Nccer Pipefitter with 6 years of field experience. Experience in refineries, power plants, new constructions.,
Laid out 2-8” lines on roof for efficient piping system
Installed new valve stations to enhance system control
Measured and aligned field components to complete tie ends for freezer installation
Prefabricated 6-16” pipe spools for an emergency job
Layout new 4-18” carbon steel lines
Designed layout for 4-18” carbon steel lines
Created supports for new production lines
Replaced existing valves with new butterfly valves
Demonstrated removal of old 2” heater tubes from equipment
Installed new 2” heater tubes, ensuring proper fit and function
Prefabricated pipe spools based on verified field measurements
Fabricated and installed piping spools in accordance with project specifications
Conducted repairs on 2-inch boiler tube leaks to ensure efficient operation.
Installed prefabricated piping spools from 2”-10”
Performed pneumatic test to sell off finished lines
Replaced old valves with new butterfly valves
Dismantled old 2” line and constructed new line to enhance system reliability
Added new fittings to existing pipe
Installed new fittings on existing piping systems
Laid underground gas piping according to safety standards.
Cut various pipe sizes and lengths for precise installation fit.
Measured field dimensions to fabricate piping spools
Installed pipe supports to ensure stability during installation
Cut openings in walls and floors to accommodate pipe and pipe fittings.
Installed piping spools to ensure proper system functionality
Laid out new stainless pipe for gas farm unit at CF Verdigris, ensuring proper alignment and fit for optimal performance.
Handled all responsibilities for piping systems, including fabricating, assembling, and installing
Removed outdated heater tubes, and installed new ones 6” carbon
Installed structural supports for pipes to keep them in place during installation process.
Replaced 18 exchangers
Demo’d down a structure and rebuilt a new one..Replaced expansion joints
Replace bundles.., Demo’d out 2-6 inch pipe.., Hung new Pipe.., Replaced a lot of valves..Hydro’d a bunch of pipe
Took out old PSV’s and replaced new ones. Replaced bolts and gaskets to repair leaks.