
Mr. Rice has over 20 years’ experience in the field of surveying as a project surveyor, survey technician, party chief and chainman. Mr. Rice has accumulated years of diverse surveying experience in both the field and office, performing many types of surveys from the research and pre-calculations stage all the way to the final deliverable, thus a true “field to finish” surveyor. Forward-thinking project management specialist confident in leading team members, managing schedules and coordinating resources. Keeps projects on-track with decisive supervision and quick problem-solving. Persuasive in communicating and negotiating with internal team members, vendors and other stakeholders.
California Professional Land Surveyor, 9346
Kinder-Morgan CALNEV Pipeline Survey, Set primary GPS control network from Colton, CA to Las Vegas, NV
Metropolitan Water District (MWD), Performed boundary and topographic surveys of MWD easement holdings. Mapped and filed Record of Surveys with Orange, Riverside and San Bernardino Counties.
Pipeline Safety Enhancement Plan (PSEP), Responsible for survey, right of way mapping and construction survey activity of specific transmission and distribution lines in the Southern California Region.
Hydrogen Energy California (HECA) Project, Boundary and topographic survey for feasibility study in Buttonwillow, CA and surrounding areas.
Port of Long Beach, Pier E Expansion Project, Construction staking and as-built certifications working as a subconsultant for the Port of Long Beach.
Long Beach Gas & Oil (On-Call), As-built surveys on gas pipelines including mapping and QA/QC of field data.
City Of Santa Ana, Civic Center Chiller Line, Topographic survey for design, construction staking and pipeline weld as-built documenting for chilled water line installation at the Civic Center.
I-405 Expansion, Boundary establishment and mapping a Record of Survey.
Orange County Sanitation District (On-Call), Construction staking, as-built certifications and monument preservation.