Skilled Superintendent offering 10 years of experience leading communication and operations to complete projects. Expert coordinator between teams, vendors and design professionals. Efficient problem-solver to keep projects on time and on budget.
Overview
12
12
years of professional experience
Work History
General Forman
Archer Western Construction
Pinellas Park, FL
10.2021 - Current
This project have over 30 bridges located in pinellas park and (275 N/275S ) I be part of all of supervision and construction of all super structure and sub structure (footer, column ,cap ,deck and place concrete .
Planned, managed and coordinated construction activities to ensure timely completion of projects.
Monitored work progress to ensure compliance with building codes, safety regulations and quality standards.
Supervised staff including subcontractors and laborers on assigned projects.
Inspected construction sites regularly to detect potential safety hazards and ensure compliance with safety protocols.
Collaborated with engineers, architects and other professionals to discuss plans and resolve design issues.
Coordinated material procurement processes with suppliers while ensuring timely delivery of materials at job sites.
Maintained accurate records of daily operations including time cards, production data logs.
Interpreted engineering drawings and specifications during construction process.
Resolved conflicts between workers regarding job assignments, methods, or deadlines.
General Forman
GPC join venture (high rise) Virginia
Chesapeake, Virginia
01.2021 - 10.2021
Build the special wall over river ( built with pre-fabricated concrete piles need drive in piles and build up the sub grade and make the new extension of the road over the river
Set concrete girders and pre-cast drainage between spam
Coordinate concrete placement
Coordinate inspection of work done
Analyzed job sites to mitigate risks
Planned and managed manpower and resource requirements to support project activities.
Tracked and reported units and labor hours prior to submission of timecards.
Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
Created work crew schedules and delegated assignments.
Trained and monitored employees to teach daily tasks and improve performance.
General Forman
Granite Construction
Cocoa, FL
11.2019 - 01.2021
This project is the brightline train running from. Cocoa to Orlando on this one I build the tunnel for cross 528 on cocoa beach
Ensured safety protocols were followed and maintained by all personnel on site.
Supervised, trained, and evaluated assigned personnel in accordance with company policies and procedures.
Provided technical advice to staff regarding operational issues and problems.
Monitored project progress to ensure efficient use of resources and timely completion of tasks.
Coordinated materials procurement with suppliers, contractors, and subcontractors.
Resolved conflicts between workers regarding job assignments, methods, or deadlines.
Reviewed estimates for labor costs, material costs, equipment costs.
Analyzed blueprints and other documents to plan layout of projects.
Managed budgeting process for projects while ensuring compliance with company standards.
Identified potential risks associated with each project before beginning work.
Interpreted engineering drawings and specifications during construction process.
Carpenter Foreman
Middlesex Construction Services
Orlando, FL
10.2017 - 11.2019
This project on particular is a doble deck multi level parking lot is amazing oportunidad on my career
Supervised and coordinated the activities of a team of carpenters to ensure projects were completed in a timely manner.
Provided technical guidance to carpenters as needed, monitored progress of assigned projects and addressed any issues that arose.
Interpreted blueprints or drawings for construction projects and ensured accuracy of measurements.
Inspected job sites before beginning work to identify potential hazards or risks.
Carpenter Foreman
Skanska/granite / lane
Orlando, FL
10.2014 - 09.2017
This project is on downtown Orlando name is i4 ultimate is about 168 bridge in total and all kinds structure amazing project
coordinated the activities of a team of carpenters to ensure projects were completed in a timely manner.
Ensured safety protocols were adhered to on all job sites, prepared work schedules and delegated tasks accordingly.
Provided technical guidance to carpenters as needed, monitored progress of assigned projects and addressed any issues that arose.
Carpenter Journeyman
Archer Western Construction
Daytona Beach, FL
08.2012 - 09.2014
Measured and cut materials to specified dimensions using hand tools, power tools, and machinery.
Installed cabinets, door frames, interior trim and hardwood floors as per specifications.
Inspected surfaces prior to installation to ensure they were free of defects or damage.
Built forms for pouring concrete foundations and slabs according to design specifications.
Constructed stairs and railings from a variety of materials including steel, aluminum, wood and composite products.
Erected scaffolding around work sites in order to safely reach higher elevations during construction tasks.
Assisted in loading and unloading supplies at job sites with the use of material lifts or other lifting devices.
Maintained an organized workspace throughout the duration of each project in order to avoid injury.