Delivered precise instrument fitting services for tubing sizes from 1/16” to 1 1/2”, contributing to successful project outcomes.,Achieved seamless integration of instruments in autoclave applications, enhancing operational efficiency.,Promoted a proactive safety culture, leading to improved team awareness and safety compliance.
Work History
Instrument fitter
Contech Controls | undefinedundefined
Turnaround services/Maintenance services running tubing for flow transmitters, pressure transmitters, valves, analyzer tubing, rack tubing, air pipe, dekoron, mounting instruments mounting panels, reading and understanding P&ID prints and planning work.
Instrument Fitter
Excel | undefinedundefined
Demo old transmitters, tray, tubing and dekoron. Installing new instrument and equipment for refinery restart project.
Instrument Fitter/Tech
Houston Controls | undefinedundefined
Working with instrument tech stroking valves and retubing valves and transmitters as needed at the end of turnaround before startup.
Instrument Fitter
Azota Ltd. | undefinedundefined
New construction; Installing transmitters, installing tubing tray and tubing.
Instrument Fitter
Excel | undefinedundefined
Install Instruments and sample panels according to P&ID’s and package details. Route tubing from taps to panels. Run Dekoron throughout unit to transmitters with heat trace, wrap transmitter manifolds with heat trace.
Instrument Foreman
Houston Controls | undefinedundefined
Insure crew performs work in compliance with drawings, specifications and procedures. Coordinate assigned work with different crafts, departments, or other contracters. Assist in development of look ahead scheduling and daily progress reporting. Perform additional assignments per supervisors direction. Conduct daily morning toolbox safety meeting.
Instrument Fitter
CB&I | undefinedundefined
Install instruments, screw pipe, tubing tray, and tubing. Run 8 Line group tubing run of 1/2” tubing from compressor skid.
Instrument Fitter
Houston Controls | undefinedundefined
In the matter of time with Houston Controls of these years I worked at many locations in Mont Belvieu, Baytown, La Porte, Deer Park, Channelview, Matagorda and Seabrook. Running Dekoron, Tubing, Tray, and Screw Pipe. Mounting instrument stands, instruments and panels. Building panels in their shop, and doing analyzer work.
Instrument Fitter
4 Months
Excel Construction Group | 04.2026 - Current
Dismantled and reassembled delicate mechanisms.
Connected pipes through caulking, gluing and welding.
Thoroughly read and comprehended blueprints in order to understand how installation was to be performed.
Optimized calibration processes using advanced diagnostic tools, ensuring accurate measurements in instrumentation systems.
Instrument Fitter
2 Months
SpaceX | 02.2026 - 04.2026
Trained junior fitters on best practices for installation and calibration techniques.
Streamlined workflows by optimizing instrument fitting processes, enhancing efficiency.
Led projects focused on upgrading existing instrumentation for improved performance standards.
Developed training materials that improved onboarding processes for new technicians.
Installed and calibrated various instruments to ensure operational effectiveness.
Conducted routine maintenance and troubleshooting on equipment to minimize downtime.
Collaborated with engineering teams to interpret technical schematics and blueprints.
Assisted in the implementation of safety protocols for instrument handling and installation.
Ran performance tests and operated various control equipment.
Checked instruments for accuracy and calibrated to specifications.
Reduced maintenance costs by implementing preventive measures during instrument installation.
Instrument Fitter
3 Years 3 Months
Rush Resources | 05.2022 - 08.2025
Fabrication/installation of tubing, dekoron and autoclave.
Conducted routine maintenance on equipment to minimize downtime and enhance reliability.
Collaborated with engineering teams to troubleshoot and resolve instrumentation issues efficiently.
Assembled, installed, and tested various instrument systems according to technical specifications.
Documented calibration processes and maintenance activities for quality assurance purposes.
Instrument Leadman/Fitter
2 Months
Universal Plant Services | 10.2019 - 12.2019
Running tubing/Dekoron for pressure transmitters, Level transmitters, flow transmitters and pressure differential transmitters. Walking down prints and planning work for crew. Running 1/8” tubing inside of analyzer shelter. Glycol filling tubing lines. Pressure testing tubing.
Education
Diploma
Dayton High School | Dayton, Tx | 1 2012
Skills
NCCER Certified
TWIC
Able to read and understand P&ID’s
Operate scissor lift
JLG up to 120’
and up to 12k forklift
Problem solving
Communication
OSHA 10
Experience
01-2019
Timeline
Instrument Fitter
Excel Construction Group
04.2026 - CurrentRead More
Instrument Fitter
SpaceX
02.2026 - 04.2026Read More
Instrument Fitter
C2C Technical Services - Marathon Refinery Detroit, MI