Summary
Overview
Work History
Education
Skills
Timeline
Generic

Dalton Gearld

Vernon,TX

Summary

Skilled in electrical troubleshooting and demonstrating exceptional hand-tool proficiency, I significantly enhanced network reliability at Syntrio by meticulously installing and maintaining fiber optic systems. Experienced with programming and maintaining PLC systems for optimized industrial automation. Utilizes ladder logic and control system integration to enhance production efficiency. Installed, maintained, and repaired electrical systems, ensuring optimal performance. Utilizes advanced troubleshooting techniques to diagnose and fix electrical issues promptly.

Overview

10
10
years of professional experience

Work History

Ups Driver

UPS
09.2022 - Current
  • Followed all relevant traffic laws and safety regulations.
  • Utilized GPS and other navigation tools to plan routes and stay on schedule.
  • Achieved safe driving records by consistently following traffic rules and regulations.
  • Delivered goods and products to customer on time and in excellent condition.

Fiber Optic Technician/Construction Worker

Syntrio
07.2019 - 09.2022
  • Increased network reliability through meticulous fusion splicing, termination, and testing of fiber optic cables.
  • Enhanced network performance by efficiently installing and maintaining fiber optic systems.
  • Established, repaired and optimized networks by installing wiring,cabling, and devices.
  • Performed troubleshooting and equipment testing to identify and correct problems end to end and network-wide.
  • Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.

Construction Worker

Baker Forge
11.2017 - 06.2019
  • Achieved aesthetically pleasing designs through precise stone cutting and carving techniques.
  • Demonstrated strong attention to detail when measuring and cutting stones exact specifications guaranteeing seamless fit.
  • Operated skid steer to move stones and lumber for rock pathway, walls, waterfalls, and deck assembly.



HVAC Technician

Huber Heating & AC
07.2015 - 10.2017
  • Performed troubleshooting on HVAC systems to determine root cause of issues.
  • Installed new heating, ventilation, and air conditioning systems. Completing all electrical and refrigeration lines on residential and commerical buildings.
  • Utilized diagnostic equipment effectively in order to identify malfunctioning components within HVAC systems accurately.
  • Performed routine maintenance checks on electrical systems to prevent failures or malfunctions.

Education

Certificate of Completion Industrial Automation -

Vernon College
Wichita Falls, TX
05-2017

Skills

  • Electrical troubleshooting
  • Equipment maintenance
  • Heavy equipment operation
  • Fiber Optic Splicing
  • Lockout and tagout procedures
  • Welding techniques
  • Industrial Robotics
  • Control panel wiring
  • PLC programming
  • Ethernet and IP networking

Timeline

Ups Driver

UPS
09.2022 - Current

Fiber Optic Technician/Construction Worker

Syntrio
07.2019 - 09.2022

Construction Worker

Baker Forge
11.2017 - 06.2019

HVAC Technician

Huber Heating & AC
07.2015 - 10.2017

Certificate of Completion Industrial Automation -

Vernon College