Summary
Overview
Work History
Education
Skills
Certification
Timeline
Additional Information
Generic

Christopher Long

Spirit Lake,USA

Summary

Experienced technician with over 10 years of experience spanning industrial construction, mechanical maintenance, heavy equipment repair, home automation, low-voltage systems, and network infrastructure. Proven ability to diagnose complex mechanical and technical issues, lead crews, manage projects, and deliver high-quality installations while maintaining strict Quality and Performance standards. Skilled in Control4 programming, Lutron systems, network deployment, equipment troubleshooting, and industrial machinery maintenance. Recognized for strong work ethic, rapid learning ability, and commitment to continuous improvement.

Fun Fact: A single 4x4 LEGO brick can support 375,000 other LEGO bricks before it crushes

Overview

12
12
years of professional experience
1
1
Certification

Work History

Equipment Technician

Herc Rentals
Post Falls, ID
10.2024 - Current

Key Duties

  • Diagnosed mechanical issues using diagnostic tools and troubleshooting techniques
  • Performed routine maintenance and repairs on heavy equipment, including excavators, bulldozers, and loaders
  • Conducted regular inspections to identify potential problems and prevent breakdowns
  • Maintained accurate records of all maintenance activities, including repairs performed and parts used
  • Followed safety protocols and guidelines to minimize accidents and injuries in the workplace

Achievements

  • Demonstrated exceptional problem-solving skills and Implement new ways of repairing and diagnosing equipment and common issues.
  • Implemented a new quick check-list to address most common issues.
  • Increased Equipment ready-to-rent rate by 90% maintaining 10% in Queue for repairs and inspections

Installation/Equipment Manager

Technology Design Associates
Priest River, ID
08.2021 - 10.2024

Technology Design Associates |

  • Installed and programmed custom smart-home automation systems utilizing Control4 and Lutron platforms.
  • Designed, deployed, and commissioned residential network infrastructure, including managed switches, wireless access points, routers, and VLAN segmentation.
  • Installed and configured security systems including cameras, NVRs, smart locks, motion sensors, and access-control devices.
  • Built and organized equipment racks, terminated low-voltage cabling, and documented network configurations.
  • Programmed centralized lighting, multi-room audio, video distribution, and automation routines.
  • Managed project materials, inventory tracking, RMA processing, and equipment procurement.
  • Coordinated project schedules, customer communication, and installation timelines.
  • Maintained detailed project documentation, network addressing schemes, and system commissioning records.
  • Conducted safety meetings and ensured OSHA-compliant work practices.
  • Managed and deliver remote support for end-user issues. system issues and bugs.

Achievements

  • Acquired multiple certifications for home automation equipment and broadened my knowledge of I.T.
  • Successfully helped design, installed and commissioned 8 smart home automation systems.
  • Completed my biggest project-to-date involving 5 buildings, 42 cameras, 280 IP devices. 18 MOIP'S and multiple other Systems.

Generator Technician

Northwest Generators
Hayden, ID
10.2020 - 08.2021
  • Inspect & Repair customers Gas/Diesel powered generators, ranging from small home portables to commercial/ industrial size.
  • Carried out inspections on over 20 small and large capacity generators weekly.
  • Recorded repairs required, parts used and labor time.
  • Developed test plans and procedures for evaluating tool quality and functionality.
  • Use knowledge and experience to safely complete the task at hand in a timely and cost effective manner
  • Complete Engine Overhauls if Applicable or Cost Effective to business and consumer
  • Followed-up with clients to ensure proper functionality of their equipment post repair.
  • Maintained punctual part management with ability to keep inventories up to date.
  • Assisted in training new technicians on safety Procedures and equipment handling procedures.

Ironworker/millwright (lead)

S&R Enterprises, LLC
Cocoa, FL
09.2019 - 10.2020
  • Read blueprints, prepare erection plan, stage all required material , prepare steel to be erected
  • Work with crane operators to rig, fly, and erect steel to specifications
  • Assign Bolt-Up crews to bolt-up all steel connection points, Ensure proper Racking of structure before final Torque is
  • Weld Gussets, Plates, Beams, Structural equipment. ensure proper WPS Procedures are kept, handoff to Welding inspector for approval/sign-off
  • Welding Multiple assemblies, Bracing, Structural pieces. Mild Steel / Stainless Steel

Millwright Role

  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.

Lead Role

  • Morning meetings with crew of 12. Involves safety talks, crew concerns, questions for day.
  • Whiteboard meeting with days requirements and list of projects to be complete
  • Secure all RFI's Submit to Engineers, acquire corrective measures to Proceed with task at hand.
  • Layout for equipment to be installed on Rocket Launch Pad, Fit up Plates/Beams/Equipment to tolerances given. Hand off to Dedicated welders to be welded.

KEY-PROJECTS

1. Blue Origin - Rocket Launchpad

  • Erection of Lightning tower and Vehicle Assembly tower
  • Erection of rocket launch pad ( 2 - stages bottom portion and top )
  • Equipment Installation of all mechanical,pneumatic,hydraulic systems. to be used to transport rockets, as well as Lift to Take-off Stage.
  • Commissioning and testing of all installed equipment. troubleshooting and repairing sections as needed.

