Engineered Flame Water Diverter Fluid System at SLC-4E, integrating water and nitrogen blowdown systems.
Collaborated with multidisciplinary teams to ensure successful project activation.
Developed Launch Complex 39A Helium Recharger, achieving a half reduction in helium supply costs.
Eliminated reliance on base supply for future starship launches through strategic design and construction.
Coordinated with Cape peers across various disciplines for project transition from design to activation.
Designed McGregor Raptor propellant LOX storage and transfer pumps to facilitate 100 weekly Raptor tests.
Enhanced propellant supply efficiency, enabling quicker turnaround between tests and reducing vendor delays.
Expanded storage capabilities to support increased testing frequency and mitigate supply risks.
Launch Engineer II - Fluid System
SpaceX
Vandenberg Village
12.2022 - 10.2024
Responsible Engineer fluid systems for Falcon launch pad, including helium, nitrogen, and RP-1 operations.
Served as Ground Controller during launch pad refurbishment and on launch day.
Led multiple reliability projects to enhance GSE system reliability and reduce refurbishing needs.
Contributed to rate improvement efforts extending beyond SLC-4E launch pad, focusing on fluid design and activation.
Oversaw upgrade of 398 Helium and Nitrogen Gas Farm for simultaneous booster checkout capabilities.
Designed and built payload fluid supply systems for enhanced operational efficiency.
Developed SLC-6 helium farm concept design for Falcon Heavy Pad.
Cryogenic Process Engineer
ExxonMobil
Kemmerer
02.2022 - 12.2022
Oversaw cryogenic processes for LNG and liquid helium production, maintaining optimal operational parameters through systematic controls.
Developed initiatives for process improvement, enhancing product recovery and resource efficiency in cryogenic operations.
Spearheaded emission reduction projects by modifying processes and upgrading equipment to align with environmental compliance goals.
Utilities / Project Engineer
ExxonMobil
Kemmerer
12.2021 - 08.2022
Oversaw execution of major capital projects, ensuring alignment with operational goals.
Conducted comprehensive analysis of hydrogen syngas unit, implementing improvements for reliability and efficiency.
Established advanced monitoring protocols for hydrogen syngas operations, addressing performance bottlenecks.
Managed daily troubleshooting for critical utilities systems, minimizing downtime and ensuring continuous operations.
Streamlined water treatment processes through optimization, enhancing resource utilization and lowering costs.
Developed maintenance protocols for instrument air systems, increasing equipment longevity and reducing emergencies.
Upstream Process Engineer
ExxonMobil
Houston
03.2021 - 12.2021
Conducted comprehensive analysis of post-combustion carbon capture systems to identify optimal parameters for CO2 removal efficiency.
Designed advanced refrigeration cycles for greenfield LNG facilities, utilizing sustainable technologies for operational reliability.
Developed detailed process flow diagrams and equipment specifications for blue hydrogen production, aligning with environmental standards.
Optimized utility systems design for LNG processing units, enhancing energy efficiency and reducing operational costs.
Collaborated with cross-functional teams to integrate carbon capture technologies into existing upstream processes, improving system performance.
Evaluated post-combustion capture technologies for blue hydrogen production, providing feasibility studies and technical recommendations for implementation.
Engineer in Operation
ExxonMobil
Houston
09.2020 - 03.2021
Field engineer at East Texas Oil and Gas Facilities.
Upstream Process Engineer Intern
ExxonMobil
Houston
07.2019 - 10.2019
LNG refrigeration integrated processes analysis and cost comparison.
Undergraduate Researcher
University of Wyoming
07.2018 - 07.2019
Test Administrator
Whatcom Community College
Bellingham
11.2015 - 10.2017
Physics Tutor
Whatcom Community College
Bellingham
11.2016 - 08.2017
Education
Bachelor of Science - BS - Chemical Engineering and Physics
University of Wyoming
Wyoming
03.2021
Associate of Science - AS - Chemical Engineering
Whatcom Community College
03.2018
Skills
Fluid dynamics
Engineering design
Cryogenic processes
System optimization
Project engineering
Process improvement
Project management
Cross-functional collaboration
Timeline
Senior Launch Engineer
SpaceX
10.2024 - Current
Launch Engineer II - Fluid System
SpaceX
12.2022 - 10.2024
Cryogenic Process Engineer
ExxonMobil
02.2022 - 12.2022
Utilities / Project Engineer
ExxonMobil
12.2021 - 08.2022
Upstream Process Engineer
ExxonMobil
03.2021 - 12.2021
Engineer in Operation
ExxonMobil
09.2020 - 03.2021
Upstream Process Engineer Intern
ExxonMobil
07.2019 - 10.2019
Undergraduate Researcher
University of Wyoming
07.2018 - 07.2019
Physics Tutor
Whatcom Community College
11.2016 - 08.2017
Test Administrator
Whatcom Community College
11.2015 - 10.2017
Bachelor of Science - BS - Chemical Engineering and Physics