Summary
Overview
Work History
Education
Skills
Timeline
Generic

Brandon Klaus

Birdsboro ,PA

Summary

Versatile in operating heavy machinery and enhancing safety, I excelled at Brubacher Excavating by optimizing pipe installation and fostering positive team dynamics. My proactive input and adherence to OSHA standards at Rota-mill Inc significantly improved project efficiency and quality, showcasing my expertise in equipment handling and collaborative skills.

Overview

6
6
years of professional experience

Work History

Pipe Layer

Brubacher Excavating
04.2024 - Current
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.

Operator/ Laborer

D&L Construction
11.2021 - 03.2024
  • Operated various types of machinery, demonstrating versatility and adaptability in diverse work environments.
  • Maintained a safe working environment by enforcing strict adherence to safety guidelines and protocols.
  • Worked outside in all weather conditions.
  • Increased overall product quality through meticulous attention to detail during operation processes.

Skid Steer Operator

Rota-mill Inc
08.2018 - 10.2021
  • Provided valuable input during project planning phases to ensure optimal utilization of skid steer equipment capabilities.
  • Upheld strict adherence to OSHA safety regulations while operating heavy machinery in diverse work environments.
  • Maximized fuel efficiency in skid steer operations by optimizing machine usage patterns and adhering to manufacturer guidelines.
  • Completed projects in a timely manner with precise execution of excavation, grading, and leveling tasks.

Education

Twin Valley Highschool
Elverson, PA
2013

Skills

  • Equipment and tools
  • Storm drain piping
  • Safety meetings
  • Pipe joining
  • Pipe installation
  • Positive working relationships
  • Pressure testing
  • Pipe cutting
  • Valve installation
  • Water and sewer piping
  • Heavy Lifting
  • Grade checking
  • Truck loading

Timeline

Pipe Layer

Brubacher Excavating
04.2024 - Current

Operator/ Laborer

D&L Construction
11.2021 - 03.2024

Skid Steer Operator

Rota-mill Inc
08.2018 - 10.2021

Twin Valley Highschool
Brandon Klaus