Delivered a waste storage pond project design, supporting permitting approvals and ensuring compliance with environmental and safety requirements.
Performed onsite construction observation to verify compliance with engineering design specifications and regulations.
Conducted pre-construction field investigations to assess site conditions and identify potential barriers to compliancy for the client.
Contributed to multi-agency emergency response operations involving hazardous air monitoring and environmental impact characterization following transportation and spill incidents.
Prepared technical documentation including design proposals, engineering site evaluations, stormwater permitting, and post-construction reports.
Project Management Engineering Intern
Cargill
05.2024 - 08.2024
Organized construction and installation projects while ensuring safety regulations of were met.
Coordinated project schedules and facilitated regular communication with contractors and stakeholders.
Validated process flow diagrams in manufacturing setting and documented changes to SAP system.
Research and Development Co-Op
Appvion
01.2023 - 08.2023
Designed and carried out multiple continuous-improvement projects aimed to develop formulations with a focus on cost-efficiency and low environmental impact.
Optimized performance of imaging appliance which provided insight into quality issues of the products received from supplier when performing a root cause analysis.
Established procedures to operate new thermal analytical instrument that provided additional methods to analyze material characteristics.