Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Daniel Garcia Jr

Mercedes,Tx

Summary

Led commissioning efforts on new construction projects to streamline project start-up processes.,Acquired in-depth knowledge of hydronic oil flushing techniques with advanced chemicals and fittings.,Facilitated collaboration among teams to enhance project efficiency and effectiveness.

Overview

2
2
years of professional experience

Work History

Boilermaker

Tompson Construction Group
Bay Minette, AL
03.2026 - 05.2026

Assisted in performing hydronic oil flushes to maintain system efficiency. Supported technicians in executing hydronic oil flush procedures. Participated in the process of hydronic oil flushing to enhance equipment performance.

Assisted in the installation of fittings like JIC cam-locks and hoses for chemical applications. Supported the connection and maintenance of hoses and fittings in chemical handling processes. Helped ensure proper assembly of chemical hoses and fittings, including JIC cam-locks.

Assembled components and integrated them with hoses. Joined parts and securely attached them to hoses. Connected fittings and ensured proper attachment to hoses.

Boilermaker

Gulfspan Industrial
Port Arthur, TX
09.2025 - 02.2026
  • Fabricated and assembled metal structures using welding techniques and tools.
  • Interpreted blueprints and technical drawings to ensure precise measurements and specifications.
  • Conducted routine inspections of equipment to identify maintenance needs and safety hazards.
  • Collaborated with team members to improve workflow efficiency during project execution.
  • Maintained clear communication with supervisors regarding project progress and material requirements.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Used hand signals to notify crane operator to lift components to specific positions.

Boilermaker

Echo Maintenance
09.2024 - 10.2024
  • Removed slip blinds and secured flanges to ensure structural integrity.
  • Executed tasks under fresh air to unbolt components including blinds, spacers, and valves.

Education

High School Diploma - undefined

Weslaco East High School

Skills

  • Led teams to achieve project goals within scheduled timelines
  • Engaged actively in practical tasks to support team objectives
  • Took initiative on complex projects requiring effort and dedication
  • Consistently maintained punctuality in all commitments
  • Fostered positive relationships with colleagues across departments

Languages

Spanish
Full Professional

Timeline

Boilermaker

Tompson Construction Group
03.2026 - 05.2026

Boilermaker

Gulfspan Industrial
09.2025 - 02.2026

Boilermaker

Echo Maintenance
09.2024 - 10.2024

High School Diploma - undefined

Weslaco East High School
Daniel Garcia Jr