Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Daniel Dallal

La Habra,CA

Summary

Preconstruction Superintendent with extensive experience at Kaiser Permanente, excelling in design review, carpentry and quality control. Earlier roles as a Carpenter, Foreman and Night Superintendent shows proven ability to lead teams, enhance project efficiency, and ensure compliance with safety regulations. Skilled in blueprint interpretation, rough and finish carpentry, implementing quality and infection control fostering a culture of excellence and proactive problem-solving in high-stakes environments.

Overview

12
12
years of professional experience

Work History

Preconstruction Superintendent

Kaiser Permanente
06.2024 - Current
  • Constructability review for multi-phase design of plans
  • Review Preconstruction requests and contractor reports
  • Coordinated site visit with architects, vendors, subcontractors
  • Schedule meetings with architects, engineers, project managers, construction manager, etc. to discuss project progress.
  • Conduct site inspections to maintain accuracy of design
  • Generate high hazard checklist
  • Generate project assessment form



Night Shift Superintendent

Kaiser Permanente
06.2021 - 06.2024
  • Monitored projects to maintain progress of construction. Met with foreman, carpenters, laborers and subcontractors to discuss any issues and conflicts with projects.
  • Maintained and executed CPFC quality control program for products, material, services and workmanship for all projects.
  • Read and interpreted blueprints with kaiser construction team and subcontractors to maintain accurate build consistency per HCAI and city requirements
  • Ensured compliance with safety regulations, conducting regular inspections and providing training to Kaiser construction team. Trained new employees and delegated daily tasks and responsibilities.
  • Enforced company policies and regulations with employees.
  • Resolved conflicts between employees to maintain positive and productive work environments.
  • Supervised ongoing daily production phases.
  • Attend weekly meetings with kaiser team to discuss weekly overview of projects.

Foreman

Kaiser Permanente
01.2014 - 06.2021
  • Supervise construction projects, with Kaiser construction team and subcontractors for accuracy of builds per the construction drawings.
  • Maintained and executed CPFC quailty control program for products, material, services and workmanship for all projects. Reviewed prepatory phase. Filled out initial and daily documents with subcontractor along with rework list if required
  • Met with Site safety representative periodically to walk job site to ensure safety protocols are being met
  • Checked equipment to determine if maintenance was required.
  • Assisted with build of temporary barriers per the Kaiser ICRA standards
  • Inspected completed work to verify quality standards and compliance with criteria per HCAI and city requirements per drawing specs.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Conducted thorough quality control checks per the CPFC quality control program to ensure high standards of workmanship across all projects.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Reviewed project details to specify correct materials and equipment for job sites.

Carpenter

Kaiser Permanente
10.2012 - 01.2014
  • Completed installations of building structures, framing, drywall, ceiling systems, flooring, doors, windows and cabinetry.
  • Read and interpreted blueprints to follow specifications of projects.
  • Followed and established job site safety regulations and maintained safe and clean work area.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Inspected job sites to identify potential hazards and establish protection and safety standards.
  • Assisted with build of temporary barriers per the Kaiser ICRA standards
  • Assisted in training new carpenters to demonstrate techniques, apply best practices and comply with protocols and regulations.

Education

High School Diploma -

Sunny Hills High School
Fullerton, CA
06-1997

Skills

  • Blueprint and schematics review
  • Constructability review
  • Software related skills in blue beam, excel, word, one note, one drive, power point and microsoft teams
  • Rough and finish carpentry
  • CPFC Quality control program implementation
  • Job planning
  • Staff training and development
  • Infection control (ICRA)

Languages

English
Native or Bilingual
Spanish
Professional Working

Timeline

Preconstruction Superintendent

Kaiser Permanente
06.2024 - Current

Night Shift Superintendent

Kaiser Permanente
06.2021 - 06.2024

Foreman

Kaiser Permanente
01.2014 - 06.2021

Carpenter

Kaiser Permanente
10.2012 - 01.2014

High School Diploma -

Sunny Hills High School
Daniel Dallal