
Skilled general construction laborer with a robust background in general construction and concrete work, demonstrated through impactful roles at All Season, and Attic Projects as well as other companies. Excelled in leading teams, enhancing job site efficiency, and mastering most jobs. Renowned for exceptional hand-eye coordination and a quick-learning ability, consistently delivering projects to the highest standards. As well as having a great understanding that work is work, and no man is better than the task at hand.
Responsible for crew members, job sites, equipment and tools.
Restored, revamped attics and crawl spaces with insulation, rodent-proofing, and a vapor barrier.
This includes repairs to various parts of damaged vents.
Making sure to adhere to all safety guidelines and practices.
Start of day was pre-trip, inspect truck. This includes oil, transmission, coolant, slack adjusters (air brake system), tires, lights, suspension and wheel hubs before driving vehicle daily. Made sure pump worked, had all cleaning supplies, extra parts to maintain units; toilet paper and tools such as hand tools. Drills and other items.
Was responsible for tackling 50 plus stops in daily route, cleaning portable toilets. Completing this in a timely manner.
Maintaining cleanliness, and making sure all toilets were pumped and replaced broken parts with new parts.
Always making sure to follow specific laws and practice safety at all times as a tanker driver.
Inside work: Responsible for job sites, crewmembers, all equipment, material and tools. Worked along with crew members to make sure job quality was applied. Drove company vehicle from main office to each job site daily. Broke out concrete from perimeters of buildings. Dug out contaminated dirt and removed using buckets. Grade trenches to proper depth of outside ground level; then footing wall is bored through with concrete bit to outside dug graded trench, then connected to outside drain system all done by the crew assigned to the task that day. Piped with perforated pipe and leveled to gravity. Filled in with drain rock, 2 - 3 inches from top of pipe to concrete level. Then, concrete is mixed with crew members, poured back and laid and finished by Foreman only.
Outside work: Dig trench and grade from bored hole in footing wall up to outside draining system, which is a hole dug 6ft X 6ft X 6ft filled with rock. Fix any and all landscaping upon completion of work.
All sites kept clean at all times.