Accomplished professional with over 16 years of industrial fitting and welding experience, including leadership roles at MCI Inc. Expertise in safety protocols and strategic direction, with a proven track record of enhancing productivity and efficiency. Recognized for exceptional teamwork and communication skills, achieving significant project milestones and cost savings.
Overview
16
16
years of professional experience
1
1
Certification
Work History
Owner/Operator
The Jacked Tree Co.
02.2021 - Current
Safely and professionally removing and pruning hazardous and dangerous trees utilizing rigging and climbing systems.
Managed day-to-day business operations.
Provided exceptional customer service, addressing issues promptly to ensure customer satisfaction and repeat business.
Increased customer satisfaction by providing high-quality services and timely communication.
Trained and motivated employees to perform daily business functions.
Operations Manager
Innovative Plant Solutions
01.2025 - 04.2025
Overseen Lockout/Tagout procedures, confined space permits & JHA's for hydroblasting tanks, vessels and piping during shut downs.
Coordinated work plans with customers and my employees, ensuring a safe working environment at numerous Ethanol/Bio chemical facilities.
Supervised operations staff and kept employees compliant with company policies and site specific procedures.
Assisted in recruiting, hiring and training of team members.
Production Supervisor
Hitchdoc Mfg
01.2024 - 05.2024
Supervised daily production operations, ensuring adherence to safety standards and quality control measures.
Coordinated workflow across multiple teams to optimize efficiency and meet production schedules.
Trained new employees on operational procedures and safety protocols, enhancing team performance.
Implemented process improvements that reduced downtime and increased overall productivity.
Shift Supervisor
MCI Inc. (A Bechtel Specialty Company)
10.2017 - 07.2018
Trained and mentored specialty welder teams on welding procedures of large bore (36"-72") 100% RT stainless steel piping systems at Cheniere LNG
Supervised daily operations, ensuring adherence to safety protocols(Safe Work, Hot Work & Confined Space/Excavation permits) and quality standards
Coordinated shift schedules to optimize workforce efficiency and resource allocation across numerous craft and support craft
Oversaw the documentation of hours worked, controlled welding documents, time sheets & employee evaluations
One of my biggest accomplishments was when my 4 teams, along with my day shift welders, completed four 60" tie in welds three whole shifts ahead of schedule. This allowed the 1000ton Deep South spider crane to stay in place (costs $1M to move on/off sight) to set two dryers on top of the compressor decks. Reaching a milestone for the project but also saving millions in set up and teardown time for the crane.
Shift Supervisor
MCI Inc.
08.2013 - 03.2017
Basically all the same responsiblities listed with MCI Inc.
Supervised daily operations, ensuring adherence to safety protocols and quality standards.
Trained and mentored team members on best practices and operational procedures.
Coordinated shift schedules to optimize workforce efficiency and resource allocation.
Led team meetings to communicate objectives, address concerns, and motivate staff performance.
Enforced compliance with company policies and regulatory requirements during shifts.
Resolved conflicts among team members, fostering a positive work environment through effective communication techniques.
Trained new employees and delegated daily tasks and responsibilities.
Combo Welder/Certified Pipe Fitter/Boilermaker
Becon Construction(Bechtel)
02.2012 - 07.2013
Fabricated metal components using MIG and TIG welding techniques.
Conducted inspections to ensure adherence to safety standards and project specifications.
Mentored junior welders on best practices and safety protocols in welding operations.
Worked very closely with the welding engineers on this project becauseof my extensive knowledsge of the HRSG gas fired boilers and there components.
Was involved on this project all the way thru testing and commissioning the boilers.
I also oversaw the removal and preporation of valves internals and isolation of instuments prior to hydro testing as to avoid voiding warranties and damaging critical components of the systems.
Combo Pipe Welder
Shaw Group
12.2009 - 01.2012
Fabricated and assembled complex piping systems using MIG, TIG, and stick welding techniques.
Conducted quality inspections to ensure compliance with industry standards and safety regulations.
Directly involded in installing the underground Waste water, Storm water and Process water systems for the J.W. Turk coal fired power plant.
responsiblities included working with heavy escavation equipment, putting lines on coordinates.
Inspection of escavations and permitting, monitored soil conditions prior to backfilling after hydro testing and burial tape being installed was complete.
continued the systems up out of the ground into the water treatment part of the plant and throughout the jobsite.
Education
High School Diploma -
Jackson Vocational College
Jackson, MN
06-2005
Skills
3M Level 3 and Process Hazard Management Training (2026)
16yrs Industrial Fitting/Welding experience
Teamwork and Cross Craft Communication
Attention to detail with a strong emphasis on safety and the importance of the chain of command
Proficient with JSA, Safe Work Authorization, Escavations, Hotwork, Confined Space and all manner of Permitting
Analytical thinking with broad knowledge of Industrial standards and regulations