Millwright Journeyman

A-Lert Construction Services
Fredonia, KS
01.2019 - 09.2019

Millwright Role

  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Made repairs and modified equipment by welding, to avoid production delays by 15% on average.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear. this helps R&R time by 30% on average.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.

Lead Role

  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Shrunk knowledge gaps with ongoing training and close employee mentoring for new and less experienced team members.

Equipment Involved

  • Conveyors
  • Dust Collection Systems
  • Vertical Conveyors
  • Food Processing Equipment
  • Compressor stations
  • Bag Houses
  • Drag Chains

Millwright/Welder

WPS
Grayling, MI
06.2018 - 12.2018

Millwright Role

  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Made repairs and modified equipment by welding, to avoid production delays.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Used Transits and Other Measuring equipment to layout proper Scribed Lines on concrete for equipment installs to 1-2% variation tolerance.

Lead Role

  • Reviewed and studied blueprints to double-check installation and implementation project requirements.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Evaluated new inexperienced employees, trained them in areas needing improvement.
  • Establishing safety meetings for crew in morning, covering all hazards for job at hand.
  • KEY-PROJECT -ARAUCO - Largest Particleboard plant in the U.S.

Ironworker/Rigger

CCC Group
All-states
12.2016 - 07.2017
  • Ironworker/Millwright Role
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Modified equipment by welding, to avoid production delays.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Hoisted metal components into place, safely operating cranes during process.
  • Prioritized safety across job site with specific attention to load suspension, welding, and cutting.
  • Erected structural steel and iron frameworks for bridges, buildings and other structures.
  • Coordinated with crane or signaled equipment operators to lift and position structural steel members and hoist beams, girders, and columns to correct positions.
  • Equipment Involves .
  • Conveyors
  • Dust Collection Systems
  • Compressor systems
  • Electric Motors
  • Overhead Cranes
  • Ironworker/Millwright Role

Welder

Integra beam
Sandpoint, ID
08.2016 - 11.2016
  • Received Blueprints of type of track to be constructed, Sort needed material out to be used for construction
  • Send material to Initial Construction Department to fit-up all pieces, once pieces are fitted up. assembly is then moved to welding department
  • Weld up assembly's to standards of WPS on all Areas of Assembly.
  • Ensure quality welds are present, send to X-ray department for testing.
  • Ship final track off to destination
  • Dual shield .045,.052

Millwright/Welder

Ipec
Alpena, MI
12.2014 - 08.2016
  • Multiple Job Locations Across the United states, Requiring Many Skills and Techniques to adapt Achieve Successful Millwright Servicing, Equipment commissioning and repairs of various types and Size of equipment.
  • Operate all heavy equipment needed to complete the job
  • Performed the use of safe measures to complete all tasks. fill out JSA's according to task at hand
  • Cut,weld,fabricate steel to blueprint specifications

Equipment Involved

  • Conveyors
  • Dust Collection Systems
  • Kilns
  • Mills (ball mill, Vertical Raw Mills, Mills)
  • Hammer Mills
  • Clinker coolers
  • Compressor systems

Education

High School Diploma -

Priest River Highschool
Priest River, ID
2014

Skills

    Networking & IT

    Mechanical & Industrial

  • Smart Home Automation
  • Heavy Equipment Repair
  • Wireless networks
  • Hydraulics / Pneumatic Systems
  • Network Troubleshooting
  • Welding & Fabrication
  • Control4 Programming
  • Preventative Maintenance
  • Router & Switch Configuration
  • Electrical Diagnosis
  • Remote Technical Support
  • Conveyor Systems
  • Security Cameras & NVRs
  • Rigging & Hoisting

Certification

  • Comptia+ - In Progress
  • Control4 Associate Installer
  • Control4 Automation Programmer
  • Control4 Centralized Lighting
  • Lutron RadioRA2 Level 1 & 2
  • Lutron RadioRA3
  • Lutron HomeWorks QSX
  • Lutron Vive Integration
  • Lutron Lutron LP831 Ra
  • OSHA 10 November 2016 to Present
  • ELECTRICIAN APPRENTICE CARD March 2021 to March 2022 LIC/CERT # 052507

Timeline

Equipment Technician

Herc Rentals
10.2024 - Current

Installation/Equipment Manager

Technology Design Associates
08.2021 - 10.2024

Generator Technician

Northwest Generators
10.2020 - 08.2021

Ironworker/millwright (lead)

S&R Enterprises, LLC
09.2019 - 10.2020

Millwright Journeyman

A-Lert Construction Services
01.2019 - 09.2019

Millwright/Welder

WPS
06.2018 - 12.2018

Ironworker/Rigger

CCC Group
12.2016 - 07.2017

Welder

Integra beam
08.2016 - 11.2016

Millwright/Welder

Ipec
12.2014 - 08.2016

High School Diploma -

Priest River Highschool

Additional Information

I'd like to emphasize I am an on-time, punctual, forward thinking and creative person. I am a very quick learner when it comes to learning new skillsets and procedures. I have the willingness to take on difficult tasks outside of my comfort zone to improve not only myself  but others too. I always look for ways to improve