Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Anthony Duarte

Cedar Creek

Summary

Dynamic Lead Construction Laborer with a proven track record at Diaz Concrete Construction, excelling in safety compliance and equipment maintenance. Recognized for a positive attitude and expertise in concrete finishing, I consistently enhance project efficiency while ensuring a clean, safe work environment. Committed to delivering high-quality results in every task.

Overview

2
2
years of professional experience

Work History

Lead Construction Laborer

Diaz concrete construction
Austin
08.2023 - 02.2025
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Repaired existing structures when needed using appropriate tools and techniques.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Lubricated, cleaned or repaired machinery or equipment.
  • Used hand tools such as hammers, wrenches, levels for various jobsite tasks.
  • Inspected sites before and after construction projects.
  • Installed wood framing components such as rafters and wall studs according to plans.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Assembled structural components, replacing parts to meet regulatory code standards.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Tracked materials, supplies, and equipment used in the project.
  • Loaded and unloaded building materials from trucks using forklifts or cranes when necessary.
  • Operated power tools such as drills, saws, grinders, sanders to complete assigned tasks.
  • Supervised and coordinated activities of crew members on construction sites.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Assisted with the installation of foundations, walls, roofs, windows, doors, and other components of buildings.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Set forms for pouring concrete footings and foundations as directed by supervisor.
  • Collected garbage left behind by other workers at the end of each shift.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Performed a variety of tasks involving strenuous manual labor in construction projects.
  • Used laser measuring tools to calculate lengths, widths, and heights.
  • Removed old structures prior to beginning new construction projects.
  • Measured, marked or recorded openings or distances to construction layout areas.

Education

High School Diploma -

Cedar Creek High School
Cedar Creek, TX
05-2023

Skills

  • Construction safety
  • Machine operation
  • Site inspection
  • Equipment maintenance
  • Positive attitude
  • Concrete finishing
  • Landscaping basics
  • Heavy equipment operation
  • Formwork construction
  • Rebar installation
  • HVAC systems
  • Truck loading
  • Multitasking and organization
  • Carpentry
  • Dependability and reliability
  • Safety and compliance
  • Entry level mechanic

Languages

English
Native/ Bilingual
Spanish
Native/ Bilingual

Timeline

Lead Construction Laborer

Diaz concrete construction
08.2023 - 02.2025

High School Diploma -

Cedar Creek High School
Anthony Duarte