Summary
Overview
Work History
Education
Skills
Timeline
Generic

Alvin Pachosa

Coulee Dam,WA

Summary

Resourceful Construction Professional with experience in corporate construction and residential home projects. Team player with knowledge in tracking tasks and keeping projects on-task. Independent multi-tasker to facilitate projects through completion.

Overview

9
9
years of professional experience

Work History

Facility Maintenance Worker

CCT Public Works
Nespelem, WA
05.2022 - Current
  • Used ladders or scaffolding to access hard-to-reach areas during maintenance tasks.
  • Cleaned and maintained all equipment used in facility maintenance operations.
  • Operated power tools such as drills and saws to perform necessary repairs.
  • Performed minor electrical repairs such as replacing fuses, light bulbs, and outlets.
  • Inspected buildings' structures to determine the need for repairs or renovations.
  • Fixed structural defects such as cracks in walls or ceilings using plaster or cement mix.
  • Installed new plumbing fixtures such as sinks, toilets, showers, tubs, valves.
  • Conducted routine checks of fire alarm system components to ensure they are working properly.
  • Ensured that all safety protocols were followed when performing maintenance tasks.
  • Assisted in the installation of new mechanical systems including heating and cooling units and pumps.
  • Repaired broken windows, doors, walls, roofs, and other building components.
  • Painted interior and exterior surfaces of buildings using brushes or sprayers.
  • Responded quickly to emergency repair requests from tenants or visitors at the facility.
  • Performed building and equipment maintenance and repairs by doing heating, ventilation, air conditioning, carpentry, plumbing, electrical, vehicular and machinery work.
  • Routinely inspected equipment for preventive and emergency maintenance needs.
  • Adjusted devices or control instruments using hand tools, levels or straightedges.
  • Repaired machines, equipment or structures using tools or equipment.
  • Assembled, installed or repaired electrical or electronic components and pipe systems.
  • Dismantled machines, equipment, or devices to access and remove defective parts.
  • Measured, cut and installed metal edging along eaves of roofs.
  • Communicated effectively with colleagues regarding progress of work being done onsite.

Carpentry Laborer

Josh Flowers
Grand Coulee, WA
06.2021 - 04.2022
  • Maintained tools and supplies in good condition throughout the project duration.
  • Attached sheathing materials to exterior walls of buildings with nails or screws.
  • Applied weatherproofing treatments to exposed wood surfaces prior to painting or staining.
  • Measured and cut lumber to required size for framing walls, floors, and roofs.
  • Fastened sub-flooring panels securely in place before installing floor coverings such as carpets or vinyl tiles.
  • Maintained a clean workspace by disposing off any waste material properly after completing tasks.
  • Constructed formwork for concrete foundations using timber boards.
  • Connected headers over windows and doorways in order to provide support for the structure's load bearing capacity.
  • Provided assistance to other tradespeople when needed during the building process.
  • Checked accuracy of measurements against blueprints before cutting materials accordingly.
  • Laid out floor joists in accordance with approved plans.
  • Measured and marked cutting lines on wood and raw materials.
  • Applied caulk, sealants and other agents to installed surfaces.
  • Mixed mortar, plaster, and grout according to standard formulas.
  • Worked independently on projects and tasks within carpentry team.
  • Consistently constructed square and level projects.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Anchored and braced forms and other structures in place using nails, bolts, anchor rods, steel cables, planks, wedges and timbers.

Block Mason

Old World Stone
Grand Coulee, Washington
04.2020 - 01.2021
  • Grouted joints between blocks to ensure structural integrity of the wall.
  • Cut blocks or bricks using power saws, hammers and chisels as needed.
  • Applied waterproofing materials around window frames prior to installation of windows in masonry walls.
  • Installed metal anchors into concrete structures to secure masonry units.
  • Constructed brick arches, columns, and other structures according to design plans.
  • Prepared mortar mix for block laying, using hoes, cement mixers, or mortars boxes.
  • Laid block courses of varying heights to create level surfaces for buildings.
  • Scaffolded work areas as necessary to reach higher elevations on buildings.
  • Moved bricks, tools and supplies with equipment such as forklifts and hand trucks.
  • Prepared concrete by mixing water with cement, sand and gravel.
  • Cleaned and prepared work surfaces with appropriate tools and solvents.
  • Restored mortar joints by removing mortar to exact depth and replacing with fresh mortar.
  • Smoothed final surfaces by removing excess mortar and finishing joints.
  • Measured distance from reference points and marked guidelines to lay out work with plumb bobs and levels.
  • Broke or cut bricks, tiles and blocks to size, using trowel edge, hammer or power saw.
  • Laid bricks or blocks in the proper configurations according to plans.

