Transportation Intern
- Supported roadway design documentation for the US 380 corridor improvement project in Frisco and Princeton, Texas
- Prepared and updated plan, profile, and layout sheets using MicroStation, including alignment, stationing, and curve data
- Reviewed and incorporated quality control comments in coordination with project engineers
- Verified roadway geometry, annotation accuracy, and plan readability to meet project and TxDOT standards
- Assisted with drainage and roadway feature documentation, including culverts, guardrails, and storm drainage elements
- Reviewed and validated geotechnical bore log information and maintained revision tracking using Excel
- Organized and managed ProjectWise files to ensure accurate, consistent, and traceable design documents
