Maintained Locusview completion package records. Trained several employees in completing all Locusview required documentation.
Collaborated with team members to streamline operational workflows.
Coordinated with the Construction Manager, Environmental Inspection, contractor dig crews, NDT, and Abatement to complete anomaly digs.
Monitored daily construction activities including ROW clearing, excavation, site restoration and final cleanup.
Tier 2 / Welding II
Northern Natural Gas
Welcome
06.2022 - 11.2022
Monitored project fabrication, in-service split tee installation and pipe welds to API 1104 and Client Engineering Specifications.
Monitored HDD, excavation of live lines, completed hot work permits, damage prevention, daily reports, completed weld maps and As-Build drawings.
Project consisted of installation of 2 miles 16”, launcher, receiver, calibrated pup, 3 bore sections & 2 hot taps to existing facilities.
Avery Technical Resources
Tier 2 / Welding II
Northern Natural Gas
Carlton
06.2021 - 11.2021
Monitored project fabrication and bore pipe welds to API 1104 and Client Engineering Specifications.
Monitored HDD, hydrovac to daylight live lines, scheduled NDE, completed hot work permits, damage prevention and daily reports.
Project consisted of installation of 24” launcher, receiver, meter run, calibrated pups, 3,000’ bore & Tie-ins to existing facilities.
Avery Technical Resources
Tier 2 / Welding II
Northern Natural Gas
Garner
06.2020 - 11.2020
Monitored project welding to API 1104 and Client Engineering Specifications.
Monitored excavation of live lines, backfilling, hydro vac, HDD, coating & test station installation.
Completed WIRs, Weld Maps, MTR & As-built drawings, Material List, Removal List, surplus material list, commissioning & pressure testing documentation.
Projects consisted of Hot taps, stopple, HDD, test station, regulator stations and Valve settings installations.
As well as coating removal, pipe removal, concrete placement, coating application & Nitrogen pneumatic testing.
Avery Technical Resources
Utility
Bridger Pipeline
Guernsey
11.2019 - 02.2020
Monitored project ROW clearing, topsoil stripping, grading, loading pipe from pipe yard to offloading pipe on ROW & landowner temporary fence installation.
Communication with chief inspector on landowner permission to access ROW.
Avery Technical Resources
Welding II
Northern Natural Gas
New Prague
05.2019 - 11.2019
Monitored project welding to API 1104 and Client Engineering Standards.
Monitored excavation, backfilling, HDD, coating & test station installation.
Completed WIRs, Weld Maps, MTR & As-built drawings, Material List, Removal List, surplus material list, commissioning & pressure testing documentation.
Projects consisted of Hot taps, HDD, Launchers & receiver facilities, clock spring, test station, Valve settings and piggable pipe installations.
As well as coating removal, pipe removal, concrete placement, coating application & Hydro testing.
Avery Technical Resources
Operations, Maintenance
Litkea Farms
New Lisbon
01.2009 - 10.2019
Family dairy production operation with dairy cows and dairy goats.
Preform production assistance, crop preparation / harvest, facility updates, constructing facilities, electrical installation and facility / equipment maintenance.
Utility II
Northern Natural Gas
Glenwood
03.2018 - 12.2018
Verified and completed turn over package documentation including reviewing Weld Inspection Reports, NDE documentation, Hydro & Nitrogen testing documentation.
Digitally completed weld maps, heat number identification drawings and dimensional as-built drawings.
Verified received, installed and surplus material, damage prevention permitting, scheduled NDE & abatement.
Projects consisted of but not limited to tie-over line installation, regulator installation, Horizontal Directional Drilling, Pipe removal & pipe abandonment as preparation for A-line disconnect.
Avery Technical Resources
Utility II
Northern Natural Gas
Northwood
08.2017 - 11.2017
Monitored construction progress, ensuring all work performed to be compliant with client safety, FERC and Client specifications.
Project consisted of mainline installation, Horizontal Directional Drilling, valve setting / Pipe removal, excavation/backfilling, valve setting installation and complete cleanup on ROW.
Avery Technical Resources
Civil Inspector
Enbridge
Portage
06.2014 - 12.2015
Monitored all construction progress, ensuring all work performed was compliant with client safety, environmental, and quality specifications.
Completed daily progress reports for excavation/backfilling near loaded lines, compaction dry density test results, concrete/epoxy grout work/test results, and any deficiencies that pertained to ongoing/upcoming construction.
Involved in project pipeline tie-ins and electrical tie-ins.
The project consisted of three booster pumps, a metering building addition, a master control building addition, electrical substations, and road replacement (Clearbrook).
And Pump Station, variable frequency drive precast building, substations, and electrical supply building (Portage).
Gulf Interstate Field Services
Education
CERTIFICATE OF COMPLETION -
AWS CWI Seminar
Milwaukee, WI
02.2018
DIPLOMA -
Brookwood High School
Ontario, WI
05.2005
Skills
Windows
Microsoft
Adobe
Bluebeam
Osha 30
Osha 10
Veriforce
Project Inspection
Operating heavy equipment
Tier 2 Northern Natural Gas Inspector
Spill Prevention
Control
Countermeasure
Stormwater Discharges
Permits in Construction
References
Robert Walter, Assistant Construction Manager/ Chief Inspector, (612) 859-0815
Program Support Assistant/ NPI, PECOS Coordinator at Tomah VA Medical CenterProgram Support Assistant/ NPI, PECOS Coordinator at Tomah VA Medical Center