Manage software releases and implement baselines for testing/installation to support a successful Positive Train Control project
Ensure the construction sites have available the current & configured design documents to mitigate risk of a catastrophic event at the nuclear site.
Finalize design for piping penetrations in support of construction schedule.
Perform piping and fatigue analysis to qualify the process piping being used in construction.
Perform finite element analysis to populate the input to be used for piping design
Seeking a job opportunity to utilize my experience in Management and Project Engineering and further my skills working with multi-functional teams
* Team Collaboration * Documentation and Reporting * Data Compiling and Analysis
* Completed SQL Training * Qualified to sit for PE Exam * KPI Metrics and Report Creation
* Awarded multiple PowerUp Recognition Awards * ANSYS – Certified ANSYS training May 2010
* Apparent Cause Investigator (ACI) – July 2008 * George Westinghouse Signature Award – September 2008
* Engineer In Training (EIT) – October 2007 * MS Word, Excel, Powerpoint, Data Mining/Analysis
* Navisworks, UNIX, PipeStress, PSFATSTR
*Smart Plant Foundation®, Electronic Data Management Systems (EDMS)