Journeyman Laborer

Acme Concrete Paving
Spokane, WA
01.2020 - 03.2020
  • Repaired damaged or broken forms as needed to prepare them for reuse.
  • Stripped off formed surfaces once they had set properly according to design plans.
  • Ensured that all measurements were accurate with a tape measure or other tools.
  • Measured and cut wooden boards to specific dimensions for formwork fabrication.
  • Installed steel reinforcing bars into concrete forms prior to pouring concrete.
  • Mixed, poured, spread and smoothed concrete using hand tools and power trowels.
  • Consistently constructed square and level projects.
  • Utilized various tools, equipment, materials and forming systems to complete construction tasks.
  • Bore boltholes in wood, masonry or concrete using electric or pneumatic drill.
  • Assist in demolishing existing structures with jackhammers and other tools as needed.
  • Prepare and pour foundations for structures.
  • Smooth out freshly poured concrete with trowels and other finishing tools.
  • Use shovels, hoes, rakes, and other tools to spread or level concrete.
  • Carry heavy materials such as bricks, blocks, lumber, mortar mixers, and wheelbarrows across job sites safely.
  • Loaded and unloaded materials from trucks using appropriate lifting techniques.
  • Built forms to specific dimensions to shape wet concrete.
  • Applied hardening and sealing compounds to cure concrete surface.
  • Signaled truck driver to pour concrete and move chute, directing concrete on forms.
  • Assisted in loading and unloading supplies such as bags of cement onto trucks or wheelbarrows.

Journeyman Laborer

Kuney Construction
Spokane, WA
03.2019 - 12.2019
  • Cleaned up hazardous materials such as asbestos or lead paint during demolition projects.
  • Erected scaffolding according to job specifications.
  • Carried tools and equipment between job sites as required.
  • Unloaded trucks with supplies for construction projects.
  • Removed rubble and other debris at construction sites using wheelbarrows or other equipment.
  • Repaired damaged structures such as walls or floors when needed.
  • Provided support to skilled tradespeople including carpenters, masons, plumbers, electricians.
  • Set up ladders or temporary platforms used in construction projects.
  • Used picks and shovels to dig, spread and level dirt and gravel.
  • Assisted with the installation of bridge components, including columns and beams.
  • Checked bolts, nuts, screws, ties, brackets, and other fasteners used in the assembly process of bridges.
  • Provided support for heavy lifting operations involving large components or sections of a bridge structure.
  • Assembled formwork systems prior to pouring concrete into molds for bridge components.
  • Ensured that all safety protocols were adhered to during bridge labor operations.
  • Installed steel decking panels on newly constructed bridges according to plans.
  • Set up barricades around areas where repair or maintenance work is being performed on an existing bridge.
  • Monitored traffic conditions around work sites for safe operation of equipment and personnel.
  • Directed traffic around construction areas and obstacles to keep road crews safe.
  • Built and disassembled scaffolds, bracing, and barricades to assist in vertical construction activities.
  • Used range of hands tools, power tools and construction equipment to spread gravel and asphalt.
  • Prepared site areas for day's asphalt load.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Signaled equipment operators to facilitate alignment, movement or adjustment of machinery.

Journeyman Hod Carrier

Bedrock Masonry
Couer D'alene, Idaho
07.2016 - 01.2019
  • Carried out basic demolition work when needed.
  • Loaded and unloaded building materials from delivery vehicles to the site.
  • Used hand trowel to spread cement mix across surface area ready for paving slabs.
  • Cleaned up debris on site after completion of a task or job.
  • Attended tool box talks prior to each shift in accordance with company policy.
  • Stacked bricks into neat piles according to size and colour as directed by supervisor.
  • Assisted in mixing mortar for use in bricklaying.
  • Unloaded and distributed bricks, blocks and other building materials to the required areas of the construction site.
  • Prepared and handled materials and masonry tools and equipment.
  • Mixed thinset, mortar, concrete, epoxies and other adhesive or bonding products.
  • Applied grout between joints and smoothed every line to achieve clean finish.
  • Erected and broke down scaffolding, ladders and other support structures for installations.
  • Supplied materials to masons for installation, following drawings and numbered sequences.
  • Organized and cleaned work area and tools.
  • Placed expansion joints at intervals in freshly laid cement to prevent cracking due to temperature changes.
  • Trained team members in proper installation methods to meet project quality and efficiency standards.
  • Trained apprentice hod carriers to fulfill job requirements.
  • Completed jobs throughout the course of employment.
  • Prepared mortar mix for block laying, using hoes, cement mixers, or mortars boxes.
  • Cut blocks or bricks using power saws, hammers and chisels as needed.

Wildland Firefighter

Mount Tolman Fire Center
Keller, WA
03.2015 - 12.2015
  • Conducted mop-up operations to extinguish remaining hot spots and reduce the risk of further spread.
  • Inspected assigned area for new starts, smoke sightings or other signs of active fires.
  • Attended daily briefings with crew members to discuss strategy for upcoming shifts.
  • Provided fire suppression and containment for wildland fires using hand tools, pumps, hoses and other equipment.
  • Performed backfire operations to contain advancing fires by burning fuel ahead of them.
  • Responded quickly and effectively to emergency situations while adhering to safety protocols.
  • Built containment lines around the perimeter of an active wildfire using shovels, Pulaskis and chainsaws.
  • Coordinated with both federal and state agencies during incident response activities.
  • Assisted in hazardous fuels reduction projects such as cutting brush, felling trees and chipping debris.
  • Conducted controlled burns to reduce wildfire risks and manage ecosystems.
  • Participated in rigorous physical training to maintain high levels of fitness and readiness.
  • Engaged in post-fire operations, including mop-up and rehabilitation of affected areas.
  • Attended trainings to maintain wealth of knowledge in firefighting techniques and suppression methods, enabling quick decision making during actual emergencies.

Education

High School Diploma -

Lake Roosevelt High School
Coulee Dam, WA
06-2010

Some College (No Degree) -

Spokane Community College
Spokane, WA

Skills

  • Flooring Installation
  • Painting techniques
  • Plumbing Repairs
  • Groundskeeping
  • Power Tool Operation
  • Lighting Systems
  • Equipment Installation
  • Mortar mixing
  • Scaffold building
  • Punctuality
  • Time management abilities
  • Materials Management
  • Teamwork and Collaboration
  • Scaffolding Erection
  • Joint sealing
  • OSHA Regulations
  • Attentive to detail
  • Basic Carpentry
  • Plumbing basics
  • Electrical Wiring
  • Scaffolding Setup
  • Electrical Installation
  • Electrical repair
  • Heavy Lifting
  • Residential wiring
  • Undergrounding Power Lines
  • Power and hand tool operation
  • Electrical maintenance and repair
  • Forklift Operation
  • Heavy Equipment Operation
  • Shipping and receiving
  • Materials Transport
  • General construction
  • Certified forklift operator
  • CPR training
  • Inventory Counts
  • Physically fit and agile
  • Asphalt Paving
  • Fall protection
  • Traffic Control
  • Road Construction
  • Site preparation
  • Hand tools proficiency
  • Certified Confined space
  • Certified Scissor lift operator
  • Certified Fall Protection
  • Structural repair
  • Window Installation
  • Flooring construction
  • General laborer
  • Finish Carpentry
  • Use of Power Tools
  • Hand tool use
  • Roofing repair work
  • Crew oversight
  • Maintenance knowledge
  • Damage Assessment
  • Training abilities
  • Concrete pump unloading
  • New Employee Training
  • Concrete mixing
  • Loading and unloading material for jobsite
  • Wire electrical
  • Operate Heavy Machinery

Timeline

Facility Maintenance Worker

CCT Public Works
05.2022 - Current

Carpentry Laborer

Josh Flowers
06.2021 - 04.2022

Block Mason

Old World Stone
04.2020 - 01.2021

Journeyman Laborer

Acme Concrete Paving
01.2020 - 03.2020

Journeyman Laborer

Kuney Construction
03.2019 - 12.2019

Journeyman Hod Carrier

Bedrock Masonry
07.2016 - 01.2019

Wildland Firefighter

Mount Tolman Fire Center
03.2015 - 12.2015

High School Diploma -

Lake Roosevelt High School

Some College (No Degree) -

Spokane Community College
Alvin Pachosa