCBusiness Owner at JP Powerclean LLC