
Motivated professional experienced in customer service and time management. Delivered positive and memorable experiences through strong work ethic and adaptability. Thrived in unsupervised environments while quickly mastering new skills.
Executed automated assembly of Optiseal valve and cap to ensure quality standards.
Optiseal introducer kit assembly
Operated introducer device to facilitate procedures.
Molding, Optiseal sheath handle (newbury) NB4
Sheath handle dilator hub molding (newbury)NB3
Manual Dilator Rotating Collar assembly
Flush port assembly for optiseal sheath and flushport bonding curing setup optiseal.
Optiseal flare, trim, punch, and pre-slit moisture analyzer. Testing and resin drying automated RF thermoformer
RF thermoforming (cath-tip)
Optiseal sheath cleaning process
Performed tray sealing with Alloyd Aergo 2 lid sealer for secure packaging.
Packaging silicon room.
Biotrinok line
Skiving proximal and distal lumen tubing
Cutting cables and installation crimp tubes
Crimp it and weld on the laser welding machine connect with contact ring.
Loading heat shrink on both sides Distal and proximal
Measure on the fixture heat its
Loading into Slid oven
When out from oven inspected all cables.
Stringing cable into lumen tubing
Measure the ring with fixture
Check the pattern make sure it right.
Glue the proximal side with (MA)
Let it dry and put into big oven for unealing setup timer for 2 hrs.
When out from oven inspected
Distal clip and strips
Installation crimp tubes
Crimp it and trim extra coils off
Insert electrol over crimp tube
Measure with fixture
Pull test 1 every 5 parts
2 pull test at the beginning 2 at the end
Distal laser welding on the laser weld machine
Setup machine try welding first 2 cables to pull test
make sure pass
then loading the real part to weld
loading the part on the fixture
Load into machine weld it
Every 5 parts do 1 pull test and 2 after when lot done
Do meter check to make sure all pass it
Distal glue with (MA) to all rings
When done let dry and out into big oven
Setup timer for 10 hrs
Molding distal, proximal, and tip
Reflow distal and proximal side on the reflow machine
Grinding distal, proximsl, measure ring and plastic tubes
Wash with comical water and (IPA) alcohol
Measure 3 parts on the meter machine
Final inspection
Bend test, (CT) bend check type number in computer
Hipott tester parts
Mendral checks
Fixture check distal and proximal sides
Laser (OD) check on the laser micrometer
X-ray
Setup machine
Insert part into X-ray machine
Inspected part make sure no mental, bend, expore wire or cables
Type number in computer how many parts
Visual
Inspection bubbles, scratches, (FM),
Upset, mental, and etc.
If all good ready to packaging
Found any bad part reject it write down the code, the date and initial the person who check the part.
Flexcommender
*Work flexcomender line for 4 years.
Tied both ends of the liner securely during assembly.
Loaded braid, stretched tight, measured, and trimmed for precise assembly.
Tied both ends of the stretching liner effectively.
*Put pebox both end braid heat it to hold tight.
*Loading heatshrink over pork 2 holes
Slid 2 cables out from the holes
*Heat the distal side and put in the oven
*When it out from oven skive heat shrink off..
*Check or inspect FM scratch and rework
*Use machine pull cables out
*Next step work on distal tip
Used machines to pull out the big mandrel from the distal tip
*Cut to length and (QC) inspection.
Cryo cate Frex line
*Gained 3 years of experience on the Cryol Cate line.
*I use machine to stretching liner tie both ends
*It glued 2 cables to with the big mandrel
*I loading braid and stretching tight
*Measure distal end and heater a box to hold
*Loading tubing body and heat shrink over pork a hold on proximal side about 1 inch
*Slide the end cables out from the holes
Heated the distal end and placed it in the reflow machine for processing.
*When reflows machine reflow the top all the way to bottom
*I open door and take the parts out
Skived heat shrink and inspected under microscope for quality assurance.
*I connect a solid 35D tubing and 25D tubing
*I put in the distal reflow oven machine
*I set up time about 1 1/2 mins
*When the time over i take out the parts out
Skived the heat shrink material to prepare the component for inspection.
*I tipping the distal end on the tipping machine
*I rework from the tip to the 35D part
*I measure and final inspect with the flexture.
*It is all done i packaging.
Seimen Line
*I work on seimen line assembly for 3 years.
*I stretched the liner to ensure proper fit during assembly.
*I put 4 wires to go with the big mandrel
*loading braid and stretching tight
*I loading tubing body,75D,35D, and 25D
*I loading heat shrink over i heat on the top distal end
*I placed parts in the oven for a setup time of 4 minutes.
*I retrieved parts from the oven after the heating cycle.
*I skive heat shrink off
*Check under microscope any scratch or braid out
*I pull the 4 wires and big mandrel out
*I cut or trims both ends
*I counted 10 parts and placed them in a bag for packaging.
*It ready for (QC) inspection
Cook Line.
*I worked cook line assembly for 2 years.
*I stretching liner tie both ends
*I loading coils over the part and pich coil
*I measure lengh coil with the ruler
Loading heat shrink cover
*I heat 1 end i hanging the parts on the rack
*I put into oven set up time 4mins
*I take out heat shrink and check under microscope
*I roll cut with the roll cutter
Drive Shaft line tape# 1
*I worked drive shaft line assembly for 2 years.
*I loading into small heat shrink
*I loading into big heatshrink
*I heat 1 end of the parts
*I hinging on the rack
*When come out from oven
*I skive heat shrink off
*I inspect the parts under the microscope
*I glue a tube on distal end
*I clean the glue on the tip nicely
*I try to pull testing make sure all tubes good and don't come out
*I count the parts 10 pieces in 1 bag
*1 lot about 40 parts
*I completed packaging and prepared items for final quality control inspection.
Drive Shalf tape# 2
*I cleaned the table and parts using a 70/30 solution for sanitation.
*I blow with air gun make sure it is dry
*I loading part into small heat shrink
*I measure proximal end about 1 1/2 inch
*Loading a soft heat shrink over the spot that i measure and heat on heat gun
*I removed the soft heat shrink after the heating process.
*I measure 2nd time make sure length still the same
*Loading big heat shrink over
*I heat distal end make sure doesn't fall off
*I put into the oven set up time 4mins
*When come out from oven
*I skive heat shrink off
*I inspect under microscope
*If any scratches i need rework
*It is good i install tubes on distal side
*I glue it let it dry
*I clean the parts and glue
*I count parts put into bags
*It is ready for (QC) inspection.
*Completed