Summary
Work History
Education
Skills
Timeline
Generic

Aaron Fultz

Beckley,WV

Summary

At Radford and Radford, I carried out Framing and carpentry related task. I planned and lead learning carpenters to the completion of the task at hand. I have 18yrs experience in carpentry and construction

Work History

Carpenter/ Foreman

Radford and Radford
Beckley, WV
10.2024 - Current
  • Mentored junior carpenters to develop their skills, ensuring a well-trained workforce for future projects.
  • Increased project efficiency by delegating tasks and supervising a team of carpenters.
  • Ensured compliance with building codes by thoroughly reviewing design plans before commencing construction tasks.
  • Reduced material waste by implementing accurate measurements, cutting techniques, and proper storage practices.
  • Enhanced client satisfaction with high-quality craftsmanship in custom carpentry work.
  • Managed subcontractors effectively to ensure timely delivery of materials and services without compromising quality.
  • Inspected work performed by carpentry crews to check completion of job specifications.

Education

GED -

JJ Kelly High School
Wise, VA
06.1998

Skills

  • Hand and power tools
  • Job site maintenance
  • Safety processes and procedures
  • Blueprint reading
  • Project management
  • Material prepping
  • Heavy lifting
  • Time and material estimates
  • Conflict resolution
  • Performance management
  • General carpentry
  • Job specifications
  • Flooring installation
  • Flooring construction
  • Renovation oversight
  • Safety guidelines adherence
  • Carpentry projects
  • Construction safety
  • Basic mathematics
  • Attention to detail
  • Employee management
  • Site maintenance
  • Worker supervision
  • Forklift operation
  • Scaffolding set up
  • Dependable and hardworking
  • Following instructions
  • Heavy equipment operations
  • Hand and power tool operation
  • Inventory management
  • Job planning
  • Commercial construction experience
  • Equipment operation
  • Preventive equipment maintenance
  • Equipment Repair
  • Framing wood/metal
  • All types of roofing and repair

    Tile prep and installation

    Concrete forums

    Door installation

    Door hardware installation

    Custom door frames and hinge pocket mortifying

    Window installation

    Window and door capping

    Metal brake work

    Interior trim installation crown molding, base ect

    Painting

    Minor Plumbing

    Layout of walls, decks,rooms,houses

    Post Frame buildins

    Hang drywall

    Demo work

Timeline

Carpenter/ Foreman

Radford and Radford
10.2024 - Current

GED -

JJ Kelly High School
Aaron Fultz