Summary
Overview
Work History
Education
Skills
Timeline
Generic

Anthony Arduengo

Summary

Highly effective at keeping facilities running smoothly with skilled diagnostics, troubleshooting and problem-solving abilities. Organized, hardworking and proactive in correcting issues early. Excellent written and verbal communication skills.

Overview

8
8
years of professional experience

Work History

Facility Technician

Sarver Construction
01.2023 - Current
  • Responsible for administering all of the internal inspection and maintenance tasks on the maintenance schedule
  • Assisted in scheduling and preparing for large-scale facilities upgrades
  • Coordinated larger upgrade and repair projects with management to reduce disruption to guests as much as possible
  • Inspected Facilities and proactively detected and diagnosed potential or actual maintenance repair needs by listening, looking, and using precision measuring and testing instruments
  • Recorded facilities work in official logs and tracked and followed recommended maintenance schedules to keep the company operating smoothly and meeting customer needs.

Building Maintenance Technician

Marco Construction
03.2022 - 11.2022
  • Constructed, installed, maintained, and repaired roofs, walls, partitions, furniture, cabinets, shelving and related structures; replaced ceiling and floor tiles
  • Installed, repaired, and maintained doors, locks, closures, hinges, and other hardware
  • Performed basic plumbing repairs including repaired or replaced fixtures, valves and pipes
  • Repaired or replaced lights, electrical outlets, switches, circuit breakers, and lighting fixtures
  • Maintained routine records and reports related to work orders, labor and materials
  • Estimated and ordered materials and supplies required for maintenance and repair activities.

Foreman

Rtwyns Construction
02.2018 - 03.2022
  • Managed, supervised, and coordinated a team of 5 construction workers to ensure projects were completed within a timely manner
  • Worked with other workers on the construction site to ensure the company's high standards and clients' vision were fully met
  • Performed various duties, such as shoveling asphalt, placing and aligning components, leveling surfaces, stripping roofs, measuring and cutting shingles, handling construction materials and etc
  • Maintained various tools and equipment and cleaned construction sites - Installed, built and repaired doors, cabinets, shelves, windows, blinds and other areas as needed.

Painter/Construction Worker

R&R Specialties Painting
09.2015 - 02.2018
  • Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes
  • Performed repairs to defects in walls by patching holes and scrapes prior to project start
  • Covered floors before prepping, priming, and painting walls and ceilings to protect them from chemicals and paint
  • Assisted distribution of tools, materials, and equipment to skilled workers
  • Maintained baseline safety knowledge to identify areas requiring improvement to meet codes
  • Maintained a clean, safe working environment by removing waste from the job site prior to shift completion
  • Mixed paints and solutions and monitored for consistency
  • Used power and hand tools safely and effectively
  • Prepared sheetrock, metal, and wood surfaces for painting
  • Cleaned and smoothed all surfaces prior to painting
  • Prepared from start to finish staining any stainable products.

Education

High School Diploma -

Andrew Hill High School
San Jose, CA
2014

Skills

  • Preventive Maintenance
  • Painting Skills
  • Plumbing Knowledge
  • Equipment Maintenance
  • Workload Management
  • Punctual and Reliable
  • Teamwork and Collaboration
  • Facility Preventive Maintenance
  • Time Management
  • Walls and Surface Painting
  • Hazardous Materials Management
  • Attention to Detail
  • Carpentry and Structural Repairs
  • Sanitation Guidelines
  • Cleaning and Sanitizing

Timeline

Facility Technician

Sarver Construction
01.2023 - Current

Building Maintenance Technician

Marco Construction
03.2022 - 11.2022

Foreman

Rtwyns Construction
02.2018 - 03.2022

Painter/Construction Worker

R&R Specialties Painting
09.2015 - 02.2018

High School Diploma -

Andrew Hill High School
Anthony Arduengo