Experienced Project Coordinator with a background in managing complex projects across various industries. Possess strong leadership skills, adept at coordinating cross-functional teams and effectively communicating project goals to ensure seamless execution. Known for problem-solving abilities and strategic planning expertise to drive project success. Have contributed positively by improving workflow processes and meeting objectives on time in previous roles.
Overview
21
21
years of professional experience
Work History
Project Coordinator
English Construction INC.
Richmond, VA
01.2021 - Current
Provided technical advice regarding design, installation, repairs, maintenance and upgrades of various utility systems.
Verified accuracy of engineering drawings prior to commencement of construction project.
Documented violations and issued documentation such as stop work orders to contractors or owners.
Collaborated with contractors to ensure proper operation of all components within the system.
Reviewed permits, applications, and related records for each worksite.
Performed on-site evaluations of utility systems, including electrical, gas, water and wastewater infrastructure.
Conducted field tests to assess performance of equipment and materials used in construction projects.
Read and interpreted drawings and assessed construction against plans.
Participated in meetings with other stakeholders such as engineers, architects and local authorities concerning upcoming projects involving utilities systems.
Completed day-to-day duties accurately and efficiently.
Coordinated activities between multiple contractors working on the same project simultaneously.
Evaluated whether work was in accordance with all applicable city, state and federal guidelines, as well as applicable discipline-specific codes.
Conducted on-site inspections of all phases of construction, from foundation to completion.
Tested soil, asphalt and other materials to assess compliance with applicable building codes.
Irrigation Technician
Brooks Irrigation
Richmond, VA
04.2019 - 01.2021
Kept up-to-date with industry standards related to installation techniques or safety protocols.
Monitored water usage and adjusted the timer settings as necessary to conserve resources.
Installed and programmed clocks, timers and rain sensors to maintain proper irrigation levels and reduce water waste. parts.
Attended conferences or seminars related to advances in the field of irrigation technology.
Created detailed plans for new installations that included the layout of sprinkler heads and piping systems.
Performed inspections and made repairs on tractors.
Installed new irrigation systems in residential and commercial properties according to local codes and regulations.
Installed irrigation systems and tested components to demonstrate proper functionality.
Inspected sprinkler heads, valves, and pipes for proper functioning and identified any problems or needed repairs.
Verified proper installation of irrigation systems for residential and commercial customers.
Supervisor
The Brickman Group Ltd.
Ashland, VA
08.2016 - 04.2019
Managed scheduling for staff, ensuring adequate coverage during peak times and projects.
Led weekly team meetings to discuss progress, address issues, and plan future actions.
Coordinated with other department supervisors to ensure smooth workflow and project alignment.
Oversaw inventory management, ensuring adequate stock levels and reducing waste.
Monitored employee productivity levels on a regular basis to identify areas of improvement.
Directed and supervised team of 15 employees in daily operations.
Trained new employees on company policies, job duties, and performance expectations.
Utilized document management system to organize company files, keeping up-to-date and easily accessible data.
Superintendent
Birkdale Golf Club
Chesterfield, VA
05.2004 - 07.2016
Oversaw workforce involving subcontractors and laborers during project executions.
Managed projects by coordinating materials, inspections and contractor tasks.
Maintained accurate records such as daily logs, time sheets, inspection reports, for each project.
Conducted regular meetings with contractors, subcontractors, laborers to review progress and address any issues, concerns.
Communicated effectively with clients regarding project status updates, budgeting concerns and timeline adjustments.
Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
Monitored equipment operation during extraction process to detect problems.
Assisted in preparing bids for new projects by analyzing blueprints, specifications and other documentation related to the project.
Oversaw complete construction process to maximize quality, cost controls and efficiency.
Education
Associate of Science - Criminal Justice
ECPI University
Virginia Beach, VA
12-2005
Skills
Specification detailing
Budget coordination
Virtualization
Spreadsheet tracking
Forecasting
Performance monitoring
Material testing
Product inspection
Specifications reading
Safety procedures
Report development
Cost control
Project recordkeeping
Attention to detail
Education and Training
other
Timeline
Project Coordinator
English Construction INC.
01.2021 - Current
Irrigation Technician
Brooks Irrigation
04.2019 - 01.2021
Supervisor
The Brickman Group Ltd.
08.2016 - 04.2019
Superintendent
Birkdale Golf Club
05.2004 - 07.2016
Associate of Science - Criminal Justice
ECPI University
Similar Profiles
Kenneth BlaylockKenneth Blaylock
Intern at English ConstructionIntern at English Construction