Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Adrian Huerta

Odessa,TX

Summary

Results-driven Field Supervisor versed in site management and performance optimization. Highly effective at operating with minimal input and accomplishing project objectives according to budget and timeline requirements.

Overview

10
10
years of professional experience

Work History

Filed Supervisor

Lone Star Instrumentation & Electric
09.2023 - Current
  • Kept teams on task to complete milestones on time.
  • Met with customers to resolve issues and build productive relationships.
  • Evaluated performance and progress, and made proactive adjustments.
  • Planned and scheduled field activities according to set timelines and order of operations.
  • Supervised field operations teams to complete projects within established timelines.
  • Resolved customer complaints to maintain satisfaction and loyalty.
  • Sourced suppliers and purchased necessary materials for work.
  • Directed projects according to schedule and quality demands.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.

Electrical Superintendent

The Industrial Company, TIC
02.2019 - 08.2023
  • Scheduled projects and planned all required materials, tasks and team assignments.
  • Supervised crew of electricians and maintained safe, efficient and structured work environment.
  • Managed performance evaluation and scheduling of electrical team members.
  • Facilitated work site safety by applying knowledge of safety protocol and awareness of potential hazards.

I&E General Forman

TIC
01.2019 - 03.2020
  • Worked alongside team to accomplish work goals according to schedule.
  • Ordered necessary supplies and materials required for installation of new work and remodeling of existing systems.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Analyzed blueprints to determine where to run wires, install electrical outlets and connect wires to central circuit panels.

I&E Foreman

Tom-E-Lee
07.2018 - 12.2018
  • Managed various electrical projects;
  • Started projects with getting a material take off and procuring all material thought the entire project.
  • Helped order all instrumentation electrical devices as per customer specs.
  • Managed all man hours to complete project in a timely matter, issued change orders as needed per changes not in scope of work.
  • Studied and interpreted drawings in order to determine instrumentation locations and required methods and materials.
  • Directed crews with up to 1 team members and planned all work in advance.
  • Led daily meetings to discuss health, safety and environmental concerns.

Instrumentation General Foreman

TIC
05.2017 - 06.2018
  • Directed crews with up to 10 team members and planned all work in advance.
  • Studied and interpreted drawings in order to determine instrumentation locations and required methods and materials.
  • Ordered all material to assure all planned work will not be affected by lack of planning.
  • Led daily meetings to discuss health, safety and environmental concerns.
  • Coordinated with mechanical group to resolve instrumentation conflicts concerning work coordination.

Instrumentation Foreman

Zachry Group
02.2016 - 04.2017
  • Oversaw crews to assure all crews where punctual and presentable to work.
  • Completed daily time sheets and man hours per instruments installed.
  • Oversaw all projects to ensure jobs were completed in a timely manner to achieve on-time delivery.
  • Made sure tubing crew took good measurements and cut SS Tubing based on the specific layout of a P&ID's and bent SS Tubing to fit the layout.
  • Assembled and installed precise instruments that measure, transmit, record and control.
  • Exceeded customer product expectations by maintaining quality workmanship.

Instrumentation Foreman

Lone Star Corporation
03.2015 - 03.2016
  • Ran various gas compressor install projects.
  • Procured all instruments and material as per project.
  • Installed all instruments for the site and ran all tubing as needed.
  • Relocated the compressor control panel and re routed all instruments, conduit, and wiring to read all pressures needed by customers.
  • Directed conduit runs to electricians to all end devices before the instrument was installed to help assure project was completed on time.
  • Relocated the compressor control panel and re routed all instruments, conduit, and wiring to read all pressures needed by customers.
  • Assisted in terminating all wiring in j-boxes and PLC as per prints.

Education

GED -

Odessa High
Odessa, TX

Skills

  • Operational planning expertise
  • Schedule development
  • Safety and hazard management
  • Strategic planning

Languages

Spanish
Native or Bilingual

Timeline

Filed Supervisor

Lone Star Instrumentation & Electric
09.2023 - Current

Electrical Superintendent

The Industrial Company, TIC
02.2019 - 08.2023

I&E General Forman

TIC
01.2019 - 03.2020

I&E Foreman

Tom-E-Lee
07.2018 - 12.2018

Instrumentation General Foreman

TIC
05.2017 - 06.2018

Instrumentation Foreman

Zachry Group
02.2016 - 04.2017

Instrumentation Foreman

Lone Star Corporation
03.2015 - 03.2016

GED -

Odessa High