Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Anca Tamas

Anca Tamas

Farmington

Summary

Results-driven Design Release Engineer with expertise in Telematics applications, software release management, and change management. Proven ability to enhance quality and streamline processes in complex software cycles.

Overview

2027
2027
years of professional experience
1
1
Certification

Work History

Design Release Engineer Software Application

Ford Motor Company
Dearborn
01.2015 - Current
  • Spearheaded the design, development, and release of Telematics Control Unit (TCU) applications and features for multiple Ford vehicle programs, ensuring alignment with program objectives, functional specifications, and global market requirements.
  • Managed the complete software and hardware release cycle for TCU applications, including creation and approval of all required documentation within the WERS (Worldwide Engineering Release System), ensuring timely and accurate releases.Directed supplier coordination efforts with Tier 1 and Tier 2 partners, overseeing development, integration, testing, and validation of TCU components and software to meet Ford's stringent quality and performance standards.
  • Authored and maintained VSCS (Vehicle Software Configuration Specification) updates for TCU applications, meticulously documenting software versions, configurations, and dependencies to ensure proper vehicle build and function.
  • Collaborated extensively with Ford's connected vehicle platform teams, cybersecurity, manufacturing, and service organizations to ensure seamless integration and lifecycle support for telematics features.
  • Managed software and calibration delivery, coordinating builds and over-the-air software updates.
  • Guide supplier partners thru the Ford Global Product Development System (GPDS)
  • Deliver software work packages of the software change management process (e.g. release documentation, functional validation, OTA software updates, etc.)
  • Work with Cross-Module network communication implementation
  • Investigate Diagnostic Trouble Code (DTC) issues
  • Support service manual development
  • Support the Breadboard/HiL (e.g. issue resolution, software updates, etc.)
  • Support prototype vehicle builds (e.g. root cause issues, flashing software, etc.)
  • Support assembly plant End-of-line (EOL) setup and issue resolution
  • Collaborated with plant PVT to prioritize and implement interim containment actions (ICA) and permanent corrective actions (PCA) addressing customer quality concerns from warranty, executive escalations, social media feedback, and technical hotline.
  • Take a central role in resolving customer issues and reducing warranty
  • Take ownership of customer critical issues and ensure resolution is achieved.
  • Analyzed warranty claims to identify trends and issues, informing quality improvement actions.
  • Utilize external and internal quality data to develop ICA/PCA actions for in-plant quality concerns and external warranty claims
  • Initiate/support Worldwide Engineering Release System (WERS) Concerns (CR) and alerts for design changes and plant trials
  • Lead plant trials for quality, cost, and supplier improvements
  • Support Launch on Major and Minor programs.

Design Release Engineer

Sumitomo Electric Industries Ltd
Farmington Hills
03.2013 - 01.2015
  • Designed and released wiring harnesses to meet project specifications.
  • Created 2D wiring harness drawings to support project implementation.
  • Led design review meetings at customer locations to achieve project alignment.
  • Composed engineering documentation, including FMEAs, 8Ds, BOMS, and design check sheets.
  • Coordinated with internal and external customers and manufacturing teams to streamline processes.
  • Contributed to the development of program-specific and future business plans supporting deliverables.
  • Partnered closely with lead engineers on various projects to enhance outcomes.
  • Worked alongside CAD designers on drawings and specific modules or systems.

Engineering Team Leader

Leoni Wiring Systems
Beius
2010 - 01.2012
  • Coordinated engineering team activities to align projects with client objectives and enhance overall efficiency.
  • Managed change for serial production and coordinated implementation of new parts to fulfill client demand and improve delivery timelines.
  • Create and coordinate the timing plans
  • Analyze engineering aspects, technology, resource needs and customer demand to plan and assess the feasibility of engineering projects.
  • Develop and maintain plant engineering standards
  • Coordinated with different departments to decide upon a particular strategy and engineering specifications for a project and ensure smooth execution
  • Directed and guided co-workers to carry out the projects in an organized manner so as to achieve the desired result within the predetermined time frame
  • Analyzed different designs and recommended the suitable one to the clients explaining them the benefits
  • Assisted in the hiring and appointment of new staff as per the duties and responsibilities required to complete the project
  • Documented the probable budget andd estimated costs related to a project an presented it to the clients

Program Engineering Leader

AEES POWER SYSTEMS
Beius
2009 - 2010
  • Executed the same responsibilities at Alcoa to ensure consistency in operations.

Program Engineering Leader

Alcoa Fujikura
Beius
2008 - 2009
  • Coordinated engineering team to achieve EHS compliance, enhancing workplace safety.
  • Developed bills of materials (BOM) and packaging instructions to support production efficiency.
  • Created timing plans to streamline project workflows, improving project delivery timelines.
  • Created production flow charts to enhance operational efficiency.
  • Implemented design change notices (DCN) into prints and managed associated costs.
  • Ordered new raw materials and equipment, ensuring timely availability.
  • Checked rework possibilities for obsolete finished products and provided instructions.
  • Supported prototype process and service production as needed.

Program Engineer

Alcoa Fujikura
Beius
2007 - 2008
  • Developed bill of materials based on client drawings.
  • Documented official changes and implemented updates in client drawings and system.
  • Generated new material orders in the system for production adjustments.
  • Ordered new assay and electrical modules according to client specifications.
  • Implemented new processes in serial production to enhance efficiency.
  • Coordinated with involved departments regarding model year changes.
  • Maintained effective communication with clients on new technical requirements.
  • Optimized material usage through strategic actions.

Manufacturing Engineer

ALCOA FUJIKURA
Beius
2006 - 2007
  • Developed and continuously updated work instructions in response to customer changes.
  • Created visual aids for assembly tables, ensuring regular updates per customer feedback.
  • Designed process visual aids, adapting them according to customer modifications.
  • Conducted time studies to enhance operational efficiency.
  • Established tools catalog for streamlined inventory management.
  • Performed capacity calculations to optimize resource allocation.
  • Implemented material control processes to support production activities.
  • Guided staff training initiatives within operational scope.

Education

Bachelor of Science - Chemistry

Aurel Vlaicu University
Arad
08-2003

Skills

  • Telematics applications
  • Embedded software development
  • Vehicle software configuration
  • Software release management
  • Diagnostic trouble analysis
  • Change management
  • Cross-functional collaboration

Certification

Alcoa Production System (APS)
Leoni Production System (LPS)
Synchronous Flow and Pull system Kaizen
FMEA
Alcoa Fujikura – “Leaders for tomorrow”
Team leading the way
APQP experience

Timeline

Design Release Engineer Software Application

Ford Motor Company
01.2015 - Current

Design Release Engineer

Sumitomo Electric Industries Ltd
03.2013 - 01.2015

Engineering Team Leader

Leoni Wiring Systems
2010 - 01.2012

Program Engineering Leader

AEES POWER SYSTEMS
2009 - 2010

Program Engineering Leader

Alcoa Fujikura
2008 - 2009

Program Engineer

Alcoa Fujikura
2007 - 2008

Manufacturing Engineer

ALCOA FUJIKURA
2006 - 2007

Bachelor of Science - Chemistry

Aurel Vlaicu University
Anca Tamas