Scaffolding set up an Hod Tending
Kevin Bailey Masonry
Ogden Utah
08 2025 - Current
- Successfully navigated challenging terrain when transporting materials, ensuring minimal delays in project progress.
- Reduced downtime by consistently monitoring stock levels and proactively restocking as needed.
- Maximized productivity by properly stacking bricks or blocks near the work area for easy access by masons.
- Ensured accurate measurements of materials for mixing mortar, resulting in consistent quality across projects.
- Demonstrated versatility in supporting various types of masonry jobs, including bricklaying, blockwork, stonework, and more.
- Cleaned and maintained tools, equipment and worksites.
- Loaded and unloaded materials and equipment onto and off construction sites.
