Demonstrates strong analytical, communication, and teamwork skills, with proven ability to quickly adapt to new environments. Eager to contribute to team success and further develop professional skills. Brings positive attitude and commitment to continuous learning and growth.
Work History
Construction Foreman
3 Years 9 Months
High Rollers | 12.2022 - Current
Supervised daily operations and ensured adherence to safety protocols on construction site.
Coordinated subcontractor schedules to optimize project timelines and resource allocation.
Conducted regular inspections to maintain quality standards and compliance with regulations.
Install 6 inch flowlines from wellhead to facility
Set separators; dress them out, install dump lines, blow down lines, liquid level controllers, sight glasses, dump valves ect..
Dress produced water tanks, installed load lines, ran dump lines and blow down lines from separators to tanks installed vent lines to flair stacks.
Set flair to burn off gas
Supervised field crews to maximize quality and work efficiency.
Coordinated materials to maintain steady flow and meet productivity objectives.
Field Supervisor
1 Year 2 Months
Enersol | 10.2021 - 12.2022
Supervised field operations to ensure compliance with safety regulations and company standards.
Coordinated project timelines and resources to optimize workflow efficiency across multiple job sites.
Trained and mentored junior staff in operational procedures, promoting knowledge retention and skill development.
Conducted site inspections to identify potential issues, implementing corrective actions to enhance performance.
Rigged up layflat from pit to frac location, and rigged in pumps.
Pipeline Laborer
1 Year 4 Months
TCI Construction | 06.2020 - 10.2021
Operated heavy machinery for excavation, grading, and trenching tasks to facilitate pipeline installation.
Collaborated with team members to ensure adherence to safety protocols and operational guidelines.
Assisted in the assembly and installation of pipeline components, ensuring proper alignment and integrity.
Monitored job site conditions and reported any hazards or issues to maintain a safe working environment.
Conducted routine inspections of tools and equipment, performing basic maintenance to ensure optimal performance.
Trained new laborers on safety procedures, equipment use, and best practices for pipeline construction tasks.
Polly/Flowback Operator
1 Year
Price Petro | 06.2019 - 06.2020
Operated flowback equipment to ensure efficient and safe site operations.
Monitored pressure levels and fluid flow rates, adjusting parameters as needed.
Collaborated with team members to optimize flowback processes and minimize downtime.
Conducted routine maintenance on equipment, enhancing operational reliability.
Supervisor
9 Months
Mulholland Energy Services | 08.2018 - 05.2019
Supervised daily operations, ensuring compliance with safety regulations and company policies.
Trained and mentored team members to enhance performance and maintain high service standards.
Managed inventory levels, coordinating with suppliers to ensure timely availability of materials.
Conducted performance evaluations, providing constructive feedback to support employee development.
Oversaw daily operations of the department, ensuring smooth workflow and timely completion of tasks.
Polly/Flowback Supervisor
1 Year 6 Months
Price Petro | 01.2017 - 07.2018
Supervised flowback operations, ensuring compliance with safety protocols and operational standards.
Coordinated equipment setup and maintenance for optimal performance during flowback processes.
Implemented process improvements that enhanced efficiency and reduced downtime during flowback activities.
Welder's Helper
10 Months
Capco Pipeline Contractors | 03.2016 - 01.2017
Assisted welders in preparing materials and tools for pipeline installation projects.
Maintained a clean and organized workspace to ensure safety compliance and efficiency.
Supported welding processes by handling equipment and ensuring readiness for operations.
Collaborated with team members to troubleshoot welding issues and implement solutions.
Monitored welding quality, ensuring adherence to industry standards and specifications.
Crew Pusher
1 Year 10 Months
C&C Service | 05.2014 - 03.2016
Planned pipe system layout, installation, or repair according to specifications.
Reviewed blueprints, building codes or specifications to determine work details or procedures.
Engaged in pipe cutting, preassembly and installation of the battery system.
Inspected, examined and tested installed systems and pipe lines, using pressure gauge, hydrostatic methods