Summary
Overview
Work History
Education
Skills
Timeline
Generic

Aaron Caballero

Corpus Christi,TX

Summary

To obtain a career as an Analyzer Technician and Instrumentation Technician to utilize my strong safe work ethics, strong self-esteem and ambitious team player.

Overview

5
5
years of professional experience

Work History

Instrument Tech

UPS (GCGV Exxon)
07.2023 - Current
  • Experience in MEG, Polyethylene, Furnaces and Boiler experience.
  • Practicing safe work practices, Doing our pre task meetings before any job task, making sure our safe guards are in place and using out stop work authorities.
  • Diagnosed and improved Fisher valves' DVC operation by troubleshooting TopWorx, addressing switch malfunctions, and replacing components as needed. Demonstrated comprehensive proficiency in troubleshooting Blowback systems utilizing Siemens PLCs.

Instrument Tech

TASC (GCGV Exxon)
06.2022 - 07.2023
  • Duties: Regular Maintence from the first meeting in the morning with coworkers and supervisors
  • Working with EXXON with fixing FT, PT, LT and Valves (actuating and control valves)
  • Using our pumps and FLUKE 789 and Trex for verification of calibrations also sending signals to verify equipment reads correctly
  • Maintaining out quality LPSAs with coworkers and supervisors
  • Validating Safety Critical devices with a procedure that is followed to ensure the task is done properly and making sure safety protocols are in place so nothing with cause a trip or shut down

Instrument Tech

TASC (GCGV Exxon)
11.2021 - 01.2022
  • Duties: Night/Day shift Instrumentation calibration, and maintenece to spec for level, pressure and differential transmitters
  • Witnessed Vortex Transmitters Endersonhouser vender come work on a Transmitter
  • Did 5 point check for Fisher Valves through DCS
  • Calibrating Fisher valve and taking them out of service
  • Swapping RTD and TT that were not reading correctly
  • Practiced safety before ever job with an LPSA and saftey meeting
  • Used Trex and Fluke 789 for calibration and simulation

Instrument Tech

First Instrument Solutions
Corpus Christi, Tx
08.2021 - 10.2021
  • Duties: Shop maintenance/ Clean up
  • Deliveries to Plants
  • Removing insulation from pipe lines in plants
  • Installing and removing valves

Instrument Tech

MMR Construction
Victoria, TX
01.2020 - 02.2020
  • Duties: Walk downs, installed tubing and conduit
  • Stroked a couple valves and Calibrated a few instruments

Instrumentation Tech

MMR Construction
Victoria, TX
07.2019 - 01.2020
  • Duties: Practice Safety, Follow Lab Procedures and Good Work Ethics
  • Calibrated instruments with Hart 475, Fluke 789, Fluke 721, Fluke 754, Emerson Trex, Merium, High and low pressure Druke pumps
  • We bench calibrated 30 instruments a day for 6 months and helped formosa with stroking valves
  • We Calibrated skid packages for Formosa

Instrument Tech

MMR Construction
Victoria, TX
04.2022
  • Duties: Helped Invista with ICP making sure valves are opening when they are tripped or given 0%/100% following a list given to us
  • Made sure thermocouples are reading ambient temp

Education

Associates of Applied Science - Instrumentation Technology

Texas State Technical College
Waco, TX
04.2019

Skills

  • Calibrating Rosemount, yokagawa, fisher control valves, troubleshooting skids
  • Low and High Pressure Calibration
  • Cabinet Troubleshooting
  • Blowback systems and PLC programing

Timeline

Instrument Tech

UPS (GCGV Exxon)
07.2023 - Current

Instrument Tech

TASC (GCGV Exxon)
06.2022 - 07.2023

Instrument Tech

MMR Construction
04.2022

Instrument Tech

TASC (GCGV Exxon)
11.2021 - 01.2022

Instrument Tech

First Instrument Solutions
08.2021 - 10.2021

Instrument Tech

MMR Construction
01.2020 - 02.2020

Instrumentation Tech

MMR Construction
07.2019 - 01.2020

Associates of Applied Science - Instrumentation Technology

Texas State Technical College
Aaron Caballero