Results-driven piping leader with 32 years of experience directing crews, coordinating with contractors, and managing daily work plans. Skilled in isometric reading, material procurement, and inspection coordination. Focused on safety compliance, schedule alignment, and high-quality field installation.
Work History
Piping General Foreman
9 Years 1 Month
Premier Mechanical | 09.2017 - Current
Directed piping crews through daily work plans, balancing manpower, materials, and project priorities.
Coordinated with superintendents, contractors, and trades to maintain schedule alignment and jobsite flow.
Interpreted isometric drawings, spool sheets, and specifications to guide accurate field installation.
Enforced safety procedures, permitting requirements, and housekeeping standards across active work areas.
General Foreman
2 Years
Atomatic Mechanical Services | 03.2015 - 03.2017
Coordinated daily labor assignments, material staging, and site readiness for scheduled work.
Supervised field crews during mechanical installations, maintaining workflow and workmanship standards.
Interpreted drawings and specifications to guide accurate mechanical layout and installation.
Enforced safety procedures and corrected hazards to maintain compliant jobsite conditions.
Foreman
1 Year 1 Month
GRAYCOR | 02.2015 - 03.2016
Monitored quality of work, corrected deficiencies, and verified installations met job standards.
Managed equipment and material staging to improve crew efficiency and jobsite organization.
Trained crew members on equipment use, rigging practices, and task sequencing.
Communicated with project managers, supervisors, and subcontractors to remove delays and clarify priorities.
Foreman
2 Years 10 Months
BMWC CONSTRUCTORS INC | 05.2011 - 03.2014
Supervised craft crews to align field work with project plans, drawings, and schedule requirements.
Coordinated daily assignments, manpower, and material readiness to maintain workflow continuity.
Reviewed blueprints and specifications to resolve field conditions and support accurate installation.
Enforced safety procedures, jobsite housekeeping, and permit compliance across active work areas.
Pipefitter Superintendent
17 Years 3 Months
Total Mechanical | 01.1994 - 04.2011
Installed, assembled, and fitted steel, copper, and PVC piping for mechanical systems.
Aligned piping components and secured hangers, supports, and anchors to code standards.
Interpreted blueprints and isometric drawings to layout piping systems accurately.
Measured, cut, threaded, and bent pipe using hand tools and power equipment.
Diagnosed piping issues and completed repairs to restore system performance and reliability.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
Installed new systems and connected piping to existing components by welding, bolting and threading.
Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.
Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality.
Contributed to overall company success by maintaining a strong work ethic, adaptability, and commitment to delivering exceptional service on all projects undertaken.
Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
Optimized material usage by accurately measuring and calculating required materials for each project, minimizing waste.
Increased efficiency by collaborating with team members to install, assemble and repair piping systems in various construction projects.
Supported fellow team members in their tasks, fostering a collaborative work environment that prioritized both safety and efficiency.
Assisted in achieving project deadlines through effective organization of work assignments and prioritization of tasks based on urgency.