Fabricate & Install 6"-30" Ladder Tray, Ground Level and Heights
Flex Instruments
Helped Mount J Boxes,Plc/Rio Panels,
Ran 3/4-3" Aluminum conduit
Helped tail-in cables to MCC's, PLC's, J-Boxes
Completed semi-skilled and skilled work under qualified supervision
Terminated Instruments such as PIT,LIT,TIT,SDV
Helped my journeymen Operate Man Lift,Scissor Lift & Fork lift to finish our daily production.
Grounding Drilling in ground rounds,grounding the rods with bare 4 AWG.
Ran Duct Banks 3/4-4" PVC & Rigid Conduit
Fab & Install pipe racks unistrut/Double strut
Verify for new revisions on updated prints
Fab & Installed Stub ups from duct banks
Ran Conduit Inside MCC's
Installed Buss Bars inside MCC's
Operate manlift & scissor lift
Started running plastic bond conduit underground 3/4" up to 4"
Run aluminum tray inside MCC, Install light fixtures,install power panels
3 Phase transformers, install MCC,working with bus bars,install 50 amp breakers on MCC up to 100Amp
Terminate on PLC, vibration panels,relay panels, MOV's instruments, instruments boxes
Helped terminate on 4160 switchgear doing stress cones on 750-5kv uni shield wire
Start stop switches, 480V 3 phase motors
Run aluminum conduit 3/4" up to 2"
Ran 6" up to 24" cable tray for Instruments,Low Voltage & High Voltage.
Ran PVC conduit for bare ground cable
Ran cable tray on bottom of MCC's
Terminate in control room on PLC panel, Bucket panels from 350 to 750
I was also doing temporary power installing 480V disconnects, 3phase transformers and single phase transformers, pull wire for temp power and terminate.
NCCER Industrial Electrician-#30750571
OSHA 10-Hour Construction Course