Completed Projects:
The Killearn Club - Golf Club - Tallahassee Fl.
installation of 200LF of 8" WM and 2" HDPE conduit , golf course irrigation pipe @ The Killearn Club golf course.
808 Bounce House - St.Augustine Fl.
installed 200LF of 2" Green HDPE FM pipe.
Marsh Landing Country Club - Golf Club - Palm Valley Fl.
500LF of 8" HDPE WM
500LF of 6" conduit
1200LF of 4" HDPE FM
400LF of 10" HDPE WM
2000" of 2" conduit
Bishop Kenny High School - Athletic Building - Jacksonville Fl.
installed 457LF of 8" HDPE WM
Cornerstone Classic Academy - New Addition - Jacksonville FL.
620LF of 8" FS
620LF of 4" WM
Projects List
4054 Alhambra Dr. - BULKHEAD - Jacksonville Fl.
220'LF of Poly Sheet Pile and tie back system with concrete cap.
1300 Ellis Rd. S Jacksonville FL.
land clearing-pond excavation-underground utilities ,storm, water, sewer -site prep-asphalt paving.
Emerald Trail - " MODEL MILE " Jacksonville Fl.
Demolition of existing roads ,curb and side walk. 1.5 Miles in all
installation of multi path trail bringing in into ADA compliance , pond overlook board walk , changing traffic patterns and adding parks improving Jacksonville's downtown area drainage system by adding more storm structures and curb inlets.
Baptist Hospital - Flemming Island-
site clearing and site prep. underground utilities , Lift station with grinder pump, storm, water, sewer and Fire Service piping and structures. Rough and finish grading parking lot prep base materials, curb, ADA ramps , ,sidewalks and pedestrian nature trail and asphalt paving.
SunnyPines RV Park - Jacksonville Fl.
site clearing and site prep. underground utilities , Lift station with grinder pump, storm, water, sewer and Fire Service piping and structures. Rough and finish grading, pond excavation. Installed water, sewer, power and parking for 65 lots .
Projects
Master Lift station rehabilitation ,Installing temporary Bypass system of station, Demolition of old mechanical and electrical control system. Repair of concrete walls and coatings, installing new gates, fitting new pumps, Retro fitting piping and valves . Adding new chemical system, controls , electrical.
Updating - Grit system - Trash compactor system -
Demo of existing equipment, pumps, grit snell ,screw auger, piping.
Installing Fluidyne Hydro Grit Vortex Separator and pumps,
Kuster*Water trash compactor system to fit existing bar screens, wash water system and electrical cabinet with controls. Installed new odor control system. installed handrailing and cat walk , mezzanine.
installed 2500'LF 8" C-900 reclaim water pipe over 115 MJ fittings and valves.
working at night using lane closures and MOT.
Installed 2" SCH 80 wash water pipe and nozzles
form reinforce and pour concrete stairs landing pads .
Erect Aluminum columns, stairs, platforms
Full rehabilitation of Head works , bar screen, yard piping, valves.
Full rehabilitation of Clarifiers concrete walls, Piping, coating, mechanical equipment, weir plates . 30" to 18" DI pipe , gravity sewer from Head to clarifier
installed new water well and piping to supply treatment plant.
install piping for new plant and chemical skid , install splash pads and over flow piping.
reshape site adding new swells and moving berms. connecting new plant and piping.
Full rehabilitation . demo everything but the existing building.
new pumps and piping 35' below surface . SINKING method of precast structure .
installed roof, windows, ventilation, controls.
installed new odor control system