Highly-motivated professional with a strong work ethic, adaptability, and exceptional interpersonal skills. Very skilled at generating new business and managing existing relationships. Experienced in overseeing large scale construction projects, guiding initiatives affecting all areas of business and building and leading teams in a high pace environment. Customer- oriented, dedicated and hardworking with internal drive to deliver excellence. Driven and impactful leader who is passionate about people and safety. Well-versed in green energy technologies and benefits. Highly persuasive in closing sales and helping customers select optimal products and services with the desire to take on new challenges. Adept at working effectively unsupervised and quickly mastering new skills.
2.7 billion dollar construction project to expand fertilizer production to more than one million tons per year. This project had 5 phases in motion. It added a new water treatment facility that will allow the facility to stop using 1 million gallons of Enid's freshwater a day. It added a new UREA unit to ramp up production. It modernized and revamped the existing ammonia units.
Duties included:
Purpose of this construction expansion was on the existing Equistar Olefins manufacturing facility by adding two new 150KTA liquid cracking furnaces immediately adjacent to the existing furnaces currently in operation.
Duties include:
$7 billion construction project that began in December 2007, but was revised in late 2008 and early 2009 when Motiva decided to employ multiple major contractors to build specific parts of the expansion, which will bring its daily crude refining capacity to 600,000 barrels per day from its original 275,000 barrels per day. The completion of this expansion made the Motiva Port Arthur refinery the largest in the United States.
Duties included:
This construction project was an air quality upgrade to the existing Wet Gas Scrubber for the Fluid Catalytic Cracking Unit. The scope of the project included the installation of two new Selective Catalyst Reforming Reactors, the replacement of the unit’s flue gas duck work, replacement of the Quench Water System and the upgrade of three existing CO Boilers