Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Bryan Gerrick

Brazoria,TX

Summary

Dynamic Piping General Foreman at Bechtel with proven expertise in workforce planning and material procurement. Achieved timely project completions through strategic resource allocation and rigorous quality control, significantly reducing rework. Adept at collaborating with engineers to design efficient piping systems while fostering a safety-first culture on-site.

Overview

12
12
years of professional experience
1
1
Certification

Work History

Piping General Foreman

Bechtel
03.2024 - Current
  • Optimized crew productivity through strategic labor allocation based on individual skill sets and task requirements.
  • Achieved timely completion of projects by coordinating with other departments for resource allocation and scheduling.
  • Assisted with the development of standard operating procedures for the piping department, promoting consistency across projects.
  • Implemented rigorous quality control measures to identify potential issues early in the construction process, reducing costly rework and delays.
  • Partnered with other foremen to oversee site-wide activities, ensuring a cohesive approach to project management and overall success.

Piping Foreman

Bay Ltd.
03.2022 - 03.2024
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Completed daily logs and progress reports.
  • Reduced downtime on job sites by ensuring proper materials and equipment were readily available for the team.
  • Provided valuable input during pre-construction meetings that helped optimize plans and accelerate project timelines.
  • Collaborated with engineers on the design of piping systems to maximize efficiency and minimize safety risks during construction phases.

Piping Foreman

Trade Construction Co
04.2019 - 03.2022
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Completed daily logs and progress reports.
  • Reduced downtime on job sites by ensuring proper materials and equipment were readily available for the team.
  • Provided valuable input during pre-construction meetings that helped optimize plans and accelerate project timelines.
  • Collaborated with engineers on the design of piping systems to maximize efficiency and minimize safety risks during construction phases.

Piping Foreman

McDermott
02.2016 - 04.2019
  • Improved project timelines by accurately estimating labor hours needed for each task and assigning appropriate resources accordingly.
  • Minimized production delays by proactively addressing potential issues related to pipe alignment or support structures before they impacted the schedule.
  • Successfully met or exceeded project deadlines consistently by prioritizing tasks based on urgency and resource availability.
  • Collaborated with engineers on the design of piping systems to maximize efficiency and minimize safety risks during construction phases.

Piping Foreman

Keiwit
07.2013 - 02.2016
  • Reduced downtime on job sites by ensuring proper materials and equipment were readily available for the team.
  • Provided valuable input during pre-construction meetings that helped optimize plans and accelerate project timelines.
  • Collaborated with engineers on the design of piping systems to maximize efficiency and minimize safety risks during construction phases.
  • Improved project timelines by accurately estimating labor hours needed for each task and assigning appropriate resources accordingly.
  • Successfully met or exceeded project deadlines consistently by prioritizing tasks based on urgency and resource availability.

Education

High School Diploma -

Columbia High
West Columbia, Tx
05-1998

Skills

  • Material procurement
  • Job scheduling
  • Workforce planning
  • Pipe system design
  • Field supervision
  • Pipe fabrication
  • Piping layouts
  • Documentation review
  • Blueprint interpretation
  • Problem-solving
  • Multitasking Abilities
  • Construction safety

Certification

NCCER # 2629775

Construction Site Safety Supervisor

Construction Site Safety Tech

Supervisor

Industrial Pipefitter Knowledge and Performance

Timeline

Piping General Foreman

Bechtel
03.2024 - Current

Piping Foreman

Bay Ltd.
03.2022 - 03.2024

Piping Foreman

Trade Construction Co
04.2019 - 03.2022

Piping Foreman

McDermott
02.2016 - 04.2019

Piping Foreman

Keiwit
07.2013 - 02.2016

High School Diploma -

Columbia High
Bryan Gerrick