Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Darrin Roehr

Vidor,TX

Summary

With a proven track record at B&E Resources, I excel in project coordination and problem-solving, enhancing productivity by over 30%. My expertise in cost control and fostering team collaboration has consistently driven project success, showcasing my ability to manage complex schedules and deliver on time.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Project Coordinator

B&E Resources
06.2024 - Current
  • Kept projects on schedule by managing deadlines and adjusting workflows.
  • Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.
  • Enhanced team collaboration through regular meetings, fostering a positive work environment for increased productivity.
  • Liaised between departments to facilitate communication and keep appropriate parties updated on project developments.
  • Bid jobs and procured material, schedule equipment, manage budget for job.

Superintendent

B&E Resources
11.2023 - 06.2024
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.

Superintendent

B&E Resources
09.2023 - 11.2023


  • Walk job with client, plan the work schedule, provide correct man power for specific job.
  • Control budget to match schedule as work progressed, communicated thoroughly with crew to stay on top of projects and making sure all outcomes were positive.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Provided updates to supervisors as well as client on progress of executed work scope.

General Foreman

B&E Resources
02.2023 - 09.2023
  • Worked alongside team to accomplish work goals according to schedule.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.

Foreman

Trade Construction Co
10.2022 - 01.2023
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.

General Foreman

B&E Resources
09.2021 - 10.2022
  • Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
  • Established open lines of communication with clients, providing regular updates on project status and addressing concerns promptly.
  • Analyzed ISO's to determine where to run piping, install piping valves and steel, and tie into process equipment.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.

Foreman

B&E Resources
03.2019 - 09.2021
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Monitored progress against established benchmarks, adjusting strategies as necessary to meet targets consistently.
  • Successfully mitigated risks associated with complex projects by conducting thorough risk assessments and implementing appropriate contingency plans.

Pipefitter

B&E Resources
08.2018 - 03.2019
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted ISO's, P&ID and other technical drawings to determine best installation methods.

Pipefitter

SMWP
07.2018 - 08.2018
  • Fabricated and installed screw pipe, socket weld pipe, butt weld pipe including carbon, steel, and stainless steel.
  • Maintained high-quality standards through consistent attention to detail while fitting pipes according to building specifications.
  • Reduced project completion time by interpreting ISO's, P&ID's, and specifications to accurately plan pipefitting installations.


Foreman

STI
04.2018 - 07.2018
  • Created and implemented plans to maximize efficiency of workers.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.

Pipefitter

STI
10.2016 - 04.2018
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted ISO's, P&ID's and other technical drawings to determine best installation methods.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Contributed to overall company success by maintaining a strong work ethic, adaptability, and commitment to delivering exceptional service on all projects undertaken.
  • Demonstrated versatility in skillset by working with various types of pipes such as Chrome, Stainless steel, steel, Carbon Steel among others.

Pipe Fitter

STI
02.2016 - 08.2016
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted ISO's, diagrams and other technical drawings to determine best installation methods.

Pipe Fitter

STI
10.2015 - 01.2016
  • Replaced faulty parts and repaired structural damages to pipes and related components.
  • Conducted comprehensive pressure tests to ensure integrity of piping systems, enhancing system reliability.
  • Delivered custom fabrication projects within tight deadlines, utilizing precise cutting and welding techniques to meet specific requirements.
  • Optimized workflow by organizing tools and materials beforehand, setting stage for efficient task execution.

Education

Bachelor of Arts - Mechanical Drafting

Lamar Institute of Technology
Beaumont, TX
04-2015

Skills

  • Problem-solving
  • Project coordination
  • Time management
  • Detail-oriented
  • Project management
  • Project scheduling
  • Spreadsheet tracking
  • Cost control
  • Forecasting
  • Scope management
  • Vendor management

Certification

  • Forklift Certification
  • [State] Driver's License
  • NCCER Pipe Fitter
  • Auto Cad Drafting
  • Excel
  • Blue Beam

Timeline

Project Coordinator

B&E Resources
06.2024 - Current

Superintendent

B&E Resources
11.2023 - 06.2024

Superintendent

B&E Resources
09.2023 - 11.2023

General Foreman

B&E Resources
02.2023 - 09.2023

Foreman

Trade Construction Co
10.2022 - 01.2023

General Foreman

B&E Resources
09.2021 - 10.2022

Foreman

B&E Resources
03.2019 - 09.2021

Pipefitter

B&E Resources
08.2018 - 03.2019

Pipefitter

SMWP
07.2018 - 08.2018

Foreman

STI
04.2018 - 07.2018

Pipefitter

STI
10.2016 - 04.2018

Pipe Fitter

STI
02.2016 - 08.2016

Pipe Fitter

STI
10.2015 - 01.2016
  • Forklift Certification
  • [State] Driver's License
  • NCCER Pipe Fitter
  • Auto Cad Drafting
  • Excel
  • Blue Beam

Bachelor of Arts - Mechanical Drafting

Lamar Institute of Technology
Darrin Roehr