Overview
Work History
Education
Skills
References
Skills Certifications
Timeline
Generic

Cody Sletten

New Lisbon

Overview

17
17
years of professional experience

Work History

Utility 2, Asst. Chief & Locusview Tech

Northern Natural Gas
04.2023 - Current
  • Maintained Locusview completion package records. Trained several employees in completing all Locusview required documentation.
  • Collaborated with team members to streamline operational workflows.
  • Coordinated with the Construction Manager, Environmental Inspection, contractor dig crews, NDT, and Abatement to complete anomaly digs.
  • Monitored daily construction activities including ROW clearing, excavation, site restoration and final cleanup.

Tier 2 / Welding II

Northern Natural Gas
Welcome
06.2022 - 11.2022
  • Monitored project fabrication, in-service split tee installation and pipe welds to API 1104 and Client Engineering Specifications.
  • Monitored HDD, excavation of live lines, completed hot work permits, damage prevention, daily reports, completed weld maps and As-Build drawings.
  • Project consisted of installation of 2 miles 16”, launcher, receiver, calibrated pup, 3 bore sections & 2 hot taps to existing facilities.
  • Avery Technical Resources

Tier 2 / Welding II

Northern Natural Gas
Carlton
06.2021 - 11.2021
  • Monitored project fabrication and bore pipe welds to API 1104 and Client Engineering Specifications.
  • Monitored HDD, hydrovac to daylight live lines, scheduled NDE, completed hot work permits, damage prevention and daily reports.
  • Project consisted of installation of 24” launcher, receiver, meter run, calibrated pups, 3,000’ bore & Tie-ins to existing facilities.
  • Avery Technical Resources

Tier 2 / Welding II

Northern Natural Gas
Garner
06.2020 - 11.2020
  • Monitored project welding to API 1104 and Client Engineering Specifications.
  • Monitored excavation of live lines, backfilling, hydro vac, HDD, coating & test station installation.
  • Completed WIRs, Weld Maps, MTR & As-built drawings, Material List, Removal List, surplus material list, commissioning & pressure testing documentation.
  • Projects consisted of Hot taps, stopple, HDD, test station, regulator stations and Valve settings installations.
  • As well as coating removal, pipe removal, concrete placement, coating application & Nitrogen pneumatic testing.
  • Avery Technical Resources

Utility

Bridger Pipeline
Guernsey
11.2019 - 02.2020
  • Monitored project ROW clearing, topsoil stripping, grading, loading pipe from pipe yard to offloading pipe on ROW & landowner temporary fence installation.
  • Communication with chief inspector on landowner permission to access ROW.
  • Avery Technical Resources

Welding II

Northern Natural Gas
New Prague
05.2019 - 11.2019
  • Monitored project welding to API 1104 and Client Engineering Standards.
  • Monitored excavation, backfilling, HDD, coating & test station installation.
  • Completed WIRs, Weld Maps, MTR & As-built drawings, Material List, Removal List, surplus material list, commissioning & pressure testing documentation.
  • Projects consisted of Hot taps, HDD, Launchers & receiver facilities, clock spring, test station, Valve settings and piggable pipe installations.
  • As well as coating removal, pipe removal, concrete placement, coating application & Hydro testing.
  • Avery Technical Resources

Operations, Maintenance

Litkea Farms
New Lisbon
01.2009 - 10.2019
  • Family dairy production operation with dairy cows and dairy goats.
  • Preform production assistance, crop preparation / harvest, facility updates, constructing facilities, electrical installation and facility / equipment maintenance.

Utility II

Northern Natural Gas
Glenwood
03.2018 - 12.2018
  • Verified and completed turn over package documentation including reviewing Weld Inspection Reports, NDE documentation, Hydro & Nitrogen testing documentation.
  • Digitally completed weld maps, heat number identification drawings and dimensional as-built drawings.
  • Verified received, installed and surplus material, damage prevention permitting, scheduled NDE & abatement.
  • Projects consisted of but not limited to tie-over line installation, regulator installation, Horizontal Directional Drilling, Pipe removal & pipe abandonment as preparation for A-line disconnect.
  • Avery Technical Resources

Utility II

Northern Natural Gas
Northwood
08.2017 - 11.2017
  • Monitored construction progress, ensuring all work performed to be compliant with client safety, FERC and Client specifications.
  • Project consisted of mainline installation, Horizontal Directional Drilling, valve setting / Pipe removal, excavation/backfilling, valve setting installation and complete cleanup on ROW.
  • Avery Technical Resources

Civil Inspector

Enbridge
Portage
06.2014 - 12.2015
  • Monitored all construction progress, ensuring all work performed was compliant with client safety, environmental, and quality specifications.
  • Completed daily progress reports for excavation/backfilling near loaded lines, compaction dry density test results, concrete/epoxy grout work/test results, and any deficiencies that pertained to ongoing/upcoming construction.
  • Involved in project pipeline tie-ins and electrical tie-ins.
  • The project consisted of three booster pumps, a metering building addition, a master control building addition, electrical substations, and road replacement (Clearbrook).
  • And Pump Station, variable frequency drive precast building, substations, and electrical supply building (Portage).
  • Gulf Interstate Field Services

Education

CERTIFICATE OF COMPLETION -

AWS CWI Seminar
Milwaukee, WI
02.2018

DIPLOMA -

Brookwood High School
Ontario, WI
05.2005

Skills

  • Windows
  • Microsoft
  • Adobe
  • Bluebeam
  • Osha 30
  • Osha 10
  • Veriforce
  • Project Inspection
  • Operating heavy equipment
  • Tier 2 Northern Natural Gas Inspector
  • Spill Prevention
  • Control
  • Countermeasure
  • Stormwater Discharges
  • Permits in Construction

References

  • Robert Walter, Assistant Construction Manager/ Chief Inspector, (612) 859-0815
  • Joey Madden, Chief Inspector, (318) 502-2300
  • Seth Green, Chief Welding Inspector, (409) 594-4022

Skills Certifications

  • Windows
  • Microsoft
  • Adobe
  • Bluebeam
  • Osha 30
  • Osha 10
  • Veriforce – 202
  • Veriforce – 203
  • Veriforce – 404
  • Veriforce – 607
  • Veriforce – 616
  • Veriforce – 619
  • Veriforce – 910
  • Project Inspection (FERC, PHMSA)
  • Operating heavy equipment (Farm)
  • Tier 2 Northern Natural Gas Inspector
  • Spill Prevention, Control, and Countermeasure
  • Stormwater Discharges and Permits in Construction

Timeline

Utility 2, Asst. Chief & Locusview Tech

Northern Natural Gas
04.2023 - Current

Tier 2 / Welding II

Northern Natural Gas
06.2022 - 11.2022

Tier 2 / Welding II

Northern Natural Gas
06.2021 - 11.2021

Tier 2 / Welding II

Northern Natural Gas
06.2020 - 11.2020

Utility

Bridger Pipeline
11.2019 - 02.2020

Welding II

Northern Natural Gas
05.2019 - 11.2019

Utility II

Northern Natural Gas
03.2018 - 12.2018

Utility II

Northern Natural Gas
08.2017 - 11.2017

Civil Inspector

Enbridge
06.2014 - 12.2015

Operations, Maintenance

Litkea Farms
01.2009 - 10.2019

CERTIFICATE OF COMPLETION -

AWS CWI Seminar

DIPLOMA -

Brookwood High School
Cody Sletten