Over the past years, I have gained valuable experience across a variety of roles and industries, developing a diverse skill set, and a strong work ethic. Proficient in teamwork, working under pressure, and managing time effectively, I excel at maintaining precision and organization in all tasks. Committed to continuous growth and development, I aim to apply my knowledge and skills to contribute meaningfully to my career and the success of my team.
Overview
6
6
years of professional experience
Work History
Remodel Associate
Walmart
Mission
03.2019 - 06.2019
Created estimates for customers based on their desired project scope and budget requirements.
Inspected delivered items for damages or defects before accepting them into the store inventory.
Cleaned or prepared construction sites to eliminate hazards.
Performed demanding physical work over extended periods and modeled positive attitude.
Operated equipment with strong focus on safety and ground communication.
Worked five days out of the week for 40 hours
Ironworker
REPCON
Houston
01.2020 - 03.2020
Fabricated steel frames, columns, beams, and girders, according to blueprints or instructions from site managers.
Erected structural steel and iron frameworks for bridges, buildings, and other structures.
Complied with OSHA and company safety guidelines for height safety, lockout/tagout, confined space, and hazardous material handling.
Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
Ensured structural integrity by properly installing and aligning steel components according to specifications.
I worked five days out of the week and fifty hours per week.
Hvac Maintenance
Texas Filter Services
Mission
07.2021 - 12.2021
Updated and maintained service records and documentation for all HVAC maintenance and repair activities.
Conducted routine maintenance on all cleanroom systems including HVAC systems.
Performed routine HVAC maintenance for optimal indoor air quality and temperature control.
Enhanced system efficiency by conducting regular HVAC maintenance and repairs.
Completed timely HVAC maintenance tasks for optimal climate control within the building environment.
I worked five days out of the week and 40 to 50 hours per week.
Produce and Meat Market
Walmart
Mission
02.2022 - 07.2024
Maintained a clean and organized workspace, adhering to stringent sanitation standards for food-handling areas.
Improved product quality by conducting regular checks for expiration dates, and ensuring proper rotation of stock.
Opened, shelved, and merchandised new products in visually appealing and organized displays for optimal sales promotions.
Reduced shrinkage rates through diligent attention to product rotation, minimizing spoilage, and waste disposal efforts.
Maintained cleanliness of work area throughout shift, including sweeping floors and wiping down surfaces.
Examined grocery products to immediately remove from stock expired or spoiled items, adhering to "first in, first out" rule.
Performed quality checks on produce, removing damaged or spoiled items promptly.
I worked 5 days out of the week and worked 40 hours per week.
Meat Market Associate
HEB Grocery Store
McAllen
07.2024 - 08.2024
Assisted customers in selecting appropriate cuts of meat based on their needs.
Cleaned and sanitized meat processing areas, equipment, and tools.
Adhered to company policies regarding pricing, promotions, discounts.
Organized store by returning merchandise to proper areas and restocked displays.
Cleaned shelves, counters and tables to maintain organized store.
Greeted customers to determine wants or needs.
Assisted with special projects such as promotional displays or seasonal events.
Worked 2-3 days out of the week for 16-24 hours a week
Scaffold/Carpenter Builder
Performance Contractors Inc.
Corpus Christi
08.2024 - 11.2024
Constructed scaffolds in appropriate positions and secured completed structures in place.
Repaired and replaced faulty or damaged scaffold materials.
Dismantled scaffolding once construction activities had been completed in accordance with safety regulations.
Followed instructions from supervisors regarding layout, design, installation and maintenance of the structure.
Demonstrated adaptability by working on various types of scaffolds, such as tube-and-clamp, systems, or frame scaffolds, as required for each project.
Followed OSHA regulations and safety standards when installing and working with scaffolding.
Promoted a strong teamwork environment by actively participating in group problem-solving sessions concerning complex designs, or difficult installations.
Upheld quality standards throughout the duration of projects, with meticulous attention to detail in all aspects of scaffold assembly.
Reduced worksite accidents through diligent maintenance of scaffolding systems, replacing damaged or worn parts as needed.
I worked 6 out of 7 days a week and 60 to 80 hours per week.