Finley Fine Jewelry (Orange, CT), 1995.
- Warehouse expansion.
- Site work for the underground vault.
- New utilities, such as gas, sewer, drainage, and power.
Belle Haven Club (Greenwich, CT), 1996 to present.
- Moved and raised the main club to the new FEMA elevation. Drove pile caps and new foundation for new elevation.
- Installed all new utilities, such as electric, sewer, water main, fire, gas, and a complete site drainage system.
- New tennis building and boathouse complete site development. Pile caps, foundation, utilities, etc.
- Yearly beach erosion control, grading, and sand replacement. Emergency restoration of the beach following Hurricane Sandy.
Belle Haven Land Company (Greenwich, CT), 1996 to present.
- Installed new drainage, granite curbing, concrete sidewalks, and aprons throughout the entire residential community.
- Emergency water main repairs, as needed.
- Relocate the sewer force main in the town of Greenwich.
- Yearly concrete sidewalk removal and replacement.
- Yearly drainage repairs and additions.
- Yearly, mill and pave roadways.
BelleFaire Residential Community (Rye Brook, NY), 2010.
- Remove and replace the village green roadway.
- Complete new curbing, concrete work, and blacktop.
Readers Digest / Chappaqua Crossing (Chappaqua, NY) 1994 to present.
- I have held the snow removal contract from 1994 to the present.
- Yearly repaving of roadways and parking lots
- New underground utilities, such as water main, electric, primaries, secondaries, and sewer.
- Installed backflow prevention, a new meter vault, and new water mains for building feeds.
- Emergency service contractor for immediate and necessary repairs.
Summit Development (Westport, CT), 2016.
- Under contract as the general contractor for a new retail development site.
- Complete demolition of the Chevrolet dealership.
- Complete site work and building foundations for Texas Roadhouse, Popeyes, Aspen Dental, and the retail strip mall.
- Complete CT DOT road work, including water main, sewer main, drainage, parking lots, and mass rock excavation.
- Crush and screen all material for on-site use.
- Coordination of all subcontractors.
RCN (Queens, NY), 2005.
- Underground fiber optics installation and vaults.
Bridge Street Properties (Irvington, NY) 2004 to 2018.
- Remove and replace box culverts feeding the Hudson River.
- Demolition of existing buildings.
- Complete site work for new buildings.
- Install a new sheet pile shoreline along the Hudson River.
Connecticut DOT.
- Remove and replace drainpipes and basins prior to state repaving of roadways (Canaan, CT), 5 months in 2024.
- Emergency road washout. Establish a new road that was taken out by the river in the storm (Southbury, CT) 2 months in 2024.
- Complete new drainage installations to fix flooding on Main St., Danbury, CT, 3 months in 2023.
Snow Removal Contracts.
- Westchester Medical Center (Valhalla, NY), 5 years.
- IBM Watson (Yorktown, NY) 2 years.
- IBM (North Castle NY) 4 years
- Reader's Digest (Chappaqua, NY) 31 years.
- Raymour & Flanigan Warehouse and Maintenance Facility (Suffern, NY) 3 